Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

STRUCTURAL DRAWINGS

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1 ISSUED DATE 07/03/2024
SINGAPORE 068809

Project Title: PURE SALMON LAND - BASED ATLANTIC SALMON FARM

Project Address: Kg Sabun, Mukim Serasa, Daerah Brunei - Muara, Negara Brunei Darussalam

Client: PURE SALMON

Design Consultant: ARTELIA SINGAPORE PTE. LTD.

CLIENT DESIGN CONSULTANT


NORTH

KEY PLAN

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

DRAWING LIST (BUILDING U)


NO SHEET NUMBER SHEET NAME

1 PSBR01_ART_U_DR_ST001_GE001 COVER
2 PSBR01_ART_U_DR_ST001_GE002 DRAWING LIST
3 PSBR01_ART_U_DR_ST100_LL001 LOADING PLAN AT LEVEL 0.00
4 PSBR01_ART_U_DR_ST100_FOU01 FOUNDATION PLAN
5 PSBR01_ART_U_DR_ST100_FRA01 GROUND FLOOR FRAMING PLAN
6 PSBR01_ART_U_DR_ST100_FRA02 ROOF FRAMING PLAN
7 PSBR01_ART_U_DR_ST100_FRA03 ROOF PURLIN PLAN
8 PSBR01_ART_U_DR_ST200_FRA01 FRAMING ELEVATION - 1
9 PSBR01_ART_U_DR_ST500_FRA02 FRAMING ELEVATION - 2
10 PSBR01_ART_U_DR_ST300_FRA01 FRAME SECTION-1
11 PSBR01_ART_U_DR_ST300_FRA02 FRAME SECTION-2
12 PSBR01_ART_U_DR_ST300_FRA03 FRAME SECTION-3
13 PSBR01_ART_U_DR_ST900_GE001 3D MODEL

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

DRAWING LIST

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 07/03/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST001_GE002 NTS

SHEET SIZE REV. NO.


DATE PRINTED 07/03/2024 2:58:37 pm
A1 00
NORTH

KEY PLAN

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
u.1 u.2 u.2' u.3 u.4 u.5 u.6 PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

35000

1800 3700 5400 9100 9100 5900

u.N

PARKING AREA
SSL=-0.150
8800

u.C
21200

6200

SSL=-0.150

PUMP ROOM
SSL=+0.100

SSL=+0.100

SSL=+0.100

SSL=+0.100
SSL=+0.000
I S S U E S
u.B

SSL=+0.100
6200

SSL=+1.345

SSL=+0.100

SSL=+0.100
SSL=+0.100

SSL=+0.100
No. Date Description Chk'd By
R E V I S I O N
SSL=+0.100
PROJECT :
u.A
PURE SALMON LAND-BASED
ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


LOADING PLAN AT LEVEL 0.00 6 Shenton Way – 39-02 OUE Downtown 1
1 Scale 1 : 100 SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

LEGENDS: DRAWING TITLE :

LOADING PLAN AT LEVEL 0.00


1000 kg/m2
Eurocode 1 - Tab.6.2

DRAWN BY CHECKED BY APPROVED BY DATE


500 kg/m2
Eurocode 1 - Tab.6.2 PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST100_LL001
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:38 pm
A1 00
NORTH

KEY PLAN

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


u.1 u.2 u.2' u.3 u.4 u.5 u.6 NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
42600
7600 35000

1800 3700 5400 9100 9100 5900

600 8500 600 8500 600 8500 600 8500 600 5000 600

u.N
600

RC WALL W-1 (600mm THK)

RC WALL W-2 (600mm THK)


8800

u.C

1
21200

20000

ST300_FRA01

POTABLE WATER TANK POTABLE WATER TANK MUNICIPAL WATER SERVICES MUNICIPAL WATER SERVICES FIRE RESERVE
(FILTERED) 1 (FILTERED) 2 TANK 1 TANK 2 TANK
6200

