NAM MO 2 HYDROPOWER PROJECT

NEAR PLAN QC INSPECTION ON 05-03-2024

Phase type(**)
No. Descriptions Request No Location Expecting time Action by(*) Remark
I W H
Witnessing compressive stretgh of CVC Trial Mix in Laboratory @7days
mix code:
C20-19-(14-18)-103 05/03/2024
1 NM2-SCI-GP-0-CON-IR-0244 Laboratory RL F
C20-37.5-(12-16)-104 7:30
C25-19-(14-18)-105
C25-37.5-(12-16)-106

witnessing taking and testing sample of addmixture at CVC1 batching 05/03/2024


2 NM2-SCI-GP-0-CON-IR-0245 Laboratory RL F
plant. Lot No: 080124-2252 8:00

Blasting 05/03/2024
3 NM2-SCI-AT-0-BLA-NB-0371 Auxiliary tunnel AP I
Km0+488 to Km0+490 01:00

Geological checking after blasting 05/03/2024


4 NM2-SCI-AT-0-GEO-IR-0372 Auxiliary tunnel GEO I
Km0+488 to Km0+490 05:00

Blasting 05/03/2024
5 NM2-SCI-AT-0-BLA-NB-0373 Auxiliary tunnel AP I
Km0+490 to Km0+492 10:00

Geological checking after blasting 05/03/2024


6 NM2-SCI-AT-0-GEO-IR-0374 Auxiliary tunnel GEO I
Km0+490 to Km0+492 15:00

Inspection before pouring concrete of Main Dam Right bank grout cap 05/03/2024
7 NM2-SCI-DA-3-CON-IR-0017 Main Dam AP F Continue
concrete- Block BR-06 7:30

Wire mesh, PVC pipes installation and shotcrete spraying for slope of 05/03/2024
8 NM2-SCI-SP-5-CON-IR-0090 Scour hole AP F Continue
Scour hole at Right bank Type 2-EL. 1262-1271 7:30

Excavation from Sta: 0+020,5 to 0+022 Headrace tunnel 05/03/2024


9 NM2-SCI-HT-4-EXC-IR-0219 AP I
Section 1 Section 1 08:00

Geological checking after excavation


Headrace tunnel 05/03/2024
10 Sta: 0+020,5 to 0+022 NM2-SCI-HT-4-GEO-IR-0220 GEO F
Section 1 10:00
Section 1

Spilling bolts, Steel ribs installation


Headrace tunnel 05/03/2024
11 Sta: 0+020,5 to 0+022 NM2-SCI-HT-4-INS-IR-0221 AP F
Section 1 15:00
Section 1

Legend:
(*) RL-Laboratory Responsible, SM-Site Manager ,SQM- Site Quality Manager, QCE-Field QC Engineer,
RT-Surveyor, AP-Production Supervisor, GEO-Geologist Engineer
(**) I-Information, W- witness, H-Hold point(need to approval before start)

Page 1 of 1
MR-NM2- 01-01
REQUEST FOR INSPECTION
Req. No: NM2-SCI-DA-3-CON-IR-0017
m

To: NM2 Employer’s Engineer (LJ Hydro Consultancy) Date: 04/03/2024


□ Civil □Geologist □ H&M □ E&M □ HSE □ QC □ Survey

□ River Diversion □ Power Intake □ Access Road


□ Diversion Tunnel □ Intake Slope □ Temporary Access Road
□ Upstream Cofferdam □ Intake Foundation □ Operation Road
□ Downstream Cofferdam □ Headrace Channel □ Operator Camps
□ Main Dam □ Power Tunnel □ Camp at Powerhouse
□ Dam Body □ Headrace Tunnel □ Camp at Headwork
□ Left Dam Abutment □ Vertical Shaft
□ Temporary Facilities
□ Right Dam Abutment □ Penstock
□ Crushing Plant at.........
□ Auxiliary Dam □ Powerhouse platform
□ Batching Plant at.........
□ Left Dam Abutment □ Powerhouse Platform
□ Other...........................
□ Right Dam Abutment □ Powerhouse Building
□ Laboratory
□ Spillway □ Powerhouse Slope
□ Quarry works
□ Spillway □ Tailrace Channel
□ Chute □ Switchyard □ H&M at the ………………....
□ Plunge Pool / Stilling Basin □ Auxiliary Tunnel □ E&M at the ………………....
□ Spillway Slope □ Adit 1 □ Adit 2 □ Other: ……………………….
□ Adit □ Other…..

The NM2_EPC Contractor is hereby informing/requesting inspection □ I □ W □ H as follows:


Purpose of
Location (Elevation, Station) Item for Inspection Inspection1
Proposed Date and Time Remarks

05/03/2024
Inspection before pouring concrete of Main Dam 7:30
F
Right bank grout cap concrete- Block BR-06

Location: Main Dam Right bank

1) Inspection purpose:
A-Punch List D-Re-evaluation of NCR G-Material’s manufacturing at site
B-QC completion inspection E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction detail F-General inspection during work I-Others…..

