Risk Assessment For Purified Water
Risk Assessment For Purified Water
Risk Assessment For Purified Water
PRETREATMENT SYSTEM
1. Bore well
The quality of Yes The final desired No NA High Ultra filtration Acceptab IQ
the bore water quality will followed by le
water
water is not not be attained. Industrial R.O to be
(Raw good it has considered before
water) high TDS the final RO.
and silica
content.
MGF shall be
considered in design
to filter & remove
suspended impurities
from bore well water.
of the system.
2. Bore well
Increased Yes The system shall be Operation Frequent Low The raw water from Acceptab IQ &
microbial and inefficient to remove al changes of the bore well shall be le OQ
water
particle the increased the RO transferred to a closed
(Raw contaminati microbial and membrane underground raw
water) on of the particulate water storage tank.
infeed raw contamination.
water
Water cannot Yes This is required No NA Low Tank bottom shall be Acceptab IQ &
Bore well
be during cleaning of the sloped to a small sump le OQ
water
withdrawn tank or when tank is from where water can be
3.
(Raw completely contaminated pumped out.
water) from the chemically or
storage tank
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
microbiologically.
Tank is directly Yes This may lead to Operation Cleaning of Mediu The tank shall be Acceptab IQ
Bore well
exposed to increased microbial al the tank will m properly closed with lid le
water
4. environment and particulate be difficult.
(Raw contamination
water)
Bore well
Cleaning of Yes After a long period of No NA Low The tank shall be Acceptab IQ &
the time the microbial provided with man le OQ
water
undergroun d and particulate entry for cleaning in
(Raw storage tank contamination may regular interval.
water) is not be increased and the
possible. system may be
inefficient to remove
The SOP for
5. cleaning shall be
the increased
prepared and the
microbial and
frequency of the
particulate
cleaning shall be
contamination. established.
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
6. Bore well
Insufficient No The quantity of raw Operation The process Low The raw water Acceptab IQ &
quantity of water shall not have al may stop due to storage tank shall be le OQ
water
raw water. any impact on the lack of raw sized as per the
(Raw product quality. water. downstream
water) requirements.
7. Bore well
Tank wall Yes Unexpected EHS Water may be High RCC Injection Low IQ
and floor is intrusion of micro- contaminated grouting should be
water
not leak organism by sewage recommended inside
(Raw proof water or the tank.
water) contaminated
In regular basis tank
by heavy
should be inspected
minerals. for any
cracks.
8. Bore well
Sampling of Yes The bore water No NA High Sampling point to be Acceptab IQ
the bore well quality shall decide provided for le
water
water is not the final purified sampling of bore
(Raw water
well water.
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
9. Bore well
Overflow of No Over flow water Operation Spillage of Low The ground water storage Acceptab IQ
raw water in shall not affect the al excess water tank shall be provided le
water
undergroun d product quality requires with level indicator for
(Raw storage tank. frequent high water level in the
water) cleaning of tank.
the area.
Loss of
resources
i.e. water
During validation
sanitization process
and frequency is to be
established. SOP
should be written,
confirmed
and implemented.
Contaminati
on of the RO The coarse The RO unit
unit particles shall be shall be Multi grade filter shall be
Water with the removed in the RO Operation choked and Acceptab
provided for the filtration
12. filtration coarse No and hence no impact al damaged by the Low le IQ
of coarse particles.
suspended on the product quality coarse particle
particles in
the raw
water.
14. Multi Material of No NA Operation Iron and rust Low The Multigrade Acceptab IQ
Grade construction is al particles may filter MOC to be le
Filter not carry over with well designed.
compatible water and
with water in increases the
long run as the load on the
Fiber reinforced
plastic (FRP) is
water has down stream
recommended.
chlorine equipment.
content. Life time of
the
equipment
will come
down.
Multi Microbial Yes During non No NA Mediu Filter will be Acceptab IQ &
Grade growth in operation of the m designed to be le OQ
Filter MGF system the water complete drainable
17. hold up will be type to avoid such hold
stagnant and up and installation of
possibility for pressure gauges.
microbial growth.
