Conversion of 12 No's Over Head Power Line crossings to U
Description
Length of Horizontle distance between Railway Boundaries
Type of Existing over head line circuit [Sigle circuit (SC) or Double circuit (DC)]
Existing No of Over head line Spans in railway boundary
Existing overhead line strcture type (Poles/ Steel strcture (M type/ H type Etc.,)
Type (AAAC, ACSR Etc.,) & size (Cross section area ) of the Over Head Line of the conductor
Horizaontle Width of track formation Including Shoulders for horizontle boring
Cable trench required in normal soil
Cable trench required hard rock soil
Length of the HT Cable Required (DP Height+Ring/Loop+ Horizontle crossing+ DP Height+
Rings/Loops)
Adress& Contact of the Concerned DEE /Operations/DISCOM for correspondance (To obtaIn
Supervision Charges & Line Clear (LC)
Power Line crossings to Under Ground Power Line crossings in SC Div {Umbrella Work 2024-25}
DKJ Depot DKJ Depot DKJ Depot MTMP Depot
Sq mm
- - -
(185/240/300/400)
DE/O/KMT DE/O/KMT DE/O/KMT
9440811506 9440811506 9440811506
ADE/O/KOTH ADE/O/KOTH ADE/O/KOTHA
A LINGAlA A LINGAlA LINGAlA
9440811518 9440811518 9440811518
Umbrella Work 2024-25}
MTMP Depot MTMP Depot MAGH Depot RDM Depot