Validate Print Help Item Rate BoQ

Tender Inviting Authority: Office of the Chief Engineer (NH) ,PWD, Konkan Bhavan, Navi Mumbai

Name of Work:Consultancy Services for DPR Preparation for widening of Ajanta Ghat to 4L+PS of NH-753F configuration in the state of Maharashtra.

Contract No:

Name of the
Bidder/
Bidding Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is li
tender. Bidders are allowed to enter the Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER # NUMBER #


Sl. Item Description Quantity Units BASIC RATE In TOTAL AMOUNT
No. Figures To be Without Taxes
entered by the in
Bidder in Rs. P
Rs. P

1 2 4 5 13 53
1 Key Personnel
1.01 Team Leader cum Senior Highway Engineer 6 Month #VALUE!
1.02 Senior Bridge Engineer cum Material-cum-Geotechnical
6 Month #VALUE!
Engineer- Geologist
1.03 Senior Survey Engineer cum Traffic and Safety Expert 6 Month #VALUE!
1.04 Environmental Specialist 3 Month #VALUE!
1.05 Quantity Surveyor/ Documentation Expert 6 Month #VALUE!
1.06 Land Acquisition/Forest/Utility Expert 6 Month #VALUE!
2 The vehicles provided by the Consultants shall 1 lumpsum #VALUE!
include the cost for rental, drivers, operation,
maintenance, repairs, insurance, etc.
A. For use of consultants

3 Duty Travel to Site (Fixed Costs) 1 lumpsum #VALUE!


4 Office Supplies, Utilities and Communication ( Fixed
Costs )
4.1 Office Supplies Drafting 1 lumpsum #VALUE!
Supplies computer
4.2 1 lumpsum #VALUE!
4.3 Running Costs 1 lumpsum #VALUE!
Domestic and International Communication
4.4 1 lumpsum #VALUE!
5 Reports and Document Printing
5.01 Inception Report
Environment and&Social
QAP Impact 3 lumpsum #VALUE!
5.02 Screening Report 4 lumpsum #VALUE!
5.03 Draft Feasibility Report 4 lumpsum #VALUE!
5.04 Final Feasibility Report 6 lumpsum #VALUE!
5.05 Strip Plan with L.A. Reports 6 lumpsum #VALUE!
5.06 Draft LA and Clearances I Report 4 lumpsum #VALUE!
5.07 Final LA and Clearances I Report 4 lumpsum #VALUE!
5.08 Draft Environmental Assessment report & RAP 4 lumpsum #VALUE!
5.09 Final Environmental Assessment report & RAP 6 lumpsum #VALUE!
5.1 Draft Detailed Design Report & Drawings etc. 4 lumpsum #VALUE!
5.11 Draft EMP 4 lumpsum #VALUE!
5.12 Draft Bidding Documents 4 lumpsum #VALUE!
5.13 Final Detailed Project Report with Bill of Quantities, 6 lumpsum #VALUE!
Cost Estimates, Updated Drawings ,etc
5.14 Final EMP 6 lumpsum #VALUE!
5.15 Final Bidding Documents 6 lumpsum #VALUE!
5.16 Draft 3(a) ,3(A) and 3(D) notification for land 9 lumpsum #VALUE!
acquisition ( 3 copies each)
5.17 LA & Clearances II Report 6 lumpsum #VALUE!
6 Survey and Investigation
6.1 Topographic Survey including hire charges for 1 lumpsum #VALUE!
equipment and supply of survey Teams comprising of
project survey field staff etc. inclusive of cost of
materials , labourer.
6.2 Detailed topographic surveys using Air Borne 1 lumpsum #VALUE!
Tomography and Air Borne LiDAR Technology
7 Investigation (Fixed cost)
7.01 Road and Bridge Inventory 1 lumpsum #VALUE!
7.02 FWD Test and Pavement Evaluation 1 lumpsum #VALUE!
7.03 Roughness Survey 1 lumpsum #VALUE!
7.04 Axle Load Survey 1 lumpsum #VALUE!
7.05 Material Survey and Investigation 1 lumpsum #VALUE!
7.06 Sub-grade Investigation 1 lumpsum #VALUE!
7.07 Traffic Survey 1 lumpsum #VALUE!
7.08 Socio-economic & Census Survey/ Studies 1 lumpsum #VALUE!
7.09 Land Acquisition Studies 1 lumpsum #VALUE!
7.1 Forest Department NOC 1 lumpsum #VALUE!
7.11 Any other investigations/surveys 1 lumpsum #VALUE!
8 NET WORK SURVEY AND GPR
8.01 Net work Survey of the existing Highways as a 1 lumpsum #VALUE!
responsitory for civil work as per direction from
Authority
8.02 GPR Survey for detection of under ground utilities 1 lumpsum #VALUE!
9 Cost of supply and fixing boundary pillars
9.1 Procuring and fixing boundary pillars and its 1 lumpsum #VALUE!
installation, complete in all respect as per
IRC:25,1967:Wherever the proposed alignment
follows the existing alignment, the boundary
pillars shall be fixed at an interval of 200m on
either side of proposed Right of Way. Wherever
there is a proposal of realignment of the existing
Highway and/or construction of New Bypasses,
Consultant shall fix boundary pillars along the
proposed alignment on the extreme boundary on
either side of the project Highway at 50 m interval.
(lumpsum )

10 Land acquisition Team including support staff and


logistics/transportation
10.1 Ex-Land revenue inspector/officer or equivalent 1 lumpsum #VALUE!
10.2 EX-kanoogo/Girdwar or equivalent 1 lumpsum #VALUE!
10.3 Ex-Patwari or equivalent 1 lumpsum #VALUE!
11 Logistic for Land Acquisition Team
11.01 computer including necessary peripherals 1 lumpsum #VALUE!
11.02 printers 1 lumpsum #VALUE!
11.03 Vehicles(Bolero or equivalent )with monthly 1 lumpsum #VALUE!
running limit of 4000 km
12 Income Tax (Expariate)( as per prevaling Norms) 1 lumpsum #VALUE!
12.1 Other Taxes / Duties (if any) Specify clearly 1 lumpsum #VALUE!
12.2 Goods & Service Tax ( as per prevaling Norms) 1 lumpsum #VALUE!
13 Sub Soil Investigation ( Boring)
13.1 a) Boring in all type o soils ( Other than hard rock) 1 lumpsum #VALUE!
13.2 b) Boring in Hard Rock 1 lumpsum #VALUE!
Total in Figures #VALUE!

Quoted Rate in Words #VALUE!


state of Maharashtra.

umns, else the bidder is liable to be rejected for this

TEXT #
TOTAL AMOUNT
In Words

55

#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!

E!