Professional Documents
Culture Documents
SafetyCulture Manage Teams and Inspection Data
SafetyCulture Manage Teams and Inspection Data
SafetyCulture Manage Teams and Inspection Data
Page 8 of 11 Score
Tug
Yes No
N/A N/I
Yes No
N/A N/I
Yes No
N/A N/I
1 of 7 3/9/2023, 9:55 AM
SafetyCulture: Manage Teams and Inspection Data https://app.eu.safetyculture.com/inspection/audit_1438e48535044929a...
Yes No
N/A N/I
Is the tow line of sufficient strength and length for the intended operations?
Yes No
N/A N/I
Does the company have a policy on renewing the tow line? (e.g. frequency/when worn
out)
Yes No
N/A N/I
2 of 7 3/9/2023, 9:55 AM
SafetyCulture: Manage Teams and Inspection Data https://app.eu.safetyculture.com/inspection/audit_1438e48535044929a...
DoesGeneral Survey
the company haveReport
a policy on shortening the length of the tow line as required?
Last edited by Dover Marine at 9 Mar 2023 9:50 am
Yes No
N/A N/I
Yes No
N/A N/I
If carried, is the spare tow line in good condition and duly certified?
Yes No
N/A N/I
Is the bollard pull of the tug sufficient for the displacement of the barge towed in
anticipated weather condition?
Yes No
N/A N/I
3 of 7 3/9/2023, 9:55 AM
SafetyCulture: Manage Teams and Inspection Data https://app.eu.safetyculture.com/inspection/audit_1438e48535044929a...
General Survey
Yes Report No
Last edited by Dover Marine at 9 Mar 2023 9:50 am
N/A N/I
For push tugs, is the Master aware of restrictions (if any) on barge size/deadweight?
Yes No
N/A N/I
Is the emergency release of the tow hook available locally and also at a remote point?
Yes No
N/A N/I
Is the emergency release of the tow hook available (locally and also at a remote point)
tested regularly?
Yes No
N/A N/I
Are the crew aware of the emergency quick release procedures and how it works
including any time delays in the release as per design?
4 of 7 3/9/2023, 9:55 AM
SafetyCulture: Manage Teams and Inspection Data https://app.eu.safetyculture.com/inspection/audit_1438e48535044929a...
General Survey
Yes Report No
Last edited by Dover Marine at 9 Mar 2023 9:50 am
N/A N/I
Yes No
N/A N/I
Are there procedures for checking cargo securing arrangements during voyage?
Yes No
N/A N/I
Are the tug's crew aware that they are responsible for the stowing/lashing of the cargo
as well as the stability/safety of the barge?
Yes No
N/A N/I
Is there any evidence of lashing plans, stowage plan verifications etc by the ship staff?
Yes No
5 of 7 3/9/2023, 9:55 AM
SafetyCulture: Manage Teams and Inspection Data https://app.eu.safetyculture.com/inspection/audit_1438e48535044929a...
General Survey
N/A Report N/I
Last edited by Dover Marine at 9 Mar 2023 9:50 am
Does the planned maintenance system on board include maintenance of the towing
equipment as well?
Yes No
N/A N/I
Are the tug's crew familiar with the deployment of the emergency towing arrangement
on the barge if applicable?
Yes No
N/A N/I
Does the tug maintain a towing log to monitor and log down details of the tow on an
hourly basis whilst towing?
Yes No
N/A N/I
6 of 7 3/9/2023, 9:55 AM
SafetyCulture: Manage Teams and Inspection Data https://app.eu.safetyculture.com/inspection/audit_1438e48535044929a...
7 of 7 3/9/2023, 9:55 AM