MF MF MF MF MF RC WALL W-1 (600mm THK)


700 700 700 700 700
-7800 -7800 -7800 -7800 -7800

u.B
I S S U E S

2
ST300_FRA01
6200

RC WALL W-1 (600mm THK)

No. Date Description Chk'd By


R E V I S I O N
600

PROJECT :
u.A
RC WALL W-1 (600mm THK)
PURE SALMON LAND-BASED
1 2 3 1 2 ATLANTIC SALMON FARM
ST300_FRA02 ST300_FRA02 ST300_FRA02 ST300_FRA03 ST300_FRA03

FOUNDATION PLAN
1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


LEGENDS: Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam
MF - FOUNDATION MARK
700 - MAT FOUNDATION THICKNESS (mm) DRAWING TITLE :
-7.800 - TOP OF MAT FOUNDATION LEVEL (m)
FOUNDATION PLAN
NOTE:
- SOIL SHALL BE MEET THE FOLLOWING PROPERTIES:
+ ALLOWABLE BEARING CAPACITY: 200 KPA
+ ALLOWABLE SETTLEMENT LIMIT: 50 MM
DRAWN BY CHECKED BY APPROVED BY DATE
- SOIL IMPROVEMENT SHALL BE DONE AS STATED
IN CONSTRUCTION DRAWINGS BY SUPPLIER PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5 EXPERTISE
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 - ALL RELEVANT CONTRACTORS SHALL ST100_FOU01
COORDINATE TOGETHER BEFORE PROCEEDING SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:42 pm
THE WORKS, ESPECIALLY PIPING SYSTEM. A1 00
NORTH

KEY PLAN

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES
u.1 u.2 u.2' u.3 u.4 u.5 u.6 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
42600

7600 35000
1800 3700 5400 9100 9100 5900

G3 G3 G3 G3 G3
u.N

S1 S1 S1 S1 S1

G2 G2 G2 G2 G2

PARKING AREA S1
8800

150

G3

G3

G3

G3

G3
SSL=-0.150
S1 S1 -0.150 S1 S1 S1
G3

G2 G2 G2 G2 G2

S1 S1 S1 S1 S1

G1 C1 G1 C1 G1 C1 G1 C1 G1 C1
u.C

C1
MANHOLE OPENING
1
21200

ST300_FRA01
G3

S1 G3
S2 S2 S2 S2 S2 S2

G1
G2 G2 G2 G2 G2 G2
6200

EQUIPMENT PADS S2
S2 150 MANHOLE OPENING

G3
SSL=-0.150 0.000
S2 S2 S2 S2 S2
S1
SSL=+0.100

SSL=+0.100

SSL=+0.100

SSL=+0.100
PUMP ROOM
G1 C1 G1 C1 SSL=+0.000 G1 C1 G1 C1 G1 C1
u.B
SSL=+0.000

G3

G3
I S S U E S

G3
S2 S2 S2 S2 S2 S2
2 S1
G3

ST300_FRA01

SSL=+0.100
EQUIPMENT PADS
G3

G2 G2 G2 G2 G2 G2 2450 300 G2

SSL=+0.100
SSL=+0.100
6200

SSL=+1.345
G1

SSL=+0.100

SSL=+0.100

1500
S1 S2 S2 S2 S2 S2 S2

SSL=+0.100

1450
G3 C1 G3 C1 G3 C1 G3 C1 G3 C1 G3 C1 No. Date Description Chk'd By
R E V I S I O N
u.A
PROJECT :
EQUIPMENT PADS WALL ENCASEMENT EQUIPMENT PADS
FOR DIESEL TANK
1 2 3 1 2 PURE SALMON LAND-BASED
ST300_FRA02 ST300_FRA02 ST300_FRA02 ST300_FRA03 ST300_FRA03 ATLANTIC SALMON FARM

GROUND FLOOR FRAMING PLAN


1 Scale 1 : 100 CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
STRUCTURAL DRAWINGS

LEGENDS:
PLOT NO. LOCATION
- SLAB ON GRADE MARK Kg Sabun, Mukim Serasa,
S1 Daerah Brunei - Muara,
150 - SLAB ON GRADE THICKNESS (mm) Negara Brunei Darussalam

0.000 - TOP OF SLAB ON GRADE LEVEL (m) DRAWING TITLE :


ALL RELEVANT CONTRACTORS SHALL COORDINATE
TOGETHER BEFORE PROCEEDING THE WORKS, ESPECIALLY GROUND FLOOR FRAMING PLAN
PIPING SYSTEM.