Requested by SCI AP/QCE/QCM: Received by EE:


Name: Nguyen Van, Kien Name:

Employer / Engineer QC Remarks

By Employer/ Engineers QC:

Name:________________________________Signature:________________________Date:______________
MR-NM2- 01-01
NOTICE OF BLASTING
Req. No: NM2-SCI-AT-0-BLA-NB-0371
m

To: NM2 Employer’s Engineer (LJ Hydro Consultancy) Date:04/02/2024


□ Civil □ Geologist □ H&M □ E&M □ HSE □ QC □ Survey

□ River Diversion □ Power Intake □ Access Road


□ Diversion Tunnel □ Intake Slope □ Temporary Access Road
□ Upstream Cofferdam □ Intake Foundation □ Operation Road
□ Downstream Cofferdam □ Headrace Channel □ Operator Camps
□ Main Dam □ Power Tunnel □ Camp at Powerhouse
□ Dam Body □ Headrace Tunnel □ Camp at Headwork
□ Left Dam Abutment □ Vertical Shaft
□ Temporary Facilities
□ Right Dam Abutment □ Penstock
□ Crushing Plant at.........
□ Auxiliary Dam □ Powerhouse platform
□ Batching Plant at.........
□ Left Dam Abutment □ Powerhouse Platform
□ Other...........................
□ Right Dam Abutment □ Powerhouse Building
□ Laboratory
□ Spillway □ Powerhouse Slope
□ Quarry works
□ Spillway □ Tailrace Channel
□ Chute □ Switchyard □ H&M at the ………………....
□ Plunge Pool / Stilling Basin □ Auxiliary Tunnel □ E&M at the ………………....
□ Spillway Slope □ Adit 1 □ Adit 2 □ Other: ……………………….
□ Adit □ Other…..

The NM2_EPC Contractor is hereby informing/requesting inspection □ I □ W □ H as follows:


Purpose of
Location (Elevation, Station) Item for Inspection Inspection1
Proposed Date and Time Remarks

05/03/2024
Blasting, Km0+488 to Km+490 F 01:00

Location: Auxiliary tunnel

1) Inspection purpose:
A-Punch List B - Blasting C - Others

Requested by SCI AP/QCE/QCM: Received by EE as per Near Plan:


Name: Xayphone

Employer / Engineer QC Remarks

By SCI Tunnel Construction Manager


VŨ TẤT THẮNG
Name:________________________________Signature:________________________Date:______________
MR-NM2- 01-01
NOTICE OF BLASTING
Req. No: NM2-SCI-AT-0-BLA-NB-0373
m

To: NM2 Employer’s Engineer (LJ Hydro Consultancy) Date:04/02/2024


□ Civil □ Geologist □ H&M □ E&M □ HSE □ QC □ Survey

□ River Diversion □ Power Intake □ Access Road


□ Diversion Tunnel □ Intake Slope □ Temporary Access Road
□ Upstream Cofferdam □ Intake Foundation □ Operation Road
□ Downstream Cofferdam □ Headrace Channel □ Operator Camps
□ Main Dam □ Power Tunnel □ Camp at Powerhouse
□ Dam Body □ Headrace Tunnel □ Camp at Headwork
□ Left Dam Abutment □ Vertical Shaft
□ Temporary Facilities
□ Right Dam Abutment □ Penstock
□ Crushing Plant at.........
□ Auxiliary Dam □ Powerhouse platform
□ Batching Plant at.........
□ Left Dam Abutment □ Powerhouse Platform
□ Other...........................
□ Right Dam Abutment □ Powerhouse Building
□ Laboratory
□ Spillway □ Powerhouse Slope
□ Quarry works
□ Spillway □ Tailrace Channel
□ Chute □ Switchyard □ H&M at the ………………....
□ Plunge Pool / Stilling Basin □ Auxiliary Tunnel □ E&M at the ………………....
□ Spillway Slope □ Adit 1 □ Adit 2 □ Other: ……………………….
□ Adit □ Other…..

