A static load test was performed on a service pile over multiple days to test loads up to 450 metric tons. The pile was loaded incrementally from 0% to 150% of the design load of 300 metric tons in steps, holding at each load for a specified minimum holding time. Readings of actual and observed gauge pressures were recorded at each step date and time. The final load of 150% was held for an extended period of 1440 minutes to complete the test.
A static load test was performed on a service pile over multiple days to test loads up to 450 metric tons. The pile was loaded incrementally from 0% to 150% of the design load of 300 metric tons in steps, holding at each load for a specified minimum holding time. Readings of actual and observed gauge pressures were recorded at each step date and time. The final load of 150% was held for an extended period of 1440 minutes to complete the test.
A static load test was performed on a service pile over multiple days to test loads up to 450 metric tons. The pile was loaded incrementally from 0% to 150% of the design load of 300 metric tons in steps, holding at each load for a specified minimum holding time. Readings of actual and observed gauge pressures were recorded at each step date and time. The final load of 150% was held for an extended period of 1440 minutes to complete the test.
A static load test was performed on a service pile over multiple days to test loads up to 450 metric tons. The pile was loaded incrementally from 0% to 150% of the design load of 300 metric tons in steps, holding at each load for a specified minimum holding time. Readings of actual and observed gauge pressures were recorded at each step date and time. The final load of 150% was held for an extended period of 1440 minutes to complete the test.