p.3 Public Works Projects To Be Surveyed

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Tribune (Philippines : 1932 - 1945), Sunday 3 January 1932, page 3

Public Works Projectsto Be Surveyed

WilliamsLeaveson Inspection
Trip
Tomorrow; 5,272,347
Ready -
P5,272,347 appropriated
With the for public works this year avail-
release, Director Williams,
able for A. D. of the bureau of public works,
will leave early tomorrow morning on an extended
tour of survey and
inspection undertaken
of the projects to be during the year. His first
inspection northern region of
point of will be the Luzon, where several
constructions immediately.
important public will be started
In his absenceMarcial Kasilag, Legaspi port, P85,000;Tobacco
construction division, (Albay), P50,000; Batangas; P20,000;
chief of the
acting director Ivanna (Batangas), P5,000; Basco,
willact as of the Tagbilaran,
bureau. Kasilag’s temporary appointment P5,000; Bohol, P10,000;
Washington,
was announced by Director Capiz, P40,000; New
simultaneously P20,000; Santa Fe, - Bantayan,
Williams yesterday
with his decision to survery(Cebu), P40,000; Opon, Cebu, P10,-
public works conditions
in the 000; Cotabato, P30,000; Davao,
P38,000; San Tsidro, P10,000; Apar-
provinces. ri, P40,000;Sulvec,Ilocos Sur, P40,-
Director Williams believes that Cabugao, Ilocos Sur, P40,000;
construction
000;
the immediate start of the Tacloban, P50,000; Leyte, P5,000;
projects important,
of the 1932 is Iligan. Tanao, P10,000; Calapan,
as it will offer one solution
unemployment
P20,000; Jimenez, Occ. Misamis,
to the problem in P25,000; Cagayan, Oriental Misa-
provinces. P1,1773,500
the The sums of mis, P20,000; Mambujao, Oriental
for public schools and other Misamis, P30,000; Naga Seawall in
unclassified buildings, P1,352,847
and of Cebu, P5,000; Pulupandan, P10,000;
for public roads and bridges, Dumaguete, P20,000; Lazi, Oriental
provincial laborers
will keep many Negros, P20,000; Coron, Palawan,
busy at least during considerable P20,000; Cuyo, Palawan, P10,000;
according
part of the year Borongan, Samar, P40,000; Catba-
to the director. logan, P20,000; Talabora, Samar,
Before announcing his forthcoming P20,000; Surigao, P40,000; Jolo,
departure to northern Luzon, P10,000; Mauban, Tayabas, P30,000;
Director Williams ordered the installation Atimonan Seawall, P20,000; Zam-
of a time bell in the bureau. boanga, P30,000.
Every employee is instructed
not to leave his desk until the bell
rings. The purposeof this is to
employees rushing
keep the from minutes
to the Bundy clock a few
dismissal
before the time of at
noon and at the close of the day,
according director.
to the
different
Work in the ports of
the Islandswill likewisebe started,
appropriations
being released and
distributed as follows:

Legaspi port, P85,000;Tobacco

National Library of Australia http://nla.gov.au/nla.news-article249600024

You might also like