The NM2_EPC Contractor is hereby informing/requesting inspection □ I □ W □ H as follows:


Purpose of
Location (Elevation, Station) Item for Inspection Inspection1
Proposed Date and Time Remarks

05/03/2024
Blasting, Km0+490 to Km+492 F 10:00

Location: Auxiliary tunnel

1) Inspection purpose:
A-Punch List B - Blasting C - Others

Requested by SCI AP/QCE/QCM: Received by EE as per Near Plan:


Name: Xayphone

Employer / Engineer QC Remarks

By SCI Tunnel Construction Manager


VŨ TẤT THẮNG
Name:________________________________Signature:________________________Date:______________
MR-NM2- 01-01
REQUEST FOR INSPECTION
Req. No: NM2-SCI-AT-0-GEO-IR-0372
m

To: NM2 Employer’s Engineer (LJ Hydro Consultancy) Date: 04/02/2024


□ Civil □ Geologist □ H&M □ E&M □ HSE □ QC □ Survey

□ River Diversion □ Power Intake □ Access Road


□ Diversion Tunnel □ Intake Slope □ Temporary Access Road
□ Upstream Cofferdam □ Intake Foundation □ Operation Road
□ Downstream Cofferdam □ Headrace Channel □ Operator Camps
□ Main Dam □ Power Tunnel □ Camp at Powerhouse
□ Dam Body □ Headrace Tunnel □ Camp at Headwork
□ Left Dam Abutment □ Vertical Shaft
□ Temporary Facilities
□ Right Dam Abutment □ Penstock
□ Crushing Plant at.........
□ Auxiliary Dam □ Powerhouse platform
□ Batching Plant at.........
□ Left Dam Abutment □ Powerhouse Platform
□ Other...........................
□ Right Dam Abutment □ Powerhouse Building
□ Laboratory
□ Spillway □ Powerhouse Slope
□ Quarry works
□ Spillway □ Tailrace Channel
□ Chute □ Switchyard □ H&M at the ………………....
□ Plunge Pool / Stilling Basin □ Auxiliary Tunnel □ E&M at the ………………....
□ Spillway Slope □ Adit 1 □ Adit 2 □ Other: ……………………….
□ Adit □ Other…..

The NM2_EPC Contractor is hereby informing/requesting inspection □ I □ W □ H as follows:


Purpose of
Location (Elevation, Station) Item for Inspection Inspection1 Proposed Date and Time Remarks

Geological checking after blasting 05/03/2024


F
Km0+488 to Km+490 05:00

Location: Auxiliary tunnel

1) Inspection purpose:
A-Punch List D-Re-evaluation of NCR G-Material’s manufacturing at site
B-QC completion inspection E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction detail F-General inspection during work I-Others…..
Requested by SCI AP/QCE/QCM: Received by EE:
Name: Xayphone Name:

Employer / Engineer QC Remarks

By Employer/ Engineers QC:

Dontri LOENGNISAI
Name:________________________________Signature:________________________Date:______________
MR-NM2- 01-01
REQUEST FOR INSPECTION
Req. No: NM2-SCI-AT-0-GEO-IR-0374
m

To: NM2 Employer’s Engineer (LJ Hydro Consultancy) Date: 04/02/2024


□ Civil □ Geologist □ H&M □ E&M □ HSE □ QC □ Survey

□ River Diversion □ Power Intake □ Access Road


□ Diversion Tunnel □ Intake Slope □ Temporary Access Road
□ Upstream Cofferdam □ Intake Foundation □ Operation Road
□ Downstream Cofferdam □ Headrace Channel □ Operator Camps
□ Main Dam □ Power Tunnel □ Camp at Powerhouse
□ Dam Body □ Headrace Tunnel □ Camp at Headwork
□ Left Dam Abutment □ Vertical Shaft
□ Temporary Facilities
□ Right Dam Abutment □ Penstock
□ Crushing Plant at.........
□ Auxiliary Dam □ Powerhouse platform
□ Batching Plant at.........
□ Left Dam Abutment □ Powerhouse Platform
□ Other...........................
□ Right Dam Abutment □ Powerhouse Building
□ Laboratory
□ Spillway □ Powerhouse Slope
□ Quarry works
□ Spillway □ Tailrace Channel
□ Chute □ Switchyard □ H&M at the ………………....
□ Plunge Pool / Stilling Basin □ Auxiliary Tunnel □ E&M at the ………………....
□ Spillway Slope □ Adit 1 □ Adit 2 □ Other: ……………………….
□ Adit □ Other…..

The NM2_EPC Contractor is hereby informing/requesting inspection □ I □ W □ H as follows:


Purpose of
Location (Elevation, Station) Item for Inspection Inspection1 Proposed Date and Time Remarks

Geological checking after blasting 05/03/2024


F
Km0+490 to Km+492 15:00

Location: Auxiliary tunnel

1) Inspection purpose:
A-Punch List D-Re-evaluation of NCR G-Material’s manufacturing at site
B-QC completion inspection E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction detail F-General inspection during work I-Others…..
Requested by SCI AP/QCE/QCM: Received by EE:
Name: Xayphone Name:

Employer / Engineer QC Remarks

By Employer/ Engineers QC:

Dontri LOENGNISAI
Name:________________________________Signature:________________________Date:______________