Culvert CH.199+650 (01.09.2022) 1
Culvert CH.199+650 (01.09.2022) 1
Culvert CH.199+650 (01.09.2022) 1
CENT.
REFER SEPARATE DRAWING
CUS
LHS
EC
RHS
EC
FOR U THROUGH WING 2.5% 2.5%
WALL
2
300
300
(MIN.)
1
2
700
EXP. GAP 40mm.
EXP. GAP 1
3000
EXPANSION GAP U/S
D/S 20mm 20mm
(MIN.)
I.L.-D/S :221.904 I.L. U/S :221.937
700
OGL : 222.237 SLOPE 1 IN 1000
300
400
300
100 THK. PCC LEVELING STONE APRON
COURSE IN M15 (TYP.) A
COMPACTED CURTAIN WALL
CURTAIN WALL EARTH TYPE II
TYPE I
SECTION : A-A
ROW
ROW
35000 35000
BARREL LENGTH 33000
ROW
ROW
14500 4000 14500
MEDIAN
CLOF PROPOSED
ROAD
B
ROW
ROW
1:2.0 1:2.0
2000
2000
ROW
ROW
6000
TO JAMNAGAR >>>
ROW
ROW
STONE APRON
(TYP)
10
0
ROW
ROW
92
92
10
0
20mm. 20mm.
CURTAIN WALL EXP. GAP EXP. GAP
350
TYPE-I
ROW
ROW
U/S D/S
CRASH BARRIER
CRASH BARRIER
7720 7720
ROW
ROW
U THROUGH
A 2.5% 2.5% U THROUGH A
18440
18440
4500
ROW
ROW
STONE APRON CURTAIN WALL
(TYP) TYPE II
350
500
ROW
ROW
10
<<< TO AMRITSAR
0
92
92
0
10
ROW
ROW
ROW
ROW
3000
2000
1:2.0
ROW
ROW
1:2.0
PLAN
(SCALE 1:100)
AUTHORITY ENGINEER:
CPC/P-70/NH-223/DPR/P&P/
CLIENT:- EPC CONTRACTOR:- DESIGN DIRECTOR: PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT:- PREPARED ALN TITLE: DATE:
TTL ENGINEERING Pvt. Ltd. GENERAL ARRANGEMENT DRAWING RCC BOX (SIZE 1 X 4.5 X 3.0 M)
RSIBPL - AGC (JV) 199+650 MARCH 2022
NATIONAL HIGHWAYS (A Joint Venture of M/s. A G Construction & MAHAMARG INFRA CONSULTANT CONSTRUCTION OF 6-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY DESIGNED AC
Rajendra Singh Bhamboo Infra Pvt. Ltd. )
SCO-5, 1st Floor, Sector 10A, FROM KM 170+000 TO KM 200+000 OF RAJASTHAN AS A PART OF
AUTHORITY OF INDIA Gurugram-122001, Haryana .
SCALE: SHEET: REV:
R0 Aug.2022 INITIAL SUBMISSION "AG TOWER", Plot No.303,N-3, CIDCO, Aurangabad-431003 (MS). P.K. CONSULTING ENGINEERS General Inquiry: info@mahamarg.com
Business: bd@mahamarg.com Office Address: SC0-75, 2nd Floor, HUDA Market, AMRITSAR- JAMNAGAR ECONOMIC CORRIDOR(EC) ON EPC UNDER CHECKED SS DRG. NO:
Ph. No. :- (0240) 2488283 PRIVATE LIMITED Mobile No.: +91-8883800021 Sector 10A, Near Hero Honda Chowk, LEA Associates South Asia Pvt. Ltd. BHARATMALA PARIYOJANA (AJ/SR-PACKAGE-7) AS SHOWN
(MINISTRY OF ROAD TRANSPORT & HIGHWAYS, E-mail ID :- agconstruction.abad@gmail.com / TC Tower, Metro Pillar No. 29,Near Gurgaon,Haryana Mobile: (+91)9818110963,
1 0F 3
REV. DATE DESCRIPTION Engr. D/M GOVERNMENT OF INDIA) agconstruction_abad@yahoo.in Mansarover Metro Station, Jaipur-302019 9818073509 Office: 0124-4276159
Email ID – info.ttlengineering@gmail.com
B-1, E-27, Mohan Cooperative Industrial Estate
APPROVED KP SIZE: A3 PKE/014/PKE-07/AJ/199+650/BOX-GAD/01 R0
Mathura Road New Delhi-110044, India
ROAD LEVEL RCC BOX CRASH BARRIER
300
1:2.0
1:2.0
350
150X150
HAUNCH (TYP.)
