1) GENERAL NOTES: 8. POLYTHENE SHEETS 1000 GAUGE TO BE LAID BELOW 12. MINIMUM 6 NOS.

OF CONCRETE CUBE SHALL BE TAKEN ON

1. DIMENSIONS TO BE CHECKED AS PER THE SITE CONDITION. FOUNDATIONS,TOP OF P.C.C. EACH DAY OF CONCRETING OR FOR EACH 100 Cube.m. OF 9) DESIGN CONSIDERATION
CONCRETE OR AS DECIDED BY THE ENGINEER.THE CUBES
SHALL BE TESTED AT A LABORATORY APPROVED BY THE A) STATIC LOADS ONLY CONSIDERED IN DESIGN
2. ALL DIMENSIONS ARE IN FEET AND INCHES 9. ALL STRUCTURES BELOW GROUND LEVEL IN CONTACT WITH
SOIL SHALL BE PAINTED WITH TWO COATS OF BITUMEN, ENGINEER AND IN ACCORDANCE WITH THE RECOMMENDATIONS B) FOR RESIDENTIAL BUILDING 0.75KN/M2 LIVE LOAD
UNLESS OTHER WISE MENTIONED. OF IS IS 456 - 2000. C) SEISMIC ASPECTS WERE NOT CONSIDERED
TO THE ENGINEER'S APPROVAL.
3. ALL LEVELS ARE IN FEET UNLESS OTHER WISE MENTIONED.
4) STEEL REINFORCEMENT NOTES: 13. ALL CONSTRUCTION JOINTS, COLUMN HEADS CONCRETE TO BE
CHIPPED BEFORE NEW CONCRETING.
4. ANY DISCREPANCY IN DRAWING SHALL BE NOTIFIED TO 1. REINFORCING BARS ARE TO IS 1786-2008.
THE STRUCTURAL CONSULTANT BEFORE STARTING THE WORK. 6) FORM WORK NOTES:
2. ALL REINFORCEMENT BARS & LINKS ARE TO BE HIGH TENSILE
5. READ THE DRAWING ALONG WITH ARCHITECTURAL DRAWING HAVING YIELD STRESS OF 500 N/Sq.mm. 1. STABILITY OF THE FORM WORK RESPONSIBILITY
OF THE CONTRACTOR.
6. STABILITY OF FORM WORK RESPONSIBILITY OF CONTRACTOR. 3. REINFORCEMENT BARS ARE TO BE COLD BENT WITH A MAXIMUM
RADIUS OF 8 TIMES DIAMETER,EXCEPT FOR STIRRUPS AND 2. BEFORE CONCRETING CHECK AND FINALIZED THE LEVEL OF
7. ALL LAPS SHALL CONFORM TO IS:456-2000. (REFER NOTE - 9) COLUMN TIES WHICH ARE TO BE 4 TIMES BAR DIAMETER. TOP OF CONCRETE WORK.

8. NET ALLOWABLE BEARING CAPACITY CONSIDER AT 4. WHERE BARS END IN COLUMNS,BEAMS & SLABS, A HOOK OF 3. ALL SHUTTERING WORKS DONE ONLY BY THE EITHER CONCRETE
FOUNDING LEVEL AS SAFE BEARING CAPACITY. 90° OR 180° WITH A STRAIGHT END OF 12 BAR DIAMETER AND (OR) WOOD,STEEL SURFACE.
6 BAR DIAMETER RESPECTIVELY SHOULD BE PROVIDED.
9. CONCRETE FOR R.C.C SHALL CONFIRM TO M-20,GRADE AS PER 4. PROVIDED SHUTTERING SIZES MUST REQUIRED FOR AS PER
IS: 456-2000 WITH COURSE AGGREGATE OF MAX.SIZE 20mm. 5) CONCRETE NOTES: STRUCTURAL RECOMMENDED SIZES IN DRAWING.

