Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Factory Sonargaon Printing and Packaging Industries Ltd.

Procedure No HSE&S-OHSF-
1
Locatio Date of Origin 01-01-2023
MIEZ, Tripordi, Sonargaon,Narayanganj
n
Type Checklist Rev.No 00
Title Chain Pulley Block Inspection Check list Page No 01

Chain Pulley Block Inspection Check list


Frequency of Checking: Monthly
Date of Inspection: Name of the Month:

Location: Date:
ID Inspect Max. Inspect chain Spring Lower hook Upper hook Hook Attachmen Load Hand Fittings REMOVE
both load load for gouges, Loade and throat and throat Swivel t of the Chain Chain RETURN from
and lift indicato nicks, arc d opening opening Chain to to Service Service
chain for r burns, Hook measuremen measuremen Hoist
wear using Marked twisted, t t
a gauge. bent and worn
or damaged
links.

Signature of Maintenance Engineer Date:


Factory Sonargaon Printing and Packaging Industries Ltd. Procedure No HSE&S-OHSF-
1
Locatio Date of Origin 01-01-2023
MIEZ, Tripordi, Sonargaon,Narayanganj
n
Type Checklist Rev.No 00
Title Chain Pulley Block Inspection Check list Page No 01

(Mechanical):

Signature of HSE&S Supervisor ( HSE&S): Date:

You might also like