All fit out/renovation activities carried out must pay attention to the condition of the surrounding units and public areas of the Orange County Apartment. And must follow all the
rules set by Building Management ("BM").
A. SHOWER
- Do not open the screen or top cover of the Floor Drain (FD). The screen filters particles such as: tissue paper, hair, plastic (other solid objects) so that they do
not enter the pipes which can cause blockages in the waste water pipes.
B. KITCHEN SINK
- Don't put anything into the sink hole (filter), such as food scraps and other solid objects that can block the drainage pipe. It is recommended not to remove the
Avur screen drain. If it is found that the water cannot drain, check the v trap and clean the filter.
C. WATER HEATER
-
The position of the Water Heater tube is above the ceiling, because the water source pipe installation and electrical installation have been provided
above the ceiling.
-
The maximum permitted water cylinder volume is <50 liters with a total weight <80kg.
If it exceeds 50 liters , Please coordinate with Building Management (BM) via Customer Service (CS)
D. WASHLET / E-BIDET
-
The recommended installation is to be planted in a wall area
-
Electrical cable protectors must use PVC high impact conduit (Recommended brands: Clipsal, EGA, Pralon, Legrand)
-
Electrical cable type NYM socket 3 x 2.5mm LMK / SNI STANDARD.
-
Inbow sockets must be provided with IP.55 enclosure protection
- Electric current leakage protection using ELCB.
-
This area is free from live electrical equipment, for example the Power Adapter is not placed on the floor, provide special placement (Housing).
-
Hand shower not used (removed and provided with DOP)
-
The area of the bathroom wall that is broken in must be coated with water proofing.
ELECTRICITY
-
Customers are not allowed to change the type of plug or socket without a fuse protector in it.
B. WATER HEATER
-
It is not permitted to place the socket under the ceiling to avoid splashes of water from the shower or pressurized hose.
-
It is not permitted to make new electrical installations with direct cable connections without going through a socket. Sockets and pipe installations are
provided above the ceiling.
-
It is not permitted to install outbow sockets where the cable pipe is clamped directly to the wall. Sockets and cable pipes must be embedded in the wall.
Update 200504
Machine Translated by Google
-
Adjust the strength of the current available through the MCB.
-
To increase the number of light points, 1 (one) light switch may only be loaded with a maximum of 4 light points or a maximum total load of 200 Watts.
-
It is not permitted to use 3-prong socket plugs stacked together to form one deep load point
distribute electric current.
E. GAS DETECTOR
-
Make sure the gas detector sensor is always connected to electrical power to detect gas leaks in the unit.
-
It is not permitted to move the gas detector sensor without BM's knowledge.
-
Especially at Tower Glendale, we are advised to use electric stoves. If you want to use a gas stove, residents are required to install a gas leak detection
device (gas detector).
F. BOX MCB
-
It is not permitted to replace the MCB without the knowledge of the BM (if this is violated, a fine equal to the cost of replacing the increase in electrical
power) will be imposed.
-
It is not permitted to cover the MCB Box with furniture or back the MCB Box with furniture which could complicate the repair process in the future.
-
If the interior design is facing away from the MCB box then consult with the BM.
AC (Air Conditioner)
-
When installing an AC, refrigerant pipes and drain pipes are provided in the Baywindow, and the Vendor is required to check the condition of these
pipes before installing the AC.
-
Before installing the AC unit, the Vendor is required to carry out a pipe leak test.
-
Vendors are required to bring equipment such as vacuum pumps, analyzers, pipe welders, etc., to support AC installation work.
-
When carrying out welding, you must bring an APAR
-
It is prohibited to install AC units other than in the places provided without permission from Building Management.
-
Match the wall outlet socket with the AC power plug.