Phase type(**)
No. Descriptions Request No Location Expecting time Action by(*) Remark
I W H
Witnessing compressive stretgh of CVC Trial Mix in Laboratory @7days
mix code:
C20-19-(14-18)-103 05/03/2024
1 NM2-SCI-GP-0-CON-IR-0244 Laboratory RL F
C20-37.5-(12-16)-104 7:30
C25-19-(14-18)-105
C25-37.5-(12-16)-106
Blasting 05/03/2024
3 NM2-SCI-AT-0-BLA-NB-0371 Auxiliary tunnel AP I
Km0+488 to Km0+490 01:00
Blasting 05/03/2024
5 NM2-SCI-AT-0-BLA-NB-0373 Auxiliary tunnel AP I
Km0+490 to Km0+492 10:00
Inspection before pouring concrete of Main Dam Right bank grout cap 05/03/2024
7 NM2-SCI-DA-3-CON-IR-0017 Main Dam AP F Continue
concrete- Block BR-06 7:30
Wire mesh, PVC pipes installation and shotcrete spraying for slope of 05/03/2024
8 NM2-SCI-SP-5-CON-IR-0090 Scour hole AP F Continue
Scour hole at Right bank Type 2-EL. 1262-1271 7:30
Legend:
(*) RL-Laboratory Responsible, SM-Site Manager ,SQM- Site Quality Manager, QCE-Field QC Engineer,
RT-Surveyor, AP-Production Supervisor, GEO-Geologist Engineer
(**) I-Information, W- witness, H-Hold point(need to approval before start)
Page 1 of 1
MR-NM2- 01-01
REQUEST FOR INSPECTION
Req. No: NM2-SCI-DA-3-CON-IR-0017
m
05/03/2024
Inspection before pouring concrete of Main Dam 7:30
F
Right bank grout cap concrete- Block BR-06
1) Inspection purpose:
A-Punch List D-Re-evaluation of NCR G-Material’s manufacturing at site
B-QC completion inspection E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction detail F-General inspection during work I-Others…..
Name:________________________________Signature:________________________Date:______________
MR-NM2- 01-01
NOTICE OF BLASTING
Req. No: NM2-SCI-AT-0-BLA-NB-0371
m
05/03/2024
Blasting, Km0+488 to Km+490 F 01:00
1) Inspection purpose:
A-Punch List B - Blasting C - Others
05/03/2024
Blasting, Km0+490 to Km+492 F 10:00
1) Inspection purpose:
A-Punch List B - Blasting C - Others
1) Inspection purpose:
A-Punch List D-Re-evaluation of NCR G-Material’s manufacturing at site
B-QC completion inspection E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction detail F-General inspection during work I-Others…..
Requested by SCI AP/QCE/QCM: Received by EE:
Name: Xayphone Name:
Dontri LOENGNISAI
Name:________________________________Signature:________________________Date:______________
MR-NM2- 01-01
REQUEST FOR INSPECTION
Req. No: NM2-SCI-AT-0-GEO-IR-0374
m
1) Inspection purpose:
A-Punch List D-Re-evaluation of NCR G-Material’s manufacturing at site
B-QC completion inspection E-Notification of NCR deficiency of correction H-Field testing and inspection
C-Definition of construction detail F-General inspection during work I-Others…..
Requested by SCI AP/QCE/QCM: Received by EE:
Name: Xayphone Name:
Dontri LOENGNISAI
Name:________________________________Signature:________________________Date:______________