Project Components

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

CORN AND RICE MILL PROJECTS

I.2 PROJECT COMPONENTS

Capacity
Facilities
No. of (ton/hour) Specification/Description
please enumerate; use separate sheet, if
Units or Area
necessary)
(sq./M)
1. Main Components 1 1000 kg/hr Corn Mill served with Cyclone Separators
Corn Mill 1 4000 kg/hr Corn Mill served with Cyclone Separators
Corn Mill 1 1000 kg/hr Hammer Mill
Hammer Mill

a. Drying (method)

Mechanical 1 1.6 Mechanical dryer

Solar n/a

b. Cleaning/Hulling n/a

c. Shaking/Separating n/a

d. Polishing 2 15 HORSE Polisher


POWER

e. Grinding 2 10 HORSE Grinder


POWER

f. All in one machine for n/a


cleaning/polishing/grinding

g. Weighing and Packaging 1 45 TONS TRUCK SCALE

h. Others, specify n/a

2. Storage Facility
a. Fuel Storage N/A

b. Product Storage inside the building

Project Name: ____________________________________________________


Page 1 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

c. Palay/corn Storage inisde the building

d. Others, specify n/a

3. Air pollution control Facility


a. Cyclone Dust Collector 2

b. Rice Hulls Storage Bins n/a

4. Power source/supply
a. Electric source Local Utility Service Provider

b. Genset n/a

5. Water source / supply Local Water District Provider

6. Waste water management Facility/ 1 Three Chambered Oil and Water Separator
septic tank

7. Solid waste management Facility 1 5 sq.m Material Recovery Fcaility

1 2 sq.m Compost Pit

8. Drainage System Septic Tank

9. Support Facilities
a. Workers quarters n/a

b. Admin building Located outside the developed area as shown in the site development plan

c. Motor pool facility n/a

d. Others, specify

Project Name: ____________________________________________________


Page 2 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

I.3 UTILITIES/REQUIREMENTS (Operation Phase):


Power/Energy and Water Requirements
Utilities Estimated Demand/ Source Breakdown Projected breakdown
Consumption (Total) from Source specified
Grid KWh
Power/Electricity

KWh

Generator Set KWh

Others, please specify: KWh

Local Water Utility Provider m3/day


Water Local Water Distric (Manolo Fortich Water
District)

m3/day
Well in: (specify location): m3/day

Spring in: (specify location): m3/day

River, Lake or other surface m3/day


water : (specify name &
location)

Others, please specify: m3/day

Power/Energy and Water Efficiency Measures (if any)

Utilities Proposed Estimated Savings Estimated Total Savings


Efficiency/Conservation for each Measure
Measures
Power/ Electricity KWh KWh

KWh

Project Name: ____________________________________________________


Page 3 of 4
Initial Environmental Examination (IEE) Checklist Report for Corn and Rice Mill Projects

Water Rainwater collection system m3/day m3/day


with total capacity of

Others, please specify: m3/day


Regular check up of water pipe lines to timely
detect leaks. Constantly remind workers to
conserve water, reuse if possible.
Regulate frequency of car washing and use of
rags and buckets of water instead of hose in
car washing.

I.4 MANPOWER & TIMETABLE OF CONSTRUCTION

Proposed Start of Construction

Proposed Start of Commissioning

Proposed Start of Commercial Operation

Phase Expertise/Skills Requirement per Expertise/Skill Total Requirement


per project phase
a. Construction eodetic Engineer, Civil engineer, Mechanical 1 each 1 each
Engineer, Electrical Engineer, Electronics
Engineer, Master Plumber,

Foreman 1 each 1 each


Electrician

Laborers 3 3
Plumber 1 1
Mason 2 2
Paintor 2 2

b. Operation Manager 1 1
Admin Staff 1 1
Laborer 4 4
Driver 1 1

I.5 INDICATIVE PROJECT COST (Initial Investment):


10000000
PhP __________ US $ ___________ _ (specify if with foreign investment)

Project Name: ____________________________________________________


Page 4 of 4