LEGENDS:
DRAWN BY CHECKED BY APPROVED BY DATE
COLUMNS & WALLS ABOVE
PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5
COLUMNS & WALLS BELOW JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST100_FRA01
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:42 pm
A1 00
NORTH

KEY PLAN

u.1 u.2 u.2' u.3 u.4 u.5 u.6 B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
1800 3700 5400 9100 9100 5900 K4

35000
K2 K3 J U

K8 N K1

L G1
K7

RG1 RG1 RG1 RG1 RG1


O
C1 C1 C1 C1 C1 C1
u.C

NOTES
1
ST300_FRA01 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE

6200
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL

RG1

RG1

RG1

RG1

RG1
RG1
BEFORE PROCEEDING THE WORK.

C1 RG1 C1 RG1 C1 RG1 C1 RG1 C1

12400
u.B

2
ST300_FRA01

RG1

RG1

RG1

RG1

RG1
6200

RG1
C1 RG1 C1 RG1 C1 RG1 C1 RG1 C1 RG1 C1

u.A

1 2 3 1 2
ST300_FRA02 ST300_FRA02 ST300_FRA02 ST300_FRA03 ST300_FRA03

FRAMING PLAN @EL. +4.00M


1 Scale 1 : 100

u.1 u.2 u.2' u.3 u.4 u.5 u.6

1800 3700 5400 9100 9100 5900 I S S U E S


35000

SC1 SB1 SC1 SB1 SC1 SB1 SC1 SB1 SC1 SB1 SC1
u.C

1
ST300_FRA01
No. Date Description Chk'd By
R E V I S I O N
6200

SB1

SB1

SB1

SB1

SB1
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
SB1

SC1 SB1 SB1 SC1 SB1 SC1 SB1 SC1 SB1 SC1
12400

u.B

2
ST300_FRA01
6200

SB1

SB1

SB1

SB1

SB1
CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SC1 SB1 SC1 SB1 SC1 SB1 SC1 SB1 SB1 SC1 SB1 SC1
u.A
SCHEMATIC DESIGN PHASE
BUILDING U
1 2 3 1 2
STRUCTURAL DRAWINGS
ST300_FRA02 ST300_FRA02 ST300_FRA02 ST300_FRA03 ST300_FRA03

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

STEEL COLUMN SCHEDULE DRAWING TITLE :

ROOF FRAMING PLAN NAME SECTION WEIGHT MATERIAL ROOF FRAMING PLAN
2 Scale 1 : 100
(kg/m)
SC1 HA 300x300x8x12 73.9 S355

STEEL BEAM SECTION SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE


NAME SECTION WEIGHT MATERIAL PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5 (kg/m)
JOB NO. DRAWING NO. SCALE
SCALE m SB1 HA 300x300x8x12 73.9 S355
PSBR01 ST100_FRA02 1:100
1: 100
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:43 pm
A1 00
NORTH

KEY PLAN

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

u.1 u.2 u.2' u.3 u.4 u.5 u.6

35000

1800 3700 5400 9100 9100 5900

Z220X2 SPACES @
600 OC
u.C

SAGROD SAGROD
6200
12400

u.B
6200

I S S U E S

u.A

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

ROOF PURLIN PLAN


1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

ROOF PURLIN PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


PURLIN SECTION SCHEDULE
PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5 NAME WEIGHT MATERIAL
SECTION JOB NO. DRAWING NO. SCALE
(kg/m)
SCALE m PSBR01 1:100
1: 100 Z 220x2 HA 220x75x2x2 6.3 S355 ST100_FRA03
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:43 pm
A1 00
NORTH

