Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

BATTERY

SHARING REPLACEMENT
KNOWLEDGE2020
XL PROJECT
BATTERY LITHIUM
INT

48V LiFePO4 Battery

2023
Battery Panel
BATTERY REPLACEMENT 2020
XL PROJECT
BATTERY REPLACEMENT 2020
XL PROJECT
Configuration Installation
BATTERY REPLACEMENT 2020
XL PROJECT
KHA Kabel PUIL 2011
Specification Battery
BATTERY REPLACEMENT 2020
XL PROJECT
Front Battery
Battery Panel :

BATTERY REPLACEMENT 2020


XL PROJECT

1 2 3 4 5 6 7 8 9 10 11 12 13 14
No Item Function Remark
1 CHARGE(SOC) light Battery capacity estimation light
2 ALM light Abnormal alarm indicator light
3 RUN light Function normal indicator light
4 ADD System expand the application
5 RS485 Port Comunication to Laptop / Battery others with System RS485
6 SNMP Ip system network management
7 RESET Emergency system reset key
8 DO1DO2 Dry contact port
9 Socket Socket dry contact
10 S/n Bar Serial number battery
11 QC letter Status QC
12 +- Input / Output therminals power
13 Handle Moving handle
14 Hanging Ear Install, fix
BATTERY REPLACEMENT 2020
Posisi kabel komunikasi Battery - RS485 & ADD/Alamat
XL PROJECT
Posisi pemasangan kabel komunikasi RS485 Tabel ADD / Alamat komunikasi antar battery

1. Pack #1 1. Pack #1

2. Pack #2 2. Pack #2

3. Pack #3
Posisi kabel komunikasi Dry Contact Connection

BATTERY REPLACEMENT 2020


XL PROJECT
Posisi pemasangan kabel DO1DO2 Tabel DO1DO2 Terminal Block

1.Posisi Pemasangan 1. Before


(jika akan di koneksikan)

2.Kabel Dry Contact


(Standby)
2. After (Standby)
Dry Contact Definition

a. Normally open when there is no alarm,

b. and close for 5 minutes when there is an alarm (if the battery is over-
BATTERY REPLACEMENT 2020
discharged (single over-discharge or over-discharge),
XL PROJECT
c. the closing time is 2 minutes, and it is disconnected after two minutes)

The first dry contact : - Battery failure, - BMS failure,


Dry Contact Definition

The second dry contact : - Over current, - Short circuit,

- Over voltage, - Under voltage alarm,

- mainly due to the fault caused by switching power supply or load.


Communiation Battery to Laptop
via RS485

BATTERY REPLACEMENT 2020


Preparation :
1. Konsul USB-Serial RS485
XL PROJECT
2. Kabel UTP / LAN
3. Konnetor RJ45
Start Insert Dashbord Software

