Dhaka, Bangladesh
RPN
Sl. RPN Risk Accepted?
(Ref.: Appendix- Recommended action Responsibility S P D
No. (SxPxD) Class Y or N
E)
.
1. Cleaning procedure SOP of Hose pipe and dies
Production Y, based on
punch will be change
01 16 and 4 1 1 4 Low implementation of
2. Cleaning validation will be done according to new Validation proposed risk
method and sampling technique.
reduction action.
Summary of Risk Assessment: The proposed risk reduction action may eliminate the risk associated this changes.