KEY PLAN

B2 CD2 G2

u.N u.C u.B u.A


P
K5 K6
RV
E1 F
A B1 C1 D1
K4

21200 K2 K3 J U
M

K8 K1
8800 6200 6200
N
L G1
K7

Z 220x2
O

+5.300
5%
TOP OF ROOF SC1

1300
SB1
SC1 SB1 NOTES
+4.000 SC1
u.+4.0 RG1 RG1 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE

5300
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL

4000
4150
BEFORE PROCEEDING THE WORK.

RC WALL W-1 (600mm THK)


-0.150 C1 +0.000 C1 +0.000 C1
+0.000 G3

150
u.0.0
-0.150
u.-0.15

7800
-7.800
u.-7.80

MF
700 LEAN CONCRETE
-7800

FRAMING ELEVATION @GRID u.1


1 Scale 1 : 100

u.A u.B u.C u.N


I S S U E S

21200

6200 6200 8800

+5.300 Z 220x2
TOP OF ROOF SC1
1300

SB1
SB1 SC1
+4.000 SC1
u.+4.0 RG1 RG1 No. Date Description Chk'd By
R E V I S I O N
5300

PROJECT :
4000
4150

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
C1 +0.000 C1 +0.000 C1 RC WALL
-0.150W-1 (600mm THK)
+0.000
150

u.0.0
-0.150
u.-0.15

CONSULTANT :
7800

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


-7.800 BUILDING U
u.-7.80 STRUCTURAL DRAWINGS

MF LEAN CONCRETE PLOT NO. LOCATION


700 Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
-7800 Negara Brunei Darussalam

DRAWING TITLE :

FRAMING ELEVATION @GRID u.6


2 Scale 1 : 100
FRAMING ELEVATION - 1

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST200_FRA01
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:47 pm
A1 00
NORTH

KEY PLAN

u.1 u.2 u.2' u.3 u.4 u.5 u.6

B2 CD2 G2

P
K5 K6
RV
35000 E1 F
A B1 C1 D1
K4

1800 3700 5400 9100 9100 5900 K2 K3 J U


M

K8 N K1

+5.300 L G1
K7

TOP OF ROOF

1300
O

+4.000 SB1 SB1 SB1 SB1 SB1


u.+4.0 RG1 RG1 RG1 RG1 RG1
NOTES

5300
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,

4000
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE

4150
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
WALL ENCASEMENT SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
FOR DIESEL TANK BEFORE PROCEEDING THE WORK.

-0.150 +0.000 +0.000 +0.000 +0.000 +0.000


+0.000 C1 C1 C1 G3 C1 C1 C1

150
u.0.0
-0.150
u.-0.15
7800

-7.800
u.-7.80

MF LEAN CONCRETE
700
-7800

FRAMING ELEVATION @GRID u.A


1 Scale 1 : 100

u.6 u.5 u.4 u.3 u.2' u.2 u.1

I S S U E S

35000

5900 9100 9100 5400 3700 1800

+5.300
TOP OF ROOF
SB1 SB1 SB1 SB1 SB1
1300

SC1 SC1 SC1 SC1 SC1 SC1


+4.000
u.+4.0 RG1 RG1 RG1 RG1 RG1 No. Date Description Chk'd By
R E V I S I O N
5300

PROJECT :
4000
4150

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
+0.000 +0.000 +0.000 +0.000 +0.000 -0.150 RC WALL W-1 (600mm THK)
+0.000 C1 C1 C1 C1 C1 C1
150

u.0.0
-0.150
u.-0.15

CONSULTANT :
7800

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
-7.800
u.-7.80 STRUCTURAL DRAWINGS

LEAN CONCRETE MF PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
700 Daerah Brunei - Muara,
-7800 Negara Brunei Darussalam

