MCC 97 MCC 106 Washing

Column Beam Slab Column Beam Slab Column Beam Slab


BRC-Mesh - - 883.91 - - 893.23 - 1,777.15
D10 - - 2,992.64 - - 2,984.38 - 5,977.02
D13 2,554.68 - 476.27 - 1,590.82 283.49 - 4,905.27
D16 669.60 - 1,924.03 - 112.24 149.26 - 2,855.13
D19 5,409.49 16,626.40 1,051.80 11,016.47 15,596.02 3,367.76 6,804.87 59,872.82
D22 - - - - 706.58 - 706.58
D25 3,784.23 5,974.19 - 3,784.23 6,116.76 1,625.33 21,284.74
D32 18,408.59 - - 21,181.24 - 12,959.56 52,549.39
30,826.60 22,600.60 6,444.73 35,981.94 24,122.43 6,784.90 21,389.75 - - 148,150.95
OK OK OK OK OK OK
OK
Reconciliation for Reinforcement Steel

Contractor : MITRA SARANA MEMBANGUN Previous Date : 24-Aug-23


Project : BM-1 This Period Date :
Location : BM-1

Description UoM R8 D10 D13 D16 D19 D22 D25 D32 Total UoM BRC Mesh
Rebar Receipt From RAPP : Kg - - m2 (m2)
- Previous Reconciliation (Date…) (A)
- For This Period Reconciliation (Date…) (B) Kg - m2 -
- Cumulative Receipt (C = A + B) Kg - - - - - - - - - -
- Full Length Rebar Return to RAPP (D) Kg - m2
- Shifted to Other Area (E) Kg - m2
- Total Receipt (F = C - D - E) Kg - - - - - - - - - m2 -

Consumption
Consumption Until Previous Reconciliation (Date…)
- Consumption As per DWG (G) Kg - - m2
- Consumption As per RFA (H) Kg - m2
- Total Consumption (I = G + H) Kg - - m2 -
Consumption for this Period (Date…)
- Consumption As per DWG (J) Kg - 18,661.91 18,661.91 m2 745.92
- Consumption As per RFA (K) Kg m2
- Total Consumption (L = J + K) Kg - - 18,661.91 - - - - - 18,661.91 m2 745.92
Cumulative Consumption (M = I + L) Kg - - 18,661.91 - - - - - 18,661.91 m2 745.92

Stock
- Full Length Stock Available at Site (N) Kg - - m2
- Scrap Available at Site (O) Kg - m2
- Total Stock (P = N + O) Kg - - - - - - - - - m2

- Scrap Return to RAPP (Q) Kg - m2

Theoretical Stock Diff


F-M-P-Q Kg - - - - - - - - - m2

97360
Contractor : D10 9736 10 PT. RAPI :
D13 34,076.00 35
D19 9736 10.00
D22 9736 10
D25 26,287.20 20
(Septria D H) D32 7,788.80 8 (Iwan Setiawan)
Date : ………………. Date : ……………….
Consumption Up to
No. Description Received Remarks
26 July 2023
1 D32 675 694 Using stock BM Precast
2 D25 645 461 Using stock BM Precast
3 D22 0 20 Using stock BM Precast
4 D19 0 2248 Using stock BM Precast
5 D16 0 151 Using stock BM Precast
6 D13 3500 393 BM Precast using Stock Peach
7 D10 270 803 Using stock BM Precast