2.82 WING WALL 2.82 SIDE WALL
SLOPE E.Q E.Q E.Q
1 350 4500 350 1
300
100
SIDE WALL HAUNCH
3000
E.Q E.Q E.Q
150x150
100Ø WEEP HOLES @ 1000
c/c (HORZ. & VERT.)
(MIN.)
(MIN.)
700
STAGGERED
700
100
2 2
100
HAUNCH
100
OGL 1 1 OGL 400
300
2000 2000 CONSTRUCTION
JOINT
400
(MIN.) (MIN.)
STONE APRON
200
INVERT LEVEL BED LEVEL NOTES:-
250
450
U TYPE WING WALL
300
U TYPE WING WALL
750
CHAINAGES ARE IN KILOMETRES UNLESS OTHERWISE MENTIONED.
DK=1200
DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS
100
ARE TO BE FOLLOWED.
100
100
450
750
EC 2. THE BOX STRUCTURE IS DESIGNED FOR 40T BOGGIE , 70R WHEELED,
100
COMPACTED EARTH
150 150
(LHS/RHS) COMPACTED 100 THICK P.C.C. (M:15) 70R TRACKED & SV 385 VEHICLE WHICHEVER GOVERNS.
2500
AS PER MORTH 3. CONCRETE SHALL BE DESIGN MIX AND SHALL HAVE MINIUMUM 28
SPECIFICATION EARTH COMPACTED EARTH
COMPACTED EARTH
TS
750
450 750 450 AS FOLLOWS.
DIMENSION DETAIL OF CRASH BARRIER FOR DETAIL-A 100 THK. P.C.C. (M 15) . RCC BOX - M30.
SCALE:- 1:50 PCC M15 . RCC CRASH BARRIER - M40.
CULVERT (REFER SEPARATE DRAWING)
550
. U THROUGH WING WALL - M30.
4. CLEAR COVER TO OUTERMOST STEEL SHALL BE 50mm
100 THICK
100
FOR ALL COMPONENTS EXCEPT EARTHFACE WHERE IT SHALL BE
P.C.C. (M:15) 75mm.
5. ALL REINFORCEMENT SHALL BE TMT BARS WITH GRADE
199+600
100 1650 100
DESIGNATION Fe-500D CONFORMING TO IS:1786 STANDARD.
199+700
TYPICAL CROSS SECTION OF 6. BACK FILLING BEHIND EARTH FACE OF BOX AND RETAINING WALLS
CURTAIN WALL TYPE - I SHALL CONSIST OF SELECTED EARTH CONFORMING TO APPENDIX-6 OF
IRC:78-2014 HAVING PROPERTIES C=0, Ø = 30° AND d = 18KN/m3
PROW SCALE:- 1:50 7. WEEP HOLES SPACED AT 1000C/C BOTH HORIZONTALLY AND
PROW VERTICALLY SHALL BE PROVIDED IN A STAGGERED MANNER IN SIDE
WALLS OF BOX & U THROUGH WING WALL FROM 300mm ABOVE BASE
SLAB TO HFL.
8. ANY LOOSE POCKETS/VOIDS AT FOUNDING LEVEL WILL BE REMOVED,
750 THK. COMPACTED AND FILLED WITH PCC IN M15.
STONE APRON 9. FOR FORMATION LEVELS AND SITING OF THE CULVERT RELEVANT
BED LEVEL 200 HIGHWAY PLAN AND PROFILE DRAWINGS TO BE REFEREED. IN CASE
OF ANY VARIATIONS HIGHWAY DRAWINGS TO BE CONSIDERED
CORRECT.