DRAWING TITLE :

FRAMING ELEVATION - 2

FRAMING ELEVATION @GRID u.D


2 Scale 1 : 100
DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST500_FRA02
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:51 pm
A1 00
NORTH

KEY PLAN

u.1 u.2 u.2' u.3 u.4 u.5 u.6

B2 CD2 G2

35000 P
K5 K6
RV
E1 F

1800 3700 5400 9100 9100 5900 A B1 C1 D1


K4

M
K2 K3 J U

K8 N K1

L G1
K7

+5.300
TOP OF ROOF
O

SB1 SB1 SB1 SB1 SB1

1300
SC1 SC1 SC1 SC1 SC1 SC1
+4.000
u.+4.0 RG1 RG1 RG1 RG1 RG1 NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,

5300
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S

4000
4150
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

-0.150 +0.000 +0.000 +0.000 +0.000


+0.000 C1 C1 C1 C1 C1 C1
G1

150
u.0.0 G1 G3 G1 G1 G3 G1 G3 G1 G3
G1 G3
-0.150
u.-0.15 RC WALL W-1 (600mm THK)

RC WALL W-1 (600mm THK)

7800 RC WALL W-2 (600mm THK)

MF
700
-7.800 -7.800 -7800 -7.800 -7.800 -7.800
-7.800
u.-7.80

LEAN CONCRETE

FRAMING SECTION - 1
1 Scale 1 : 100

u.1 u.2 u.2' u.3 u.4 u.5 u.6

I S S U E S

35000
1800 3700 5400 9100 9100 5900

+5.300
TOP OF ROOF
1300

SC1 SB1 SB1 SB1 SB1 SB1 No. Date Description Chk'd By
+4.000
u.+4.0 RG1 RG1 RG1 RG1 RG1 RG1 RG1 R E V I S I O N

RG1 RG1 RG1 RG1 PROJECT :


5300

PURE SALMON LAND-BASED


4000
4150

ATLANTIC SALMON FARM

+0.000 +0.100 +0.000 +0.000 +0.000


+0.000 -0.150 C1 C1 C1 C1 C1
G1
150

u.0.0 G1 G1 G1 G1 G3 G1 G3 G3
-0.150 G3 G3
u.-0.15

RC WALL W-1 (600mm THK) RC WALL W-1 (600mm THK)

RC WALL W-2 (600mm THK) CONSULTANT :


7800

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

MF SCHEMATIC DESIGN PHASE


700 BUILDING U
-7800
-7.800 -7.800 -7.800 -7.800 -7.800 STRUCTURAL DRAWINGS
-7.800
u.-7.80

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
LEAN CONCRETE Negara Brunei Darussalam

DRAWING TITLE :

FRAME SECTION-1

FRAMING SECTION - 2
2 Scale 1 : 100
DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST300_FRA01
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:53 pm
A1 00
NORTH

KEY PLAN

u.A u.B u.C u.N


u.A u.B u.C u.N B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

21200
M
21200 K2 K3 J U

K1
K8 N
L G1

6200 6200 8800 6200 6200 8800 K7

Z 220x2 Z 220x2
+5.300 +5.300
5%
TOP OF ROOF TOP OF ROOF NOTES
1300

1300
SB1 SC1 SC1
SB1 SB1
+4.000 SC1 SC1 +4.000 SC1 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
u.+4.0 RG1 RG1 RG1 RG1 u.+4.0 RG1 RG1 RG1 RG1 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
RG1 RG1 DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
5300

5300
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
4000

4000
4150

4150
+0.000 +0.000 +0.000 +0.100
+0.000 C1 C1 C1 -0.150 +0.000 C1 C1 -0.150
150

150
u.0.0 G1 G1 G1 u.0.0 G1 G1 G1 G1
-0.150 -0.150
u.-0.15 G2 G1 G2 G2 u.-0.15 G2 G2 G2 G2
G2
7800