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
As the water is
chlorinated the
possibility of
microbial growth is
considerable less.
Mineral
Material of particles may The Softener MOC to
construction is carry over be well designed.
not Operation
with water and Fiber reinforced plastic Acceptab
22. Softener compatible No NA al Low le IQ
increase the (FRP) is recommended
with water load on
in long run.
the
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
downstream
equipment.
Life time of the
equipment
will come
down.
The raw
The RO unit Ultra filtration shall be
water has Feed water to RO shall
shall be provided before RO to
23. Filtration high slit Yes have high slit density Operation Hig h Acceptab IQ
al choked and reduce the slit density le
density index
damaged index
index
Tank to be
designed with
compatible media to
Iron and rust
Ultra- particles carry
with stand the property
filtered water of the
over
storage tank water. (HDPE/SS304
with water
Water MOC is not Recommended) with
increase the load
collection compatible level switch
on the down
tank (After Operation and sampling Acceptab IQ &
26. . No NA stream Low
Ultra al points. le OQ
Tank cannot equipment.
filtration) Life time of the Proper cleaning
be
equipment will method and
cleaned
come interval will be defined
properly.
down. in the SOP.
Provision for Hot water
sanitization
should be available.
System should be
If sufficient designed in such a way
water flow is that the ultra filtered
not water to be collected in
available a UF storage tank with
cavitation of level indicator and
Feed Pump
Water flow the pump controller to give an
for Operation Mediu Acceptab IQ &
28. rate is not No NA takes place. undisturbed continuous
Reverse al m le OQ
sufficient. flow to the R.O. feed
Osmosis Pump can’t
pump.
deliver the
required Low pressure
pressure of switch shall be
R.O system. provided at the
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Alarm to be provisioned
in case of high
conductivity &
low/ high feed to
RO.
FINAL TREATMENT
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
human errors.
Various
process The unit shall be
parameter provided with the
like pH, provision for
Critical GMP monitoring, indicating
conductivit process parameter.
y, flow and
RO+EDI Water quality could controlling the, Acceptab IQ &
41. rate, TOC are Yes No NA High
unit not be checked conductivity, TOC and le OQ
not
monitored. flow rate of water.
Sampling Sampling point after
point after EDI shall be provided
EDI not
provided
interval for
sanitization shall be
adopted during
validation.
Alarm to be provisioned
in case of low level.
Water stagnant
in Spray balls will be
PW the purified Possibility of Acceptab
considered at the return
46. Storage Yes No NA High IQ
water Microbial growth. flow to create proper le
Tank collection agitation.
tank.
Temperature indicator
Storage tank Control of Temperature is key cum
Temperatu tank parameter for hot controller shall be
Mediu Acceptab
48. re temperature is Yes water No NA provided for IQ
m le
not monitoring of
sanitization
provided. storage tank
temperature.
Filter housing
should be equipped with
ports for integrity test.
Filter integrity test at
Filter integrity Testing of filter not regular intervals.
IQ,
51. Vent Filter not possible Yes attained , risk of No NA High Regular exchange of Acceptab
OQ &
contamination filter cartridges le
SOP
(exchange in
controlled area)
SOP’s: Filter tests;
Maintenance
DISCHARGING OF OUTPUT
The water
Water Water distribution shall be in a
stagnancy in contamination may loop system. The water
the increase shall be in continuous
distributio n due to the bio-load flow in the loop.
line to in the distribution Removal of All pipelines shall have
different user line to different user stagnant water drainable slope of >
Distributio n points. points. Operation each 1:100. Acceptab
53. Yes High IQ
al time before use Discharge pump should le
Sampling point is shall be very b self- draining type.
No
required to check difficult. The dead leg in the loop
sampling
water quality in loop shall not be
point
and user points more than 1.5d. (d-
provided.
diameter of the
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
extended part)
Zero dead leg type
sampling points shall be
provided at return loop
and all
user points.
Conductivity sensor
shall be
provided in the
High conductivity
High return linewith
water may
Distributio n conductivity in auto-dumping facility Acceptab IQ &
56. Yes contaminate the fresh No NA High
return line in case of high le OQ
Purified water
conductivity.
