03.18.2024 - Tripa de Gallina Housing Facility Structural Plan v4
03.18.2024 - Tripa de Gallina Housing Facility Structural Plan v4
(STRUCTURAL PLAN)
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: SHEET NO:
METROPOLITAN MANILA TITLE PAGE
WAY MAKER OPC DESIGN AND CONSTRUCTION OF HOUSING FACILITY
DEVELOPMENT AUTHORITY
Doña Julia Vargas Ave, Ortigas Center, Pasig City
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City
REG:
PTR:
PLACE:
MECHANICAL ENGINEER
TIN:
DATE:
DATE: DATE:
FOR THE TRIPA DE GALLINA SOLID WASTE
PROCESSING FACILITY
LOCATION: PASAY CITY, METRO MANILA
S-1
TABLE OF LAP SPLICE & ANCHORAGE LENGTH MAX. SIZE AGGREGATE
STANDARD HOOK (m) LAP SPLICE (m) UNIT MAX. LAP SPLICE LENGTH OF COL.
BAR DIAMETER ANCHORAGE
TENSION BAR COMP. BAR WEIGHT REINF. NOMINAL BARS
(mm) LENGTH (mm)
90 DEG. 180 DEG. 136 DEG. TOP BOT TOP BOT (KG./m.) W/ TIES W/ SPIRAL
10 0.60 0.15 0.13 0.10 0.42 0.30 0.42 0.30 0.017 0.30 0.30
12 0.60 0.20 0.15 0.12 0.42 0.30 0.42 0.30 0.30 0.30
16 0.60 0.25 0.15 0.14 0.73 0.52 0.87 0.62 0.52 0.47
20 0.60 0.30 0.20 0.20 0.91 0.65 1.10 0.75 0.52 0.47
BLOCK R E I N F O R C E M E N T
THICKNESS
(mm) HORIZONTAL VERTICAL
10mm dia. 10mm dia.
100 @ 400mm O.C.
@ 600mm O.C.
35
WELD SIZE, S SCALLOP SIZE WELD ALL AROUND
PLATE THICKNESS (MM) (MM)
35
(MM)
T JOINTS LAP JOINTS RADIUS R 26
35
35
45°
35
12 - 15 9 9 35
26
15 - 18 9 9 35
TYP. CHAMBERING
19 - ABOVE 12 12 35 t=t1 OR 12, WHICHEVER IS THINNER and COMPLETE PENETRATION WELD SET
NOTE: UNLESS OTHERWISE SPECIFIED, SIZE OF FILLET WELDS SHALL NOT EXCEED THE THICKNESS OF THE THINNER MATERIAL BEING JOINT
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: SHEET NO:
METROPOLITAN MANILA GENERAL NOTES
WAY MAKER OPC DESIGN AND CONSTRUCTION OF HOUSING FACILITY
DEVELOPMENT AUTHORITY
Doña Julia Vargas Ave, Ortigas Center, Pasig City
CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS
792 F. Manalo St., Bambang, Pasig City
REG:
PTR:
PLACE:
MECHANICAL ENGINEER
TIN:
DATE:
DATE: DATE:
FOR THE TRIPA DE GALLINA SOLID WASTE
PROCESSING FACILITY
LOCATION: PASAY CITY, METRO MANILA
S-2
CHECK IF IT IS ONE WAY OR TWO
WAY SLAB?
D
4000
4000
4/2.313=1.72 WHICH IS
LESS THAN TO TWO
2313
B B
S1 S1
4000
4000
2313
C C
S1 S1
4000
4000
2313
D D
S1 S1
4000
4000
NATURAL GRADE LINE
2313
E E
LD
for beams check the minimum
COLUMN LINKS
D
reinforcement required Asmin as per NSCP
2015(see 409.6), if not change 2-#12 to REINFORCEMENT ALONG REINFORCEMENT ALONG
W - DIRECTION W - DIRECTION
4#12
W
REINFORCEMENT ALONG REINFORCEMENT ALONG
L - DIRECTION L - DIRECTION
t
50
50MM THK PCC
4375 4625 4375 4625
L L L
1 2 3 1 2 3 50
CL
B2 250 350 2-#12 2-#12 2-#12 2-#12 3-#12 3-#12 13-2L-#10@105 C/C 11-2L-#10@105 C/C 13-2L-#10@105 C/C - - -
B3 250 350 2-#12 2-#12 2-#12 2-#12 2-#12 2-#12 15-2L-#10@105 C/C 13-2L-#10@105 C/C 15-2L-#10@105 C/C 1-#12EF - -
B4 250 350 2-#12 2-#12 2-#12 2-#12 2-#12 2-#12 14-2L-#10@105 C/C 12-2L-#10@105 C/C 14-2L-#10@105 C/C 1-#12EF - -
B5 250 350 2-#12 2-#12 2-#12 2-#12 2-#12 2-#12 15-2L-#10@105 C/C 13-2L-#10@105 C/C 15-2L-#10@105 C/C - - -
1 1
BOT BARS
S-3
MECHANICAL ENGINEER SECOND FRAMING PLAN
DEVELOPMENT AUTHORITY CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
REG: TIN: FOR THE TRIPA DE GALLINA SOLID WASTE FOUNDATION TIE BEAM DETAIL
