ROOF TOP LVL

+14'-6" LVL ROOF TOP LVL


+14'-6" LVL
ROOF BOTTOM
+11'-0" LVL ROOF BOTTOM
+11'-0" LVL
F.F.L +1'-0" LVL F.F.L +1'-0" LVL
GROUND LVL 0'-0" LVL GROUND LVL 0'-0" LVL
SIDE ELEVATION

3'-6" [1.07m]
FRONT ELEVATION
R.C.C SLAB ROOF TILES

2' [0.61m]
AS/SELECTED
R.C.C SLAB

2' [0.61m]
R.C.C BEAM

14'-6" [4.42m]
R.C.C BEAM

7' [2.13m]
[1.83m]
[0.30m]
BRICKWALL BRICKWALL
SHOWER DRESS CORRIDOR

1' 6'
F.F.L
GROUND LVL
SECTION - CC SECTION - DD
45'-312" [13.80m] D
SHOWER SHOWER SHOWER SHOWER
SHOWER 4'-0"X3'-9" SHOWER
4'-0"X3'-9" 4'-0"X3'-9" 4'-0"X3'-9" 4'-0"X3'-9" 4'-0"X3'-9" W/C W/C
W/C W/C 4'0"X5'6"
C 4'0"X5'6"
4'2"X5'6" 4'2"X5'6"
DRESS
13'-3" [4.04m]

DRESS DRESS DRESS DRESS


4'-0"X3'-0" DRESS
4'-0"X3'-0" 4'-0"X3'-0" 4'-0"X3'-0" 4'-0"X3'-0" 4'-0"X3'-0"
421" THK C
BRICK WALL 9" THK
LADIES TOILET GENTS TOILET BRICK WALL
POLISHED KOTA
STONE PAVING
D
FLOOR PLAN