Alarm provision in
case of high
conductivity.
Online TOC
analyzer to be installed
at return line to tank.
57. Distributio n High TOC Yes Performance No NA High Provide auto- Acceptable IQ &
failure OQ
dumping valve
coupled with TOC
analyzer.
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Alarm provision.
A suitable
Sanitization process
shall be
provided in the
PLC for effective
sanitization of the PW
storage tank
and distribution
PW system.
Storage tank Tank should be jacketed
58. Sanitization not Yes Possibility of No NA High and should be plant Acceptab IQ &
& Distributio
possible microbial growth steam supply for heating le OQ
n System
of water during
sanitization.
Temperature sensor
shall be provided in the
PW storage tank and on
return line to monitor
temperature during
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
sanitization.
Tank jacket shall be
insulated to prevent loss
of heat during
sanitization.
Alarm to be provisioned
in case of High/ low
temp.
during sanitization.
Equipment Construction
Internal Surface
Pre-treatment stage
- all
Internal interconnecting pipes,
surface/ dosing tanks, sampling
contact parts is May lead to the valves shall be Acceptab
59. Surface not compatible Yes water No NA High UPVC or SS 304 and IQ
le
with the contamination the storage tanks
water shall be of HDPE.
After second pass RO
- Metallic
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
recommended.
External Surface
PLC/Control System
The equipment shall
Process Possibility of human control & detect failure
Process parameters are error leads to a mode automatically.
not Acceptab IQ &
67. automatio n Yes process No Na High The System shall OQ
controlled which is not validated le
be PLC based and
automaticall y.
fully automatic.
Monitoring/ It should be
recording and possible to
documentati monitor/record GMP
Man-
71. on of GMP Yes Basic GMP No NA High relevant data (e.g. Acceptab OQ
machine
relevant data requirement recorder with le
Interface
not compliance to
possible GAMP 5 / 21 CFR,
Part 11 etc.)
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Control
system does Process optimization Failure of set parameters
Control not detect and validation is not gets indicated as alarms Acceptab
72. Yes No NA High OQ
system failures and possible and machine stops. le
generate
alarms
Operator settings
unchanged and
restored after
PLC / Power May lead to emergency stop / power
Control failure / Process out of some accident failure; Acceptab
73. Yes EHS High OQ
system emergency specification Alarm message; le
stop Machine must not start
automatically without
operator
intervention after
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
incident
SOP for
‘Maintenance and
operation of PW
Generation,
Storage &
Distribution
System’.
Status parameters
should remain
displayed at each
Process for the process stage.
PLC / Status particular product at The flow of the process
74. Control parameters Yes particular stage can’t No NA High shall be provided with Acceptab OQ
system not clear be regulated easily. the help of arrows. le
Alarm should also be
visualized along with
the fault
displayed.
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Supplier analysis
(quality management
system for software and
control system
hardware development)
Input/ Output test
implementation in
Correct function qualification activities
PLC / basic requirement for The system must
Control Acceptab
75. Malfunction Yes GMP- compliant No NA High contain all OQ
system le
operation necessary protection
devices to
ensure that the
equipment and
article remain in
safe condition.
Parameter
Accessibil settings not Basic GMP Parameters settings Acceptab
76. Yes No NA High should be in numeric OQ
ity to PLC identified requirement le
only.
universally
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
PLC Clock
Time verification
PLC / measuremen t Process SOP “calibration Acceptabl e OQ &
77. Control works Yes insufficient No NA High and maintenance” SOP
system incorrect Time
synchronisation of
system
Minimum 3 level
password protections
should be provided.
No protection Level 1: for
of PLC operator settable
PLC / against parameters.
78. Control manipulatio n Yes
Basic GMP
No NA High Level 2: for Acceptab
OQ
system & changes. requirement. editing cycle le
parameters.
Level 3: for
admin/
engineering level
setting.
Measuring Instruments
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Measuring instruments
must have
a suitable
measuring range.
Measuring Measuring Operational range of
79. instrument s instruments Yes Improper No NA High measuring Acceptab IQ
not suitable measurements instruments > le
instrument working
range.
