CDU-IV HIGHLIGHTS

A. FEED & PRODUCTS:


Date 21-Feb-2024
Crude Feed Rate (m3/hr.) 1220
Feed tank switched
Crude Tank & Comp. 79AXL+17AXL+4URAL
to 201G at 04:30hrs
Hot feed towards Cold feed towards
Units storage
LPG - 37
STAB. Nap. (SRN) 75 165
Swing Nap. (HN) 10 60
KERO 150 60
LGO (LD) 100 185
HGO (HD) 25 25
Products (m3/hr) RCO 490 --
HWOG (kg/hr) 770
VD 20 55
LVGO 110 0
HVGO 120 20
VR + SC 0 120
HW OIL -- 1
Stab off gas (kg/hr) 0 0

B. PROCESS PARAMETERS:
Parameter Shift Avg. Value
Preheat (0C) 279
Crude column top temp. (0C) 130
2
Crude column top Press. (Kg/cm ) 2.65
3
Stabilizer feed (m /hr) 245

Crude Heater COT (0C) 349 / 348

F101A 512oC at Pass-5 inlet


0
Skin Max Temp. ( C)
F101B 520oC at Pass-6 Inlet
Vac column top press. (mmHG) 13
Vac Heater COT (0C) 407
Skin Max Temp. (0C) 5570C at Pass-7 ENTRY

pg. 1
CDU-IV HIGHLIGHTS

C. QUALITY PARAMETERS:
Quality / Lab Results Result
0
LPG Weathering ( C) 1 oC
LPG Total Sulfur (ppm) --
HGO (95% Recovery) 395 oC,
VD (95% Recovery) 383 oC

D. MAJOR HIGHLIGHTS:
1. FT-2306 cable replacement done and pass taken in cascade
2. P123B NRV dropped and boiler makers fixied
3. Feed rate reduced to 1180m3/hr at 15hrs due to FO ullage issue , increased back to
1220m3/hr at 5:00am after OMS clearance.
4. Steam leaks arrested at P-120A O/H (steam out point dead end flange) and F101B soot
blower CV bypass flange
5. F-101B Pass-2 control FT, FT-2402 Pass FT behaving eratic
6. Vac heater tubes bowing status remains same.
Vac heater tubes bowing status:
Total Radiant tubes: 168 Nos.in both Cells; Bowed tubes: 27 Nos.
A. Cell-1 South: Tubes no# 4,5,6,7,8,9 are in bowed condition. 2nd , 3rd ,4th & 5th tubes
observed with severe bowing and occasionally touching each other.
B. Cell-1 North: Tubes no# 6,7,8 are in bowed condition. 6th tube observed with severe
bowing and moved closer to 5th tube.
C. Cell-2 South: Tubes no# 2,3,4,5,6,7,8,9 are in bowed condition. 3rd tube observed with
severe bowing and moved closer to 2nd tube.
D. Cell-2 North: Tubes no# 2,3, 4,5,6,7 tubes are in bowed condition.2 and 3rd tube
bowing from 17th January evening hours, 3rd & 4th tubes observed with severe bowing and
occasionally touching with other tube.

7. Stand-by Pumps’ not available:


a. P-124A/B (Slop cut pumps)
b. P-125B (VR pump)
c. P-120A (LVGO CR+IR+PDT pump)– NDE seal (plan 52) pot pressure > 2.5ksc
d. P-121C (HVGO CR pump) – discharge NRV drain plug seal welding
e. 506-PM-105B (Solvent circulation pump) –seal leak