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
Doña Julia Vargas Ave, Ortigas Center, Pasig City
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS PTR: DATE: PROCESSING FACILITY FOOTING DETAIL
792 F. Manalo St., Bambang, Pasig City
PLACE: DATE: DATE: LOCATION: PASAY CITY, METRO MANILA SLAB ON GRADE DETAIL
E D C B A 3 2 1
A 4000 4000 4000 4000 4625 4375
4000
TOP OF ROOF BEAM 7.00
3000
3000
3000
B
SECOND FLOOR LINE 4.00 SECOND FLOOR LINE 4.00
1740
4000
3500
3500
3500
C TOP OF PEDESTAL 0.50 TOP OF PEDESTAL 0.50
500
500
N.G.L. 0.00
300
N.G.L. 0.00
300
FOUNDATION TIE BEAM -0.30 FOUNDATION TIE BEAM -0.30
4000
2700
2700
FOOTING -3.00 FOOTING -3.00
D
pleased check the
CHANGE 4-#19+4-#16
yield strength used
5 ELEVATION ON GRID 2 TO 4-#20+4-#16
ELEVATION ON GRID A
4000
in reinforcement as 4
per general notes: SCALE: 1:60
S-6 S-5 SCALE: 1:40
Fy=414 MPa for
grade 60 not 420
MPa
E C25 SIZE 250 X 250 380 X 380 380 X 380
380
380
250
4375 4625 LINKS #10@250 C/C #10@250 C/C #10@250 C/C
1 2 3 250 380 380
#19
3 ROOF BEAM PLAN COLUMN MARKED P1 P2 P3 P1 P2 P3 #16
SCALE: 1:100
S-5
TOP VIEW
TWO WAY`
111.44
430
400
5/8"
5/16
HOLE TYPE (BEAM): STANDARD (STD)
40 5/16 HOLE TYPE (CONNECTOR): STANDARD (STD)
450 4 BOLTS: 58" A325 N MIDSPAN/ COLUMN STRIP
91
91
A36
PL 430x430x18
18
L/4 L/4
155
75
PLEASE CHECK
BASE PLATE DETAILS STEEL_GR50
THE MARK UP
165 W10X54 12 SCHEDULE FOR
A36
PL 12X165X155 SLAB USED TWO
STEEL_GR50
W12X120
WAY SCHEDULE
D
TOP VIEW TOP VIEW STEEL DECK
B L/6
BOTTOM BARS SHORT DIR,
MIDSPAN/ COLUMN STRIP
BEAM-COLUMN TOP BARS LONG DIRECTION
L/4 L/4
CONNECTION DETAILS BEAM-COLUMN
40
CONNECTION DETAILS
LATERAL VIEW
FRONT VIEW
50
FRONT VIEW
4/16
40 4/16
HOLE TYPE (BEAM): STANDARD (STD)
LATERAL VIEW
HOLE TYPE (CONNECTOR): STANDARD (STD)
135 3/16
STEEL DECK
2 BOLTS: 34" A325 N HOLE TYPE (BEAM): STANDARD (STD)
73
73
3/16
35
110
88
88
45
170
80
STEEL_GR50
80 W10X54 10
A36 STEEL_GR50 STEEL_GR50
PL 10X80X180 W10X54
90 W10X54 6
STEEL_GR50 A36
W12X120
PL 6X90X170
S-4
MECHANICAL ENGINEER ELEVATION PLAN
DEVELOPMENT AUTHORITY CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
REG: TIN: FOR THE TRIPA DE GALLINA SOLID WASTE CONNECTION DETAIL
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
Doña Julia Vargas Ave, Ortigas Center, Pasig City
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS PTR: DATE: PROCESSING FACILITY COLUMN PEDESTAL DETAIL
792 F. Manalo St., Bambang, Pasig City
PLACE: DATE: DATE: LOCATION: PASAY CITY, METRO MANILA STEEL DECK SLAB DETAIL
3 2 1
A
4625 4375
4000
B
925 925 925 925 925 875 875 875 875 875
4000
C
4000
E
6 TRUSS DETAILS
SCALE: 1:30
S-6
4375 4625
1 2 3
SPOT DETAIL
PREPARED BY: RECOMMENDING APPROVAL: APPROVED BY: PROJECT TITLE: SHEET CONTENTS: SHEET NO:
METROPOLITAN MANILA ROOF FRAMING PLAN
WAY MAKER OPC DESIGN AND CONSTRUCTION OF HOUSING FACILITY
S-5
MECHANICAL ENGINEER TRUSS DETAIL
DEVELOPMENT AUTHORITY CONCRETE BATCHING PLANT, ASPHALT BATCHING PLANT,
REG: TIN: FOR THE TRIPA DE GALLINA SOLID WASTE CONNECTION DETAIL
CONSTRUCTION OF ROADS & ASPHALT, SUPPLIER OF
Doña Julia Vargas Ave, Ortigas Center, Pasig City
CONCRETE PIPE AND OTHER CONCRETE PRODUCTS PTR: DATE: PROCESSING FACILITY SPOT DETAIL
792 F. Manalo St., Bambang, Pasig City
PLACE: DATE: DATE: LOCATION: PASAY CITY, METRO MANILA