They must have
appropriate
accuracy.
Mounting of
instruments must give
the possibility for
GMP
Measuring Defective instruments dismounting and
relevant
instruments must be dismounted replacement
measuring Acceptab
80. instrument s cannot be Yes for exchange and No NA High Constructional solution: le IQ
dismounted calibration easy
access for
calibration
activities shall be
given
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Measuring instruments
Instrument s should be calibrated,
not traceable to
Measuring Non calibrated national or
calibrated. international standards.
81. instrument s Yes instruments may lead No NA High Acceptab IQ &
Re- to false machine Re-calibration of le OQ
calibration is functions instruments should
not be possible.
possible
Cleaning and
sanitization Cleaning process shall
Cleaning process Possibility of human be performed by a
and parameters are error leads to a automatically
IQ&
84. sanitizatio n not Yes cleaning procedure No NA High controlled system. Acceptab
OQ
automatio n controlled which is not validated Suitable PLC le
automaticall y control shall be
considered
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Maintenance
Machine shall be
easy to maintain.
Maintenan
Malfunction s
Basic GMP Preventive maintenance Acceptab IQ &
86. due to worn Yes No NA High procedure should
ce requirement le SOP
parts be available
The unit must
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
contain necessary
protection devices to
ensure that the
equipment & the
article remain in a safe
condition.
Distribution system
will be
stopped and water A standby pump
PW Discharge may become Operatio Generation should be provided. IQ &
stagnant leading
87. distributio n Pump No
to decrease in
nal gets Medium Alarm provision in Acceptable OQ
system failure affected case of pump
temperature and
overload.
hence increase in
bio burden.
System Safety
All electrical
Electrical It will not affect the systems shall be tested for
Electrical systems are not final quality of May lead to Mediu safety and shall be Acceptab
88. No EHS IQ
system verified for water. an accident m provided with safety le
safety markings
e.g. C.E. marking.
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Emergency stop
function is Emergency stop with
Instantaneo us Does not have any
required for alarm to be installed on
stopping of the impact on quality of
Emergenc y accessible areas on PW IQ &
90. equipment not No EHS equipment, High
stop the product
personnel and generation as well as Acceptable OQ
possible
distribution system.
product
protection
Compressed air
Improper function of pressure shall be
pneumatic May leads indicative with alarm if
91. Utility Compressed air Yes instruments leads to Operatio improper High low. Acceptab IQ &
Failure is low improper output. nal function of The total system shall le OQ
the system be shut down
if the compressed air is
low.
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Steps/ Risk GMP Risk Justification Other Justification Risk Risk Control (9) Status of RA
(1) Component (3) Yes/No (5) Risk (7) Level (10)
(2) (4) type (6) (8) Mitigation Method (9a) Residual Test
Risk level Docume
(9b) nt
(9c)
Documentation
operation, setting
parameters, trouble
shooting &
maintenance related
activities.
Operation SOP
does
not contain System operation SOP
94. User proper Yes User may make a No NA High must be reviewed with all Acceptab OQ
information wrong decision. aspects and approved. le
and user
may operate
system
restricted.
Vendor documentation
shall comprise:
Material certificates
Welding
Adequate technical certificates along
documentation is with welder
Technical basic GMP qualification certificate.
Vendor documentati requirement for Boroscopy reports
96. Yes No NA Mediu Acceptab IQ
Documenta on from qualification and m Slope Verification le
tion vendor not operation of the report
adequate System Pressure leak test
report
Passivation report
Operating
instruction
More than 2000 document related to pharmaceutical Industry in
Pharmatalks Telegram community👇👇👇👇 t.me/Pharmatalks
S.No. Process Risk GMP Justification Other Justification Risk Risk Control (9) Status of
(1) Steps/ (3) Risk (5) Risk (7) Level RA
Component Yes/No type (8) Mitigation Method Residual Test (10)
(2) (4) (6) (9a) Risk level Docume
(9b) nt
(9c)
Maintenance
instructions
Spare part lists
Drawings
- P&I-diagrams
- Electrical
diagrams
Functional
desig
n specification
HMI functions with
screen shot
List of failure
indications