WELDING PROCEDURE SPECIFICATION

Sulut-1
Coal Fired Steam Power Plant 2 X 50 MW
(Sulut-1 CFSPP Project)

Date: CIVIL
Log
in
Comm No: MECHANICAL

ELECTRICAL

REVIEW

A APPROVED
I&C PLN DOC. NO. :
SUPPORT
B ☐ APPROVED AS NOTED

C ☐ NOT APPROVED
CONTRACTOR DOC. NO. :
PLN UIP SULBAGUT S1-PP-000-ISP-WPS-00001
I ☐ INFORMATION
PLN UPP SULUT

REVIEWED DOES NOT RELIEVE CONTRACTOR


FROM RESPONSIBILITY FOR ERROR OR PLN PUSENLIS (JKT)
DISTRIBUTION

DEVIATIONS FROM CONTRACT


REQUIREMENTS PUSMANPRO (SMG) CONTRACT NO. :
PUSMANPRO (SITE) 0852/SPS/SCM/PP/EPC/719004/1/2022
By: Date:
CONTRACTOR (JKT)

Date: CONTRACTOR (SITE)


Log
Note:
Out
Comm No:

REV DATE PURPOSE OF ISSUE PREPARED CHECKED APPROVED AUTHORIZED


WELDING PROCEDURE
SPECIFICATION
For
Sulut-1 CFSPP Project
Contractor Doc No:S1-PP-000-ISP-WPS-000001
Issued 2022-04-12 Rev. 0 Page 2 of 3

REVISION HISTORY

Rev No. Date Description


0 12-April-2022 Issued for Approval
WPS LIST FOR PROJECT COAL SHED PLTU
SULUT-1 CFSPP ( 2X 50 MW )
Thickness Range (MM)
WELDING
NO WPS NO STANDARD FILLER METAL GAS / SHIELDING SPECIMEN KUPON BASE METAL WELDING POSITION JOINT DESIGN
PROCESS
GROOVE FILLET

1 W01-GMAW-AWS-2022 GMAW AWS D1.1 : 2020 ER70S-6 CO2 PIPE to PIPE STK-400 3 - over 3 - over 6G SINGLE V - GROOVE, backweld

2 W02-GMAW-AWS-2022 GMAW AWS D1.1 : 2020 ER70S-6 CO2 PIPE to PLATE STK-400 3 - over 3 - over 5F FILLET WELD