10. # DENOTES HIGH YIELD STRENGTH DEFORMED BARS Fe 500 1. MIX DESIGN :- CONCRETE MIX SHOULD BE DESIGNED TO GIVE
Sq.mm . CUBE AND MAXIMUM FREE 5. ABOVE FLOOR FINISHED LEVEL FORM WORKS THE LABORS
GRADE CONFIRM TO IS: 1786-2008. MINIMUM CUBE STRENGTH OF 20N/
SHOULD BE PROVIDES ALL SAFETY MATERIALS.
WATER/CEMENT RATIO 0.50
2) TECHNICAL NOTES: MIX SHOULD BE VERIFIED BEFORE CASTING AND APPROVED BY THE
6. THE ANY KIND OF SHUTTERING MATERIALS SHOULD BE PAINTED
ENGINEER. DESIGN AND CONSTRUCTION TO COMPLY WITH IS 10262:1982
2.COVERS WITH OIL WITH INNER SURFACE BEFORE CONCRETING.
2.1 FOR GRADE / PLINTH BEAM 25 MM (1") 2. ORDINARY PORTLAND CEMENT TO BE USED FOR ALL WORKS
2.2 FOR FOOTING / PILE CAP BOTTOM 50 MM (2") 7. FOUNDATION & GRADE BEAM FORM WORKS WILL BE MUST DONE
ABOVE PLINTH.UNLESS OTHERWISE SHOWN ON THE DRAWINGS.
2.3 FOR COLUMN 40 MM (2") ONLY BY THE TOP OF P.C.C SURFACE.
2.4 FOR FOOTING / PILE CAP SIDE 75 MM (3") 3. COARSE AND FINE AGGREGATES ARE TO BE TO I.S 383
2.5 FOR ALL ROOF BEAM 25 MM (1" ) 8. AFTER COMPLETED THE SHUTTERING WORK PROVIDE PROPER
2.6 FOR ALL ROOF SLAB 20 MM (3/4") PROPS AND STRUT & OUTSIDE SUPPORTS.
4. WATER IS TO BE TO I.S 3025 (REFER BELOW SCHEDULE) :-
2.7 FOR R.C.C WALL (SHEAR WALL,SUMP) 40 MM (1-1/2")
2.8 FOR PILE SIDE 50 MM (2") 9. THE CLEAR SIZE OF FORM WORKS CHECK AND CONFIRM THE
2.9 FOR SUMP BOTTOM SLAB 40 MM (1-1/2") SITE ENGINEER RESPONSIBILITY.
SI. PERMISSIBLE LIMIT,
2.10 FOR COVER SLAB 25 MM (1") NO DESCRIPTION (MAX.)
10. THE SHUTTERING DO NOT REMOVE THE BEFORE
1) ORGANIC 200 mg/l M/s P RAJAH PRAKASH
CONCRETE RIGIDITY TIME (OR) STRUCTURAL ADVICES DAY
AFTER CASTING CONCRETE 2) INORGANIC 3000 mg/l
3.REMOVAL OF FORM WORKS (REFER TECHNICAL NOTES FIRST SHEET).
43 GRADE 53 GRADE 3) SULPHATE (as SO3) 400 mg/l
4) CHLORIDES (AS Cl) 500 mg/l
3.1 FOR COLUMNS 24 HOURS 12 HOURS 11. THE STRUCTURAL CONSULTANT RECOMMEND FOR THE
5) SUSPENDED MATTER 2000 mg/l
3.2 FOR ROOF BEAM SIDE 24 HOURS 12 HOURS FRAMED STRUCTURE CONSTRUCTION ONLY.DO NOT DO THE
LOAD BEARING CONSTRUCTION.
AS civil Engg services
4.FOR ROOF BEAM BOTTOM
4.1 CLEAR SPAN LESS THAN 6M : 14 DAYS 07 DAYS 7) CURING WORK NOTES:
4.2 CLEAR SPAN MORE THAN 6M : 21 DAYS 14 DAYS 5. PLAIN CONCRETE USED BELOW FOOTINGS SHALL BE OF MINIMUM
1. AFTER COMPLETION OF THE CONCRETING WORK CURING IS MUST
STRENGTH AT 28 DAYS OF 10 N/Sq.mm AND MINIMUM CEMENT OF
5. DESIGNED FOR GROUND STOREY TRUSS ROOF ONLY IN 8 HOURS.
220 Kg/Cube.m.
2. WET COVERINGS SUCH AS WET GUNNY BAGS,
3) FOUNDATION NOTES: 6. NO CONCRETING IS ALLOWED AT A SHADE TEMPERATURE
JUTE MATTING,STRAW ETC.,ARE WRAPPED TO VERTICAL SURFACE
EXCEEDING 37° C CONCRETE TEMPERATURE AS PLACED SHALL NOT
1. SAFE BEARING CAPACITY OF SOIL (S.B.C) IS SHOWN ON THE FOR KEEPING THE CONCRETE WET.
EXCEED 33° C, IN ALL CASES THE CONTRACTOR SHALL NOTIFY AND
FOUNDATION DRAWINGS. OBTAIN THE ENGINEER'S APPROVAL WITH REGARD TO THE TIME
3. THE CURING STRENGTH SHOULD BE ATTAIN THE CONCRETE
FOR CONCRETING.
2. AFTER EXCAVATION FOR FOUNDATIONS IMPORTED SOIL MEMBER REQUIRED FOR MINIMUM 7 DAYS AND MAXIMUM 21 DAYS.
STRUCTURAL DRAWING
FOR FILLS,BACKFILLS SHALL BE COMPACTED 95 % OF THE 7. NO OPENING SHALL BE MADE IN CONCRETE WORKS WITHOUT 8) DEVELOPMENT LENGTH VALUES:
MAXIMUM DRY DENSITY OF THE SOIL. WRITTEN PERMISSION OF THE ENGINEER.

