Project ID
Region CAD CONTRACT APPRECIATION DOCUMENT
Project :
Revision No : 000
Reviewed by RO Contracts :
SHAPOORJI PALLONJI
Address:
Project :
Revision No : 000
SHAPOORJI PALLONJI
Address:
0 Shapoorji Pallonji and Co. Pvt. Ltd.
Region
0
CAD CONTRACT APPRECIATION DOCUMENT
History of Revisions
Rev. No Revision Date Chapter / Clause no & text affected Reasons for revision
History of Revisions
First Issue
Page : ….. of …….
0 Shapoorji Pallonji and Co. Pvt. Ltd. Project ID
Region
0
CAD CONTRACT APPRECIATION DOCUMENT 0
INDEX
3 INSURANCE
5 NOTICE REQUIREMENTS
7 PAYMENT TERMS
9 VARIATIONS
10 PRICE ADJUSTMENT/ESCALATION
14 COMPENSATION / RECOVERIES
15 CONTRACTOR'S OBLIGATIONS
INDEX
Page No
Page : ….. of …….
0 Shapoorji Pallonji and Co. Pvt. Ltd. Project ID
Region
0
CAD CONTRACT APPRECIATION DOCUMENT 0
INDEX PAGE
1 Name of Contract:
Observations/Pertinent Point
3 Insurance
CAR Policy:
CPM Policy:
Workmen Compensation:
Professional Indemnity:
Any other
4 SECURITIES / GAURANTEES E
Advance BG
Performance BG
Retention BG/SD
Waterproofing guarantee
Any other
Observations/Pertinent Point
Interest on Advance?
o. Pvt. Ltd. Project ID
N DOCUMENT 0
ES / GAURANTEES ETC.
5 Notice Requirements
Ref. Clause No. Page No. Description of Clause Notice Time Period Notice To Observation
(Insert Brief of c
clause need
Notice Requirements
Observations/Pertinent Point
(Insert Brief of contract clause; entire
clause need not be reproduced)
Liquidated damages
Bonus
Certificate of Completion
Programme scheduling
Programme Re-scheduling
Certification Timelines
Payment timelines
Final bill
Cerification Payment
Cerification
Duties / Levy
Royalties
Labour Cess
Contractor's liability for taxes,
levy etc.
Deduction / withholding of
taxes, duties by Owner
detailed calculations of such
deductions
Concession on custom Duty
9 Variations
Deviation / Variation
10 Price Adjustment
Page
Ref. Clause No. Description of Clause Observations/Pertinent Point
No.
(Insert Brief of contract clause; entire clause need not be
reproduced)
Specifications
Adjustment Formulae
Constant, Weightings,
Source of lndices and Base
Year
Free Issue Materials (if any)
Wastage Limits for Material
Consumption
Termination
OCUMENT 0
INDEX PAGE
Observations/Pertinent Point
OCUMENT 0
INDEX PAGE
Redressal System
Observations/Pertinent Point
Ref. Clause No. Page No. Description of Clause EOT COST Prohibition / Restriction
Suspension of Work
Terrorist action affecting the Works
at Site or any component
General Strikes / Transport Strikes /
All India Shrikes wrt Cement, Steel,
Oil.
Failure to fulfill Owner’s obligations
Delayed Payment
Force Majeure
Delay on part of other contractor or
other parties engaged directly by
owner
any court order
any other event which according to
PIC is not due to the Contractor's
failure.
Default / breach of Contract
Liquidated Damages
Change in Law
Price Adjustment
Delay in Possession of Site with
Access thereto
Delay in Drawings issue / approval
14 COMPENSATION / RECOVERIES
Bonus
Liquidated or un-liquidated
damages
For Intermediate Milestones if
any
Pvt. Ltd. Project ID
OCUMENT 0
INDEX PAGE
TION / RECOVERIES
Observations/Pertinent Point
(Insert Brief of contract clause; entire clause need not be
reproduced)
0 Shapoorji Pallonji and Co. Pvt. Ltd. Project ID
Region
0
CAD 0
CONTRACT APPRECIATION DOCUMENT 0
INDEX PAGE
15 Contractor's Obligations
Page
Ref. Clause No. Description of Clause Observations/Pertinent Point
No.
(Insert Brief of contract clause; entire clause need not be
reproduced)
Design Scope
Design Liability
Contractor's Staff
Contractor's Representative
Contract Labour (Regulation &
Abolition) Act 1970
Minimum Wages Act 1970
Safety Provisions
Personnel
Temp. Site office for the
Engineer (For Works costing
above Rs. 5 millions only)
Contractor's Office near Works
Erection & removal of office on
completion of works
Use of Municipal Land
Professional Indemnity
General Responsibility
Suspension of Work
Extension of Time
Force Majeure
Performance Security
Approval / Comments on all
design & drawings
alteration / modification /
changes etc.
Liasoning with owner
Liasoning with concerned
Authorities
Project Completion Report
Detailed designs
Additional Investigations
Taxes / Duties
Royalties
Transfer of Property
Spares
Replacement of Spare During
DLP
Warrantee and liability
Indemnity Bond
Inland Transportation
Route permits
Storage Instructions
Other Contractors
Engineer's Decisions
Instructions
Contract Labour (Regulation &
Abolition)&ActOther
Building 1970 Construction
Worker Act 1996 (Regulation of
Employment & Conditions of
Service) and Cess Act 1996
Personnel
Erection & removal of office on
completion of works
Use of Municipal Land
Suspension of Works
Certficate of Completion
Transfer of Property
Prolonged effect of Force
Majeure
General
Obligation of Owner
Safety Provisions
Defaults of Owner
Termination (in the event of
payment defualt)
Termination (in the event of
Owner becoming bankrupt)
Amount paid to contractor at the
time of termination of contract
Performance of Contract
Relationship with
Corporator(s)
Inspection of Site &
Sufficiency of Tender
EMD
Process to be Confidential
Official Secrecy
Insurance Indemnity
Undertaking from nominated
manufacturer
Royalty
Governing Law
Language of Contract
Jurisdiction of courts
Salient features of some major labour laws applicable to establishment engaged in Building & Other Construction Wo
Labour
0
INDEX PAGE
Observations/Pertinent Point
0
INDEX PAGE
Observations/Pertinent Point
20 SCOPE OF WORKS
Scope of Works
0
INDEX PAGE
mination
servations/Pertinent Point
f contract clause; entire clause need
not be reproduced)
0 Shapoorji Pallonji and Co. Pvt. Ltd.
Region
0
CAD 0
CONTRACT APPRECIATION DOCUMENT
0
INDEX PAGE
Period
servations/Pertinent Point
f contract clause; entire clause need
not be reproduced)
0 Shapoorji Pallonji and Co. Pvt. Ltd.
Region
0
0 D&B
CONTRACT APPRECIATION DOCUMENT
Note: Prepare flow chart for the processes mentioned above. A pictorial representation of the steps to be taken (including ti
A pictorial representation of the steps to be taken (including timelines for decision etc)
4. …..
EXTENSION OF TIME
boxes to accommodate the provisions of the clauses of a specific contract
reate the flow charts in word as per convenience
0 Shapoorji Pallonji and Co. Pvt. Ltd.
Region
0
0 CONTRACT APPRECIATION DOCUMENT
Note: Prepare flow chart for the processes mentioned above. A pictorial representation of the steps to be taken (including ti
ECIATION DOCUMENT 0
INDEX PAGE
4. …..
OCUMENT 0
INDEX PAGE
Observations
(Insert Brief of contract clause; entire clause need not be
reproduced)