450
U TYPE WING WALL
750
10. SAFE BEARING CAPACITY SHALL BE MORE THAN THE CALCULATED
BEARING PRESSURE. BEFORE EXECUTION OF CONSTRUCTION THE SBC
125 125
100
SHALL BE CONFIRMED AT SITE
750
11. CURTAIN WALL/ FLEXIBLE APRON SHALL BE PROVIDED FOR BOX
2000
425 450 425 100 THICK P.C.C. (M:15) CULVERTS/MNB LAID ON ERODABLE BED.
COMPACTED
EARTH COMPACTED EARTH 12. FLOW DIRECTION SHALL BE CHECKED AT SITE BEFORE EXECUTION.
PROW ANY DISCREPANCY IS TO BE IMMEDIATELY BROUGHT TO THE NOTICE
800
PCC M15 OF ENGINEER.
T 13. THIS STRUCTURE LIES IN SEISMIC ZONE III.
PROPOSED BOX CULVER 100 THICK 14. FRL IS TAKEN AT MEDIAN EDGE.
100
0
PROPOSED Km - 199+65 P.C.C. (M:15) 15. CONDITION OF EXPOSURE IS MODERATE
RCC BOX 100 1300 100 16. WC / BC SHALL BE LAID OVER THE TOP AS PER HIGHWAY DRAWINGS
TYPE OF STRUCTURE- WITH MINIMUM THICKNESS OF 50mm
SPAN- 1 X 4.5 X 3.0M 17. IN CASE OF CUSHION <300mm, SELECTED NON-PLASTIC MATERIAL
T. TYPICAL CROSS SECTION OF
PROPOSAL - NEW CONS
SHALL BE USED AS FILL MATERIAL UP TO THE ACTIVE WEDGE OF THE
CURTAIN WALL TYPE - II RANKINE SLOPE OF 45+Ø/2, FROM THE BOTTOM SLAB VIBRATORY
KEY PLAN SCALE:- 1:50 PLATE COMPACTOR OR SMALL WHEELED ROLLER SHALL BE USED FOR
DETAILS OF BOX CULVERT COMPACTION PARALLER TO THE EXTERNAL WALL IN LAYER BY
BEARING LAYER.
CAMBER/SUPER EC
LOCATION INVERT LVL.(M) EC LHS EC RHS PRESSURE 18. 600mm THICK FILTER MEDIA IS TO BE PROVIDED AS PER PER IRC 78:2014
PROPOSED FLOW ELEVATION CENTER
SKEW PROPOSAL (T/M2) (APPENDIX 6).
FRL DIRECTION
19. 3mm THK. FILETR FABRIC SHALL BE PROVIDED AS PER MoRTH
DESIGN CHAINAGE D/S U/S LHS RHS
SPECIFICATION CLAUSE NO. 702.1.
1.046 m 1.408m 1.046 m 12.00 20. TO MAKE EXPANSION JOINTS WATERPROOF, POLYSULPHIDE SEALANT
NEW
199+650 221.904 221.937 226.595 RHS TO LHS 0° 2.50% 2.50% TOGETHER WITH PRE-MOULDED BITUMINOUS SHEET IS TO BE
CONSTRUCTION
PROVIDED.
AUTHORITY ENGINEER:
CPC/P-70/NH-223/DPR/P&P/
CLIENT:- EPC CONTRACTOR:- DESIGN DIRECTOR: PROOF CONSULTANT: SAFETY CONSULTANT: PROJECT:- PREPARED ALN TITLE: DATE:
TTL ENGINEERING Pvt. Ltd. GENERAL ARRANGEMENT DRAWING RCC BOX (SIZE 1 X 4.5 X 3.0 M)
RSIBPL - AGC (JV) 199+650 MARCH 2022
NATIONAL HIGHWAYS (A Joint Venture of M/s. A G Construction & MAHAMARG INFRA CONSULTANT CONSTRUCTION OF 6-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY DESIGNED AC
Rajendra Singh Bhamboo Infra Pvt. Ltd. )
SCO-5, 1st Floor, Sector 10A, FROM KM 170+000 TO KM 200+000 OF RAJASTHAN AS A PART OF
AUTHORITY OF INDIA Gurugram-122001, Haryana .