7800
RC WALL W-1 (600mm THK) RC WALL W-1 (600mm THK)

MF RC WALL W-1 (600mm THK) RC WALL W-1 (600mm THK)


700 MF
-7800 700
-7.800 -7.800 -7.800 -7800 -7.800 -7.800
-7.800 -7.800
u.-7.80 u.-7.80

LEAN CONCRETE LEAN CONCRETE

FRAMING SECTION - 3 FRAMING SECTION - 4


1 Scale 1 : 100 2 Scale 1 : 100

I S S U E S
u.A u.B u.C u.N

21200

6200 6200 8800

Z 220x2 No. Date Description Chk'd By


+5.300
5% R E V I S I O N
TOP OF ROOF
1300

SB1 SC1 PROJECT :


SB1
+4.000 SC1 SC1
u.+4.0 RG1 RG1 RG1 RG1 PURE SALMON LAND-BASED
RG1 ATLANTIC SALMON FARM
5300

4000

EQUIPMENT PAD FOR


4150

PRIMING TANK

+0.000 +0.000 -0.150


+0.000 C1 C1 C1
150

u.0.0 G3 G1 G3 G1
-0.150 G3
u.-0.15 G2 G2
G2 G2 CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809
7800

SCHEMATIC DESIGN PHASE


BUILDING U
RC WALL W-1 (600mm THK) RC WALL W-1 (600mm THK)
STRUCTURAL DRAWINGS
MF
700
-7800 -7.800 -7.800
-7.800 PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
u.-7.80 Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :
LEAN CONCRETE
FRAME SECTION-2

FRAMING SECTION - 5
3 Scale 1 : 100 DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 07/03/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 100
1: 100 ST300_FRA02
SHEET SIZE REV. NO.
DATE PRINTED 07/03/2024 2:58:54 pm
A1
NORTH

KEY PLAN

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

u.A u.B u.C u.N u.A u.B u.C u.N

21200 21200

6200 6200 8800 6200 6200 8800

+5.300 Z 220x2 +5.300 Z 220x2


5%
TOP OF ROOF TOP OF ROOF
1300

1300
SB1 SC1 SB1 SC1
SB1 SC1 SB1 SC1
+4.000 SC1 +4.000 SC1
u.+4.0 RG1 RG1 RG1 RG1 u.+4.0 RG1 RG1 RG1 RG1
RG1 RG1
5300

5300
4000

4000
4150

4150
+0.000 +0.000 -0.150 +0.000 +0.000 -0.150
+0.000 C1 C1 C1 +0.000 C1 C1 C1
150

150
u.0.0 G3 G3 G1 G3 G1 u.0.0 G3 G3 G1 G3 G1
-0.150 G3 G3 -0.150 G3 G3
u.-0.15 G2 G2 u.-0.15 G2 G2
G2 G2 G2 G2

I S S U E S
7800

7800
RC WALL W-1 (600mm THK) RC WALL W-1 (600mm THK) RC WALL W-1 (600mm THK) RC WALL W-1 (600mm THK)

MF MF
700 700
-7800 -7.800 -7.800 -7800 -7.800
-7.800 -7.800 No. Date Description Chk'd By
u.-7.80 u.-7.80 R E V I S I O N
PROJECT :

LEAN CONCRETE LEAN CONCRETE PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

FRAMING SECTION - 6 FRAMING SECTION - 7


1 Scale 1 : 100 2 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

FRAME SECTION-3

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 07/03/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST300_FRA03 100

SHEET SIZE REV. NO.


DATE PRINTED 07/03/2024 2:58:54 pm
A1 00
NORTH

KEY PLAN

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING U
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

3D MODEL

3D MODEL
1 Scale
DRAWN BY CHECKED BY APPROVED BY DATE
PM CR/RB LG 07/03/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST900_GE001 NTS

SHEET SIZE REV. NO.


DATE PRINTED 07/03/2024 2:59:00 pm
A1 00

You might also like