This Quality Control Plan (QCP) provides the procedures for controlling and measuring
the quality of all work performed during site activities at FWDA.
This QCP has been developed to ensure compliance with appropriate industry and
regulatory standards and contract requirements. It will be used to ensure activities related to
this project are conducted in a planned and controlled manner, that tasks conform to
contractual requirements, and that appropriate documentation is generated to support each
activity for which ECC is responsible. The procedures specified in this QCP will be
considered minimum acceptable standards for ECC and are designed to meet requirements
specified by the client or regulatory agencies. Procedures less stringent than those
specified will not be adopted without prior written approval from the client and the ECC
Quality Program Management Team.
This QCP must be reviewed and formally approved before field operations commence. It is
the personal responsibility of all personnel associated with this project to understand and
maintain the quality issues applicable to their work assignments.
Major features of this QCP include
Project Organization, Roles & Responsibilities
Personnel Selection and Training
• Quality Assurance/Quality Control
• Site Specific Quality Control Process
• Three Phase Control Process
• Meetings, Progress Reports and Record Keeping ·
• Field Office Support
• Home Office Support
The first two elements, Project Organization, Roles and Responsibilities and Personnel
Selection and Training have been addressed in section 2.4 Project Oganization. The
remaining elements are discussed below.
The purpose of the QA/QC process is to provide a system of independent checks and
balances to ensure that field activities meet the specifications of the SOW and RCRA permit
requirements. Quality control will be the responsibility of ECC and will consist of a series of
control procedures designed to achieve project specifications. Quality Assurance (QA) will be
exercised by USASE and FWDA POCs, who will provide an indepenqent evaluation of each
definable feature of work completed under this TO.
Definable features of work for this TO include the
following: Work Plan Development
Site Communications
Brush Clearing
CONTRACT NO. W912BV-04-D-2021 10-1 APRIL 2006
TASK ORDER NO. DY03 REVISION:O
CONTRACT NO. W912BV-04-D-2021 10-2 APRIL 2006
TASK ORDER NO. DY03 REVISION:O
Final Work
Plan Parcel 3 Fence
Installation Fort Wingate
Depot Activity
)> Chain- Link Fence Construction (West
Boundary)
o Materials specifications (fabric, braces and rails, concrete, posts, barbed
wire, tension wire) ·
o Construction Details
• Post-hole excavation (depth)
• Post Installation (interval and plumb)
• Grounding (at gate, corners and alignment changes)
• Installation of fabric, tension wire, barbed wire, braces & rails, installation
• Gate Installation
)> Barbed Wire Fence Construction (North Boundary)
o Materials specifications (barbed wire, concrete (optional}, posts, gate(s))
o Construction Details
• Post-hole excavation (if posts are not driven)
• Post Installation (interval and plumb)
• Installation of barbed wire
• Gate Installation
)> Warning Sign Installation
)> Fence Certification
)> Dismantling Existing Barbed Wire Fence along Western Boundary
)> Drum Removal
)> Reactivation of Portion of Building 1
)> Reporting
o Field Summary Report from Cultural Monitoring
o Final Report (including Cultural Monitoring results)
All tools, instruments, and equipment used on-site will be properly maintained and
calibrated (as necessary) IAW the manufacturer's specifications or standard industry
practices. This applies to communications equipment, vehicles/machinery, environmental
monitoring equipment, and personal protective equipment.
Equipment will be protected from dust and contamination and visually ·checked for damage
prior to use. Preventative maintenance will be performed on a regular basis. Critical spare
parts will be kept on site to minimize downtime.
ECC's equipment maintenance program consists of the following aspects:
• Preventive Maintenance: The assigned operator of each piece of equipment will
perform scheduled preventative maintenance to ensure the equipment is maintained
in a satisfactory operating condition. .Preventive maintenance consists of before,
during and after operational checks and documentation of these activities, either in
the operators log book or in the team leader's field log book.
• Routine Repair and Adjustment: Routine repair and adjustment is based on
the manufacturer's schedule for adjustment, calibration or replacement. All equipment
used· on site will be maintained and submitted for routine repair and adjustment
IAW the manufacturer's specifications.
• Emergency Repair: Emergency repair includes any unscheduled repair. This type of
repair will be conducted using manufacturer required replacement parts and procedures to
ensure the continued integrity of the equipment.
Specific equipment that will be maintained for this project includes communications
equipment. metal detection equipment and vehicles.
• Radios/Cellular Phones: Maintenance for communications equipment consists of
checks before, during and after daily operation use. Before-operation checks shall
include verification of a complete battery charge and a communications check to ensure
the unit is operating properly. During-operation · checks shall include periodic checks to
ensure battery charge remains adequate and a communications check once an hour for
the radios and once a day for the cellular phone. After-operation maintenance shall
include a communications check, cleaning, turning off and placing in battery charger.
• Metal detection equipment: At the beginning of each day, the Schonstedt GA-72 will be
checked for proper operation using metal targets such as nails or other small items that
will test its sensitivity. Periodically during the day, the instrument will be checked in the
field to ensure adequate battery power.
• Vehicles: Before-operation checks shall include an operator general inspection of the
entire unit to include fluid levels, safety equipment operation and tire condition. During
operation checks shall include frequent inspections of the dials and gauges and a tire
inspection at breaks. After-operation checks shall include topping off of any fluids, which
are low, a general cleaning and a recheck of all safety related equipment.