Preparation : Kabel konsul USB-Serial 485


Language change to English
BATTERY REPLACEMENT 2020
XL PROJECT
Dashbord Software

BATTERY REPLACEMENT 2020


XL PROJECT
Dashbord
DashbordSoftware
Software

BATTERY REPLACEMENT 2020


XL PROJECT
Dashbord Software

Monitoring All Pack Battery


BATTERY REPLACEMENT 2020
XL PROJECT
Dashbord Software

Parameter
BATTERY REPLACEMENT 2020
XL PROJECT
Dashbord Software

Parameter
BATTERY REPLACEMENT 2020
XL PROJECT
Dashbord Software

Parameter
BATTERY REPLACEMENT 2020
XL PROJECT
PROTECTION AND ALARM

PROTECTION TYPES DATA UNIT Protection Release Remarks ALARM TYPES DATA UNIT
CELL VOLTAGE PROTECT CELL VOLTAGE ALARM
Cell Over Voltage Start 3,85 V 3.4 V / Battery Discharge Cell Over Voltage Start 3,7 V
Cell Under Voltage Start 2,5 V 3.1 V /Battery Charging Cell Under Voltage Start 2,7 V
PACK VOLTAGE PROTECT PACK VOLTAGE ALARM
Pack Over Voltage Start 56 V 50.2 V / Battery Discharge Pack Over Voltage Start 55 V
Pack Under Voltage Start 39 V 48 V / Batteries Charging Pack Under Voltage Start 43 V
CURRENT PROTECT CURRENT ALARM
If charging more then
Battery Discharge / Suplay 105A, it will
Charging Over Current Start 105 A Charging Over Current Start 100 A
Input Off automatically reduce
to 10A
Battery Charge / Suplay
Discharge Over Current Start 105 A Or batteries charging Discharge Over Current Start 100 A
Output Off
TEMPERATURE PROTECT TEMPERATURE ALARM
Charging Over Temp Start 60 Celcius 55 Celcius Charging Over Temp Start 55 Celcius
Charging Under Temp Start 0 Celcius 5 Celcius Charging Under Temp Start 5 Celcius
Discharge Over Temp Start 65 Celcius 60 Celcius Discharge Over Temp Start 50 Celcius
Discharge Under Temp Start -20 Celcius -10 Celcius Discharge Under Temp Start -10 Celcius
MOS_OT_START 110 Celcius 85 Celcius MOS_OT_Start 90 Celcius
Environment Over Temp Start 70 Celcius 65 Celcius Environment Over Temp Start 50 Celcius
Environment Under Temp Protect -25 Celcius -20 Celcius Environment Under Temp Start 0 Celcius

Recommended Charge Until Current 20A / Pack


Dashbord Software

System Parameter
BATTERY REPLACEMENT 2020
XL PROJECT
Aktifation G-Sensor Alarm
BATTERY REPLACEMENT 2020
XL PROJECT
Aktifation G-Sensor Alarm
BATTERY REPLACEMENT 2020
1. Pilih Menu pada Aplikasi “System Settings”,
2. Klik menu “Anti-theft Settings", XL PROJECT
3. Klik menu "Read", untuk melihat status apakah ada yang terchecklist “√’
4. Pilih “Phy_Anti-theft”, kemudian klik “Set”,
5. Klik menu "Read", untuk memastikan status apakah “Phy_Anti-theft” sudah terchecklist “√’,
6. Kembali ke Menu utama “BMS Monitoring”, pastikan “Anti-theft active On” telah berwarna
hijau, memandakan Anti-theft telah aktif,

7. Lakukan "Hal yang sama" pada masing-masing Pack Battery yang sudah terpasang di lokasi
untuk mengAktifkan Alarm G-Sensornya.
Dashbord Software

History Per Pack Battery


BATTERY REPLACEMENT 2020
XL PROJECT
Contoh Alarm

BATTERY REPLACEMENT 2020


XL PROJECT
Contoh Alarm

BATTERY REPLACEMENT 2020


XL PROJECT
Communiation Battery to Laptop
via SNMP

BATTERY REPLACEMENT 2020


Preparation :
XL PROJECT
1. Laptop support LAN
2. Kabel UTP / LAN
3. Konnetor RJ45
4. Konfigurasi kabel RJ45 = straight
Setting IP
BATTERY REPLACEMENT 2020
XL PROJECT
Ping IP
BATTERY REPLACEMENT 2020
XL PROJECT
Dashbord Software

Menu Utama
BATTERY REPLACEMENT 2020
XL PROJECT
Dashbord Software

Parameter
BATTERY REPLACEMENT 2020
XL PROJECT
Resume

1. Configurasi Instalasi Battery


BATTERY REPLACEMENT 2020
XL PROJECT
a. Satu MCB Battery harus dedicate untuk 1 battery lithium,
b. Jika Install lebih dari 1 battery, panjang kabel dari MCB Battery ke battery lithium harus sama
c. Penggunaan luas penampang kabel harus diperhatikan dan disesuaikan dengan beban setiap
lokasi sesuai dengan PUIL 2011

2. Status “Limit” direkomendasikan dalam keadaan “ON”, untuk dapat menikmati dari kelebihan
battery wolong yang jika terdapat arus lebih charging mampu mereduce menjadi 10A

3. Rekomendasi charging maksimal di range 20A

4. Rekomendasi themperature kabinet battery 25℃, sehingga jika outdoor harus terpasang
colling systemnya dengan baik dan terawat, (bisa denagn Fan maupun AirCon).

5. Jangan melakukan aktifitas yang menyebabkan panas pada bagian depan battery, karena bisa
menyebabkan kerusakan sensor temperatur yang ada di BMS.
Contoh salah : pembuatan kerangkeng battery yang langsung ngelas persis dekat dengan
bagian depan battery.
BATTERY REPLACEMENT 2020
XL PROJECT
Thank you!

You might also like