3. DEPTH OF EXCAVATION OF FOUNDATION SHOULD BE CHECKED 8. SECTION AT NECK OF COLUMN BELOW PLINTH LEVEL IS TO BE CONCRETE STEEL TENSION COMPRESSION INDUSTRIAL BUILDING
GRADE GRADE (EX: BEAM,etc.,) (EX: COLUMN,etc.,)
WITH RESPECT TO THE EXISTING NEIGHBOURS,DESIGNED
DEPTH AND APPROVED BY THE ENGINEER.
INCREASED ON EACH SIDE INORDER TO HAVE A CLEAR CONCRETE
M 20 Fe 415 50 X d 40 X d
at TRICHY
COVER TO REINFORCEMENT OF MINIMUM 3" (75 mm).
M 25 Fe 415 42 X d 36 X d
4. THE CONTRACTOR SHALL PROVIDE,IF NECESSARY,PROPS AND 9. VIBRATORS MUST TO BE USED FOR ALL CONCRETING WORKS. M 30 Fe 415 40 X d 34 X d
SUPPORT TO EXISTING STRUCTURES FOR SAFETY AND
ACCORDING TO THE INSTRUCTIONS OF THE ENGINEER. 10. FRESHLY PLACED CONCRETE SHALL BE PROTECTED FROM M 20 Fe 500 60 X d 48 X d
RAIN,DUST,AND SUN RAYS.CONCRETE TO BE CURED FOR 7 DAYS M 25 Fe 500 50 X d 40 X d
5. GROUND WATER ENCOUNTERS REFER DEWATERING NOTES. AS REQUIRED BY THE ENGINEER USING FRESH WATER AND M 30 Fe 500 48 X d 38 X d
COVERED WITH JUTE MATTING.
6. NO FOUNDATION SHALL PROJECT OUTSIDE THE PLOT.
SIGNATURE OF SITE ENGINEER/SITE INCHARGE:
11. ADMIXTURES TO BE USED ONLY AFTER WRITTEN APPROVAL OF
7. ALL FOUNDATIONS ARE TO REST ON P.C.C. 6" THICKNESS. (NOTE: THE NOTES COMPULSORY FOLLOW IN ALL SITE STRUCTURAL WORKS,
THE ENGINEER. USED OF ADMIXTURES CONTAINING CHLORIDE IF YOU WANT ANY CLARIFICATION CONSULT WITH STRUCTURAL OFFICE,IF YOU DO NOT
IS NOT PERMITTED. FOLLOWS TAKE YOUR OWN RISK,NOT RESPONSIBILITY IN A STRUCTURAL CONSULTANCY.
A B B' C C' C'' D E E' E'' F G G' G'' H

83'-8"
FLOOR FINISH 2"THK
20'-11" 20'-11" 20'-11" 20'-11"
1 1 1 1 1 1 1 1 REFILLING WITH EXCAVATED
10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " P.C.C 1:4:8 4.5" THK
2 2 2 2 2 2 2 2 WELL CONSOLIDATED EARTH

W
1 1 SAND FILLING
PLINTH BEAM G.L
F3 Fs F3 Fs F3 Fs F3 Fs F3
12'-2 "

N
6"

S
3
4

R.C COLUMN
2 2

E
F3 F3 COLUMN MAIN RODS
12'-2 "
3
4

(UP TO HARD STRATA)


TIES
3 3 R.C FOOTING
F3 F3
12'-2 "

3"
3
4

(TYP)
REINFORCEMENT

DEPTH OF
FOOTING
4 4 AS PER SCHEDULE

D
F3 F3
12'-2 "
3
4

P.C.C 1:5:10

6"
SAND FILLING

6"
5 5
3" LX 3"
106'-8 "
2
1

F3 F3
M/s P RAJAH PRAKASH
12'-2 "

