Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

EATON ES-A Technical Unit Testing

R2_QTCI214B_Bidman to S4 Sales
Order Create
Document Control Information

Document Information
Document Identification R2_QTCI214B_Bidman to S4 Sales Order Create

Document Name Technical Unit Testing

Project Name Eaton ES-A

Client Eaton Electricals


Document Author Jyotiprakash Das
Document Version 1.0
Document Status Initial Version
Date Released 12/22/2023

Document Edit History


Version Date Additions/Modifications Prepared/Revised by
1.0 12/22/2023 Initial Version Jyotiprakash Das

Document Review/Approval History


Date Name Organization/Title Comments

Distribution of Final Document


The following people are designated recipients of the final version of this document:

Name Organization/Title

STATUS SECURITY LEVEL DOCUMENT ID: REV. LANG. PAGE


Draft Internal DO0001 1 EN 2/6
EATON Powering Business Worldwide 2022. All rights reserved.

EATON POWERING BUSINESS WORLDWIDE


Name Organization/Title

STATUS SECURITY LEVEL DOCUMENT ID: REV. LANG. PAGE


Draft Internal DO0001 1 EN 3/6
EATON Powering Business Worldwide 2022. All rights reserved.

EATON POWERING BUSINESS WORLDWIDE


Table of Contents
1 General Attributes............................................................................................................................... 5
2 Technical Unit Test plan results........................................................................................................ 6

STATUS SECURITY LEVEL DOCUMENT ID: REV. LANG. PAGE


Draft Internal DO0001 1 EN 4/6
EATON Powering Business Worldwide 2022. All rights reserved.

EATON POWERING BUSINESS WORLDWIDE


1 General Attributes
Program Name(s) QTCI214B_Bidman to S4 Sales Order Create
Area Menu QTC
Transaction N/A
System/Client EAD-200

STATUS SECURITY LEVEL DOCUMENT ID: REV. LANG. PAGE


Draft Internal RTCI004 1 EN 5/6
EATON Powering Business Worldwide 2022. All rights reserved.

EATON POWERING BUSINESS WORLDWIDE


2 Technical Unit Test plan results

Step Test Type Scenario Title Steps Performed Expected Results Actual Results
#
1 Positive Trigger – The test data is Message should be
Commit Date triggered to SCI (CPI) successfully passed to
data (Standard S/4HANA.
Order)

STATUS SECURITY LEVEL DOCUMENT ID: REV. LANG. PAGE


Draft Internal RTCI004 1 EN 6/6
EATON Powering Business Worldwide 2022. All rights reserved.

EATON POWERING BUSINESS WORLDWIDE

You might also like