TABLE OF CONTEXT:

TS TITLE SHEET
SP EXISTING SITE/ ROOF PLAN
LP LANDSCAPE PLAN
A1.0 PROPOSED FLOOR PLAN (1ST FLOOR)
A1.1 PROPOSED FLOOR PLAN (2ND FLOOR)
A1.2 PROPOSED FLOOR PLAN (3RD FLOOR)
A2.0 PROPOSED ELEVATIONS (GARAGES 1-4/ UNITS 1-4)
A2.1 PROPOSED ELEVATIONS (GARAGES 1-4/ UNITS 1-4)
A2.2 PROPOSED ELEVATIONS (STORAGE & GARAGE #5)
A3.0 PROPOSED COLOR ELEVATIONS
A3.1 PROPOSED COLOR ELEVATIONS CONT.
A3.2 PROPOSED COLOR ELEVATIONS CONT.

ATTACHMENT A
BEST MANAGEMENT PRACTICES FOR CONSTRUCTION ACTIVITIES
Storm Water Pollution Control Requirements for Construction Activities
Minimum Water Quality Protection Requirements for All Development Construction
Projects/Certification Statement

The following is intended as minimum notes or as an attachment for building and grading plans
and represent the minimum standards of good housekeeping that must be implemented on all
construction sites regardless of size. (Applies to all permits)
• Eroded sediments and other pollutants must be retained on site and may not be transported
from the site via sheetflow, swales, area drains, natural drainage courses or wind.
• Stockpiles of earth and other construction related materials must be protected from being
transported from the site by the forces of wind or water.
• Fuels, oils, solvents and other toxic materials must be stored in accordance with their listing
and are not to contaminate the soil and surface waters. All approved storage containers are to be
protected from the weather. Spills must be cleaned up immediately and disposed of in a proper
manner. Spills may not be washed into the drainage system.
• Non-stormwater runoff from equipment and vehicle washing and any other activity shall be
contained at the project site.
• Excess or waste concrete may not be washed into the public way or any other drainage system.
Provisions shall be made to retain concrete wastes on site until they can be disposed of as solid
waste.
• Trash and construction related solid wastes must be deposited into a covered receptacle to
prevent contamination of rainwater and dispersal by wind.
• Sediments and other materials may not be tracked from the site by vehicle traffic. The
construction entrance roadways must be stabilized so as to inhibit sediments from being
deposited into the public way. Accidental depositions must be swept up immediately and may
not be washed down by rain or other means.
• Any slopes with disturbed soils or denuded of vegetation must be stabilized so as to inhibit
erosion by wind and water.
• Other: _____________________________________________________________________
As the project owner or authorized agent of the owner, I have read and understand the
requirements listed above, necessary to control storm water pollution from sediments, erosion,
and construction materials, and I certify that I will comply with these requirements.

Print Name ______________________________


(Owner or authorized agent of the owner)

Signature _______________________________Date _______________________________


(Owner or authorized agent of the owner)

NOTE:
PRIOR TO COMMENCEMENT OF WORK, IT'S OWNER'S/ CONTRACTOR
RESPONSIBILITY TO VERIFY ALL PROPERTY LINES. A PROFESSIONAL SURVEYOR
IS RECOMMENDED IF OWNER/ CONTRACTOR CAN NOT DETERMINE SUCH
PROPERTY LINE. DESIGNER/ ENGINEER SHOULD BE CONTACTED AND NOTIFY OF
ANY DISCREPANCIES PRIOR TO BEGINNING OF WORK.

CODE ANALYSIS:
APPLICANT/ DEVELOPER SHALL COMPLY WITH APPLICABLE PROVISIONS OF:
2022 CALIFORNIA RESIDENTIAL CODE
2022 CALIFORNIA BUILDING CODE
2022 CALIFORNIA PLUMBING CODE
2022 CALIFORNIA ELECTRICAL CODE
2022 CALIFORNIA MECHANICAL CODE
2022 CALIFORNIA FIRE CODE
2022 GREEN BUILDING CODE
2022 CALIFORNIA ENERGY CODE
W/ CITY OF LOS ALAMITOS AMENDMENTS

LOT DATA:
A.P.N.: 242-202-06
LOT SIZE: 7,500 SQ. FT.
ZONE: R-3
CONSTRUCTION: TYPE V-B
FIRE SPRINKLERED: NO
OCCUPANCY: R-3/ U

DIG ALERT (811) IS TO BE CONTACTED AND MUST COMPLY WITH EXCAVATION


SAFETY IN ACCORDANCE WITH GOVERNMENT CODE 4216 WILL BE FOLLOWED
PRIOR TO ANY EXCAVATION TAKING PLACE .
X____________
ACKNOWLEDGEMENT OF OWNER OR CONTRACTOR REPRESENTING OWNER

PROJECT SUMMARY:
PROPOSED UNIT 1 @ 2ND FLOOR: 854 SQ.FT.
PROPOSED UNIT 2 @ 2ND FLOOR: 963 SQ.FT.
PROPOSED UNIT 3 @ 3RD FLOOR: 800 SQ.FT.
PROPOSED UNIT 4 @ 3RD FLOOR: 818 SQ.FT.
TOTAL LIVING AREA 3,366 SQ.FT.

PROPOSED BALCONY UNIT 1 @ 2ND FLOOR: 60 SQ.FT.


PROPOSED BALCONY UNIT 2 @ 2ND FLOOR: 60 SQ.FT.
PROPOSED BALCONY UNIT 3 @ 3RD FLOOR: 60 SQ.FT.
PROPOSED BALCONY UNIT 4@ 3RD FLOOR: 60 SQ.FT.

PROPOSED GARAGE #1 @ 1ST FLOOR: 434 SQ.FT.


PROPOSED GARAGE #2 @ 1ST FLOOR: 425 SQ.FT.
PROPOSED GARAGE #3 @ 1ST FLOOR: 434 SQ.FT.
PROPOSED GARAGE #4 @ 1ST FLOOR: 425 SQ.FT.
PROPOSED GARAGE #5 @ 1ST FLOOR: 425 SQ.FT.
PROPOSED STORAGE ATTACHED TO GARAGE #5: 327 SQ.FT .

SCOPE OF WORK:
*PROPOSED 854 SQ.FT. UNIT 1 LOCATED@ 2ND FLOOR ABOVE {N) 434 SQ.FT.
GARAGE #1 & (N) 425 SQ.FT.GARAGE #2@ 1ST FLOOR.
-{N) 60 SQ.FT. BALCONY FOR UNIT 1

*PROPOSED 963 SQ.FT. UNIT 2 LOCATED@ 2ND FLOOR ABOVE (N) 434 SQ.FT.
GARAGE #3 & (N) 425 SQ.FT.GARAGE #4@ 1ST FLOOR .
-(N) 60 SQ.FT. BALCONY FOR UNIT 2

*PROPOSED 800 SQ.FT. UNIT 3 LOCATED@ 3RD FLOOR.


-(N) 60 SQ.FT BALCONY FOR UNIT 3

*PROPOSED 818 SQ.FT. UNIT 4 LOCATED@ 3RD FLOOR


-(N) 60 SQ.FT. BALCONY FOR UNIT 4
*PROPOSED 327 SQ.FT. STORAGE & (N) 425 SQ.FT. GARAGE #5