SECTION - A A
3
4

6 6
3" LENGTH ( Lx) 3"
F3 F3
12'-2 "
3
4

3"
EDGE OF

7 7
P.C.C AS civil Engg services
EDGE OF

WIDTH (Ly)
F3 F3 FOOTING
12'-2 "
3
4

A
F2 F4 F2 F3

Ny
8 8 REINFORCEMENT AS PER
Fs SCHEDULE
10'-5 "

F3
3
4

NX
F3 F4 REINFORCEMENT AS PER
F2
9 9 SCHEDULE

3"
Fs Fs
10'-7 "
2
1

F1 F4 F4 PLAN OF FOOTING
Fs Fs F3 Fs F3
10 10
PLAN OF TYPICAL FOOTING
STRUCTURAL DRAWING
3 1 3 3 3 3 3 3
5'-9 " 15'-1 " 9'-6 " 9'-6 " 10'-10 " 10'-10 " 10'-10 " 10'-10 "
4 4 4 4 4 4 4 4

INDUSTRIAL BUILDING
83'-8"

SCHEDULE OF FOOTINGS : SBC--Considered in Design--200kn/m2


at TRICHY
A B B' C C' C'' D E E' E'' F G G' G'' H
if soil is weak inform us before execution
FOOTING FOOTING SIZE DEPTH REINFORCEMENTS
NO
EXCAVATION-FOOTING- DETAILS TYPE LX LY
D nx ny

(CENTER LINE OF WALLS) Fs 10 2'6" 2'6" 0'10" 10mm - @ 5" c/c BOTHWAYS
F1 1 3'3" 3'3" 1'0" 10mm - @ 5" c/c BOTHWAYS
F2 3 4'0" 4'0" 1'3" 10mm - @ 5" c/c BOTHWAYS
F3 22 4'9" 4'9" 1'3" 10mm - @ 5" c/c BOTHWAYS
F4 4 5'3" 5'3" 1'6" 10mm - @ 5" c/c BOTHWAYS
A B B' C C' C'' D E E' E'' F G G' G'' H
SCHEDULE OF COLUMNS :
83'-8" COLUMN REINFORCEMENTS REINFORCEMENTS
20'-11" 20'-11" 20'-11" 20'-11"
SIZE Nos
No MAIN SHEAR
1 1 1 1 1 1 1 1
10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 "
2 2 2 2 2 2 2 2

W
Cs 9" x 1'-0" 10 #12mm- 4 Nos 2L-# 8mm @ 7" c/c
1 1
Stub column
C5 Cs C4 Cs C4 Cs C4 Cs C5
12'-2 "

N
S
3
4

C1 9" x 1'-3" 2 #16mm- 8 Nos 3L-# 8mm @ 7" c/c


2 2
C5 C5

E
#16mm- 6 Nos
12'-2 "

C2 1 3L-# 8mm @ 7" c/c


3
4

9" x 1'-3" #20mm- 2Nos


3 3
C5 C5
C3 9" x 1'-6" 2 #20mm- 8Nos 3L-# 8mm @ 7" c/c
12'-2 "
3
4

4 4
C5 C5 C4 1'-0" x 1'-6" 5 #16mm- 8Nos 3L-# 8mm @ 7" c/c
12'-2 "
3
4

C5 #16mm- 6 Nos
5 5 1'-3" x 1'-6" 20 3L-# 8mm @ 7" c/c
C5 C5 #20mm- 2Nos
106'-8 "
2
1

M/s P RAJAH PRAKASH


12'-2 "
3
4

6 6
C5 C5
12'-2 "
3
4

7 7
AS civil Engg services
C5 C5
12'-2 "
3
4

C5 C1 C3 Cs C4 C5
8 8
10'-5 "
3
4

C2 C5 C5
9 9
Cs Cs
10'-7 "
2
1

C1 C3 Cs C5 Cs C4 Cs C5
10 10

STRUCTURAL DRAWING
3 1 3 3 3 3 3 3
5'-9 " 15'-1 " 9'-6 " 9'-6 " 10'-10 " 10'-10 " 10'-10 " 10'-10 "
4 4 4 4 4 4 4 4

INDUSTRIAL BUILDING
83'-8"

at TRICHY
A B B' C C' C'' D E E' E'' F G G' G'' H

COLUMN POSITION- DETAILS


(CENTER LINE OