e is
frig ur at im 28612816 oh, atm 128412240 ght
oer va kn 128¢129.1 nes, wa kn 128442240 ecw
Structure
sie, | CONSTRUCTION OF THE HIGHWAY E- | _otjeram
763, PRELJINA-POZEGA SECTION ‘lass of Works:
ie] aay EF PIS] 7
ec] danyap2nz2 oan
Teanga | WeItng Wetec wok on ais
come eouyie | X’0pousonauuja - Paden a npoucnnsa fs cotpahgin mpace ite
Section Conia
tare
untae uso Untnanre | Coote atrateg | ay
149598200 se . 1
et a Yn Jeatege | mipocameqrentatns | Kina
I | | an !
Tan TeV]
uy econ ant myn owes omni ae
Chawenmae one nee ‘ty Toate Dae
sncven me
Tanabe
Executed: / Manenen
[Waterrocting layer over pavement surface / Xrapowsonaula wonosaahe nove:
1 pes/kom
ryayno (i
=
Wspeaa iporsonaie rope reapunne wanosoare
oncrmpeane. Paacen no 80 nos ce asaneycxnany ca
esx yonoanna v nopuTeenna 3a coy apc Nocnoaa maa
ro rexnonorun npovseonae,
Waterproofing ayer over pavemant sutace. Works speci in he
tom sal be paormad mt compliance wih sical spelicatons
spd standard ors ype of work andi accorcance with the
manufacturers ecto
ma | s.o240|
3.024,00|
100%
Engineer
Hada
Contactor
30 Mscohava