Professional Documents
Culture Documents
Kopie Souboru W&R - Soviet Republic Cheat Sheet
Kopie Souboru W&R - Soviet Republic Cheat Sheet
Some variables change in-game over time as it's developed, information might not always be accurate
corners for comments/explanations! Blue cells are editable!
Daily production for extractable resources. You can adjust the Quality and Workers to fit your setup
Raw resource Quality % Workers Max Prod Actual ProdTotal ValueValue per ton
Coal Ore 53 100 4.2 222.6 1,749.64 7.86
Iron Ore 25 50 4 50 389.00 7.78
Oil 85 - 7 5.95 243.95 41
Quarried Stone 100 33 3.5 115.5 579.81 5.02
Raw Bauxite 100 150 0.5 75 2,643.00 35.24
Uranium Ore 100 50 0.75 37.5 1,038.00 27.68
Wood 100 55 6.3 346.5 2,927.93 8.45
public Cheat Sheet
might not always be accurate. Watch for yellow/black triangles in cell
ns! Blue cells are editable! Last update:
Daily Production statistics for 70% efficiency Daily revenue per worker
Number of Productio worker all worker
Planned Production Max Workers
Industries n in Tons resources without
Nuclear Fuel 0
Alcohol 0
Fabric 0
Food 1 14.00 119 11.39 17.80
Fabric 1 3.50 70 11.42 23.17
Clothes 2 1.68 112 10.00 25.37
Alcohol 1 4.20 70 7.91
Note that 100% efficiency will almost never be achieved, a more realistic value is around 80-90% with good tra
Note that all building require 3 times the max workers as the day is split into 3 shifts by gam
ws:
Useful Info:
All tooltips for buildings display the electric consumption in MWh while the meters inside buildings is i
For example if a building uses max 3 MWh, it's actual consumption on the power grid will be max 0.0
A power transformer can only deliver 6 x 2.35MW resulting in 14.1MW
Power does drop over large distances, especially on medium voltage with lots of switches.
It's not advised to have one large power grid across the republic, separate it into smaller ones.
It's a good idea to have a dedicated connection for selling power to avoid blackouts in the republic.
Wh is a measurement of absolute power consumed over time.
W is a measurement of actual power used by something
ce high voltage wire supports 18MW
rground high voltage wire supports 12MW
Vehicle Production Line cost statistics v0.3 (list not Choose type
complete yet)
Licence Mechanic
Name Workday Steel Plastics Fabric
Cost al Comp
Capitalists broke something
Choose type
Ship Production Line cost statistics v0.3
Passenger Ship
Licence Mechanic
Name Workday Steel Plastics Fabric
Cost al Comp
Capitalists broke som 1,307,443 18,129 367 7.2 1.5 51
[$] Express-9 1,983,002 26,709 552 10 2 92
[₽] Dunay-class motor 307,220 15,622 317 6.2 1 44
[₽] Meteor 342 135,991 6,827 139 2.7 0.47 21
[₽] Moskvich motor shi 87,101 4,513 90 1.8 0.51 11
Factory Productivity Choose your factory productivity, and the type of vehicle you wish
to produce. The profit statistic is useful if you plan to export that
80
Electrical Sell Price Materials Worker model of vehicle. Profit per Profit Time to
Total cost
Comp ₽ cost cost unit sold ₽ margin build
1.9 101,481 81,601 1,124 82,726 18,756 18.48% 14.1 Min
4.4 173,943 143,785 1,755 145,540 28,403 16.33% 21.9 Min
1.1 65,682 47,968 676 48,644 17,038 25.94% 8.4 Min
1.8 102,596 81,806 1,157 82,963 19,633 19.14% 14.5 Min
1.5 68,811 56,159 725 56,884 11,928 17.33% 9.1 Min
2.2 94,712 77,378 990 78,368 16,344 17.26% 12.4 Min
1.1 55,638 44,737 613 45,349 10,289 18.49% 7.7 Min
2.1 105,553 85,142 1,155 86,297 19,255 18.24% 14.4 Min
2.1 104,503 84,666 1,139 85,805 18,698 17.89% 14.2 Min
2 98,484 79,953 1,072 81,026 17,459 17.73% 13.4 Min
1.8 99,643 79,946 1,126 81,072 18,571 18.64% 14.1 Min
4.3 219,543 177,640 2,415 180,055 39,488 17.99% 30.2 Min
3.1 131,639 108,207 1,362 109,569 22,070 16.77% 17.0 Min
Factory Productivity Choose your factory productivity, and the type of vehicle you wish
to produce. The profit statistic is useful if you plan to export that
80
Electrical Sell Price Materials Worker model of vehicle. Profit per Profit Time to
Total cost
Comp ₽ cost cost unit sold ₽ margin build
0 #VALUE! #VALUE! 0.0 Min
Factory Productivity Choose your factory productivity, and the type of vehicle you wish
to produce. The profit statistic is useful if you plan to export that
100
Electrical Sell Price Materials Worker model of vehicle. Profit per Profit Time to
Total cost
Comp ₽ cost cost unit sold ₽ margin build
3.7 1,084,676 270,559 3,626 274,185 810,491 74.72% 36.3 Min
5.7 1,645,131 418,523 5,342 423,865 1,221,267 74.24% 53.4 Min
3.2 283,589 233,537 3,124 236,662 46,927 16.55% 31.2 Min
1.4 125,531 103,736 1,365 105,101 20,430 16.27% 13.7 Min
0.91 80,401 65,250 903 66,152 14,249 17.72% 9.0 Min
Resource import costs. Tick the
checkbox if you can supply that
resource yourself
Workers Cost per d 0.2
Steel 600 FALSE
Plastics 600 FALSE
Fabric 390 FALSE
Mechanical Comp 783 FALSE
Electrical Comp 1,491 FALSE
Workforce costs over 50% reported to the resources costs are highlighted in red.
You are paying more for workers than the actual building if using autobuild
Machinery can directly substitute workers with it's Speed/Level value.
An A2 tower crane replaces 65 workers for example.
extensive testing)
dium fields.
from fields is done exclusively by
ad/rail cargo station connected to
ng will not occur.
Acres
GDP calculator
Population 4000
Cost of workday in rubles 7.00$
Cost of workday in USD 3.50 ₽
Exchange rate 2.00
Consumption (in USD)
Construction $100,000
Citizen facility -$4,000
Fuel $100,000
Total $196,000
Net export
To USSR 1,400,000 ₽
To USSR (in USD) $2,800,000
To NATO $0
Total (in USD) $2,800,000
Results
GDP (USD) $2,996,000
GDP per capita (USD) $749