SCALE: SHEET: REV:
R0 Aug.2022 INITIAL SUBMISSION "AG TOWER", Plot No.303,N-3, CIDCO, Aurangabad-431003 (MS). P.K. CONSULTING ENGINEERS General Inquiry: info@mahamarg.com
Business: bd@mahamarg.com Office Address: SC0-75, 2nd Floor, HUDA Market,
AMRITSAR- JAMNAGAR ECONOMIC CORRIDOR(EC) ON EPC UNDER CHECKED SS DRG. NO:
Ph. No. :- (0240) 2488283 PRIVATE LIMITED Mobile No.: +91-8883800021 Sector 10A, Near Hero Honda Chowk, LEA Associates South Asia Pvt. Ltd. BHARATMALA PARIYOJANA (AJ/SR-PACKAGE-7) AS SHOWN
(MINISTRY OF ROAD TRANSPORT & HIGHWAYS, E-mail ID :- agconstruction.abad@gmail.com / TC Tower, Metro Pillar No. 29,Near Gurgaon,Haryana Mobile: (+91)9818110963,
2 0F 3
REV. DATE DESCRIPTION Engr. D/M GOVERNMENT OF INDIA) agconstruction_abad@yahoo.in Mansarover Metro Station, Jaipur-302019 9818073509 Office: 0124-4276159
B-1, E-27, Mohan Cooperative Industrial Estate
APPROVED KP SIZE: A3 PKE/014/PKE-07/AJ/199+650/BOX-GAD/02 R0
Email ID – info.ttlengineering@gmail.com Mathura Road New Delhi-110044, India
SCHEDULE OF REINFORCEMENT
DIA SPACING
(ts3)+(ts6)
ts1 10 180
(ts6) (ts3)+(ts6) (ts6) (h1) ts2 260 260 10 180
(h1) ts3 8 180
260 260
12 @ 180
(L3) (L3)
ts4 12 180 8 @ 180
L2
L2
260 260
(ts4)
ts5 12 4- Nos.
ts6 260 260 8 180 10 @ 180
ts7 12 4- Nos.
bs1 230 230
8 200 12 @ 90
(ts1) (ts1) bs2 230 230
12 90 8 @ 200
(w1) (w2) (w2) (w1) bs3 10 200 12 @ 180
bs4 230 230 12 180 10 @ 200
(w3)
(w5)
(w5)
(w3)
bs1+bs5
200 NOT IN USE
(w5)
(w3)
bs2 bs5 230 230
8
w1 10 250 16 @ 180
(bs3) (bs3) (w2) 180
w2 8 250 12 @ 180
(bs2) (w1) S2 180
L2
L2
(h3) h1 12 180
bs4 300
bs3
SECTION Y-Y 300
A
h4 8 10 NOS.
L1 978+Ld 975+Ld
L2 736+Ld 450+Ld
L3 412 750+Ld
(ts4) L4 - 400
(ts2)
(ts5) L5 - 000
(bs4) LEGEND:
(bs2) (w4)
TOP/FAR FACE BAR SHOWN THUS
1000 1000 BOTTOM/NEAR FACE BAR SHOWN THUS
1000 1000
NOTES:
(w1) (w1)
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
2205 2205
SHEAR LINKS
(bs3)
DRAWING.
7. ALL REINFORCEMENT SHALL BE TMT BARS WITH GRADE DESIGNATION Fe-500D
CONFORMING TO IS:1786 STANDARD.
(ts1) 8. LAPS SHALL BE STAGGERED AND NOT MORE THAN 50% BAR. SHALL BE LAPPED AT ANY
LOCATION.