For all site work, bound log books with consecutively numbered pages will be used by
field personnel. The field log books will be used to record the_ daily activities of the field
team,
Log books and records will be inspected by the SM on a weekly basis. These inspections
will focus on the completeness, accuracy, and legibility of the entries and records. Results
of these inspections will be forwarded to the PM. Log books kept by the SM will be inspected
by either the PM or the UXO Team Leader.
The log books will be used to compile the final report and serve as documentation to
help resolve any problem area addressed after the completion of the project. All log books
will be maintained on file for a period of seven years after project completion. These logs
may be digital and saved on disk. ·
The SSH/QC Manager will conduct periodic QC meetings with the Project
Manager, and site personnel over the duration of the project. At a minimum, the following
will be covered at each meeting:
The Three Phase Control Process is a universal process whereby quality .control is
achieved through stages ranging from ·preventative methods to· corrective measures and
follow-up inspections.· Nonconformance management is the mechanism for correcting
deficiencies identified under the Three Phase Control Process.
10.3.1 Three Phase Control Process
The SM/SSHM/QC Manager will be responsible for verifying compliance with ECC's QCP
through implementation of the three phases of control to ensure that all project activities
comply with the SOW and approved Work Plan. The three phases comprise a "Preparatory
Phase Inspection", an "Initial Phase Inspection" and a "Follow-up Phase Inspection".
Because the first two phases are preventive in purpose, work will not be performed at a
site until a successful preparatory and initial phase inspections have been completed.
This phase will be performed prior to beginning each definable feature of work. The purpose
of this inspection will be to review applicable specifications and verify that the necessary
resources, conditions, and controls are in place and compliant before work activities start.
The SSH/QC Manager will meet with the staff and subcontractor personnel to
communicate expectations and verify that the requisite equipment, material and supplies are
available and ready for use.. ·
Work plans and operating procedures will be reviewed by the SSH/QC Manager to ensure
they describe pre-qualifying requirements or conditions, equipment and mater.ials, appropriate
sequence, methodology, and QA provisions. The SSH/QC Manager will verify that:
This phase of inspection will be performed during the initial stages of work. Its purpose is to:
• Check the preliminary work for compliance with procedures and
contract specifications.
• Verify inspection and testing.
• Establish the acceptable level of workmanship.
• Check safety compliance..
• Check for omissions and resolve differences of interpretation.
The SSH/QC Manager will ensure that discrepancies between site practices and
approved specifications are identified and resolved. The initial phase inspection results
will be documented.
Discrepancies between site practices and the approved plans/procedures will be resolved
and the results documented in the Initial Inspection Checklist and summarized in the
Daily QC
.
This phase is performed after any corrective.action or during any definable feature of
wo_rk. The purpose of this inspection is to ensure a level of continuous compliance
and workmanship. The SSH/QC Manager will monitor practices and operations and verify
continued compliance with the contract specifications and approved project plans. A Stop
Work Order will be issued if required to correct a nonconforming practice. Discrepancies
between site practices and the approved plans/procedures will be resolved and corrective
actions implemented for nonconforming conditions or practices. Follow-up phase inspection
CONTRACT NO. W912BV-04-D-2021 10-1 APRIL 2006
TASK ORDER NO.DY03 REVISION:0
results will be documented in the Follow-up Inspection Checklist and summarized in the
Daily QC Report.
10.3.2.2 Notification
USACE will be informed of nonconforming items/conditions and the progress towards
their resolution. This will be accomplished through the progress reporting requirements
and or through attendance at coordination meetings. Notification will be made
immediately for any critical items that can not be adequately addressed at the field
level. For example, reseating a few fence posts would not require immediate notification
whereas out of spec construction for large segments of fencing would.
ECC will participate in any periodic or special called meetings at the discursion of the
Government. In addition ECC will be prepared to participate in one BRAC cleanup meeting
conducted by the government at Gallup, NM during the completion of this TO. Participants
of the meeting will include, at a minimum, the PM. If conditions warrant, the SM and UXO
Team Leader will attend. Within seven calendar days of a meeting, ECC will prepare and
submit a summary report of the meeting discussions. All meeting notes will be archived with
the project files.
In addition to meeting records. ECC will prepare and maintain project files of all key
communications throughout the project. This will include any telephone conferences,
discussions, verbal directions, telephone conversations, site visits, facsimile
transmissions, letters, or any other forms of communications participated in by ECC on
matters pertinent to the project in which decisions are made. The records will identify all
personnel involved in the
.communications, the dates and times of the communications, subjects of the
communications, and conclusions, directions received, or actions taken as a result of the
communications. Records of all communications will be available for the Government upon
request.
During the field portion of this TO, the SM will prepare monthly Project Status Reports for
submittal to CESWF. The reports will provide a summary description of:
• Work items performed, problem identification (current and anticipated), problem
resolutions and/or corrective actions taken.
Significant aspects of UXO avoidance or Cultural Resource Monitoring
ECC will provide program/project management and related services for the duration of this
Task Order from the Houston, Texas and Burlingame, California offices. Home office support
will include budget tracking, contracting, record backup and filing, project management
resources.