* 80 X DIA OF BAR
(bs1) ALTERNATELY S2 9. ANCHORAGE LENGTH SHALL BE PROVIDED AS PER CL. NO. 15.2.4 OF IRC 112 - 2011
(ts3) ALTERNATELY PLACED WITH (bs5) Y * 58 X DIA OF BAR
PLACED WITH (ts6)
10. ARRANGEMENT OF REINFORCEMENT IN LAP ZONE :-
< 50MM
3340 3180
< 4Ø
Ø
(w1) 1900 1900
(w1) Ls
1000 Y 1000 LAP LENGTH
(A) MAXIMUM SPACING BETWEEN TWO LAPPED BARS
NOT LESS
(w4) THAN 0.3 Ls
(ts5) Ls
DETAILS OF SHEAR >20MM
Ld=977.5(Top Slab)
REINFORCEMENT DETAILS OF TOP SLAB REINFORCEMENT DETAILS OF BOTTOM SLAB Ld=1012(Bottom Slab)
REINFORCEMENT ALONG >2Ø
(HAUNCH BAR NOT SHOWN IN PLAN FOR CLARITY) (HAUNCH BAR NOT SHOWN IN PLAN FOR CLARITY)
SCALE 1:50
LONGITUDINAL DIRECTION
SCALE 1:50
Ls
CPC/P-70/NH-223/DPR/P&P/
CPC/P-70/NH-223/DPR/P&P/
CLIENT:- EPC CONTRACTOR:- DESIGN DIRECTOR: PROOF CONSULTANT: SAFETY CONSULTANT: AUTHORITY ENGINEER: PROJECT:- PREPARED ALN TITLE: DATE:
RSIBPL - AGC (JV) TTL ENGINEERING Pvt. Ltd. GENERAL ARRANGEMENT DRAWING RCC BOX (SIZE 1 X 4.5 X 3.0 M)
CONSTRUCTION OF 6-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY 199+650 MARCH 2022
NATIONAL HIGHWAYS (A Joint Venture of M/s. A G Construction & MAHAMARG INFRA CONSULTANT DESIGNED AC
Rajendra Singh Bhamboo Infra Pvt. Ltd. )
SCO-5, 1st Floor, Sector 10A, FROM KM 170+000 TO KM 200+000 OF RAJASTHAN AS A PART OF
AUTHORITY OF INDIA Gurugram-122001, Haryana .
SCALE: SHEET: REV:
R0 Aug.2022 INITIAL SUBMISSION "AG TOWER", Plot No.303,N-3, CIDCO, Aurangabad-431003 (MS). P.K. CONSULTING ENGINEERS General Inquiry: info@mahamarg.com
Business: bd@mahamarg.com Office Address: SC0-75, 2nd Floor, HUDA Market,
AMRITSAR- JAMNAGAR ECONOMIC CORRIDOR(EC) ON EPC UNDER CHECKED SS DRG. NO:
Ph. No. :- (0240) 2488283 PRIVATE LIMITED Mobile No.: +91-8883800021 Sector 10A, Near Hero Honda Chowk, LEA Associates South Asia Pvt. Ltd. BHARATMALA PARIYOJANA (AJ/SR-PACKAGE-7) AS SHOWN
(MINISTRY OF ROAD TRANSPORT & HIGHWAYS, E-mail ID :- agconstruction.abad@gmail.com / TC Tower, Metro Pillar No. 29,Near Gurgaon,Haryana Mobile: (+91)9818110963, B-1, E-27, Mohan Cooperative Industrial Estate 3 0F 3
REV. DATE DESCRIPTION Engr. D/M GOVERNMENT OF INDIA) agconstruction_abad@yahoo.in Mansarover Metro Station, Jaipur-302019 9818073509 Office: 0124-4276159
Email ID – info.ttlengineering@gmail.com Mathura Road New Delhi-110044, India APPROVED KP SIZE: A3 PKE/014/PKE-07/AJ/199+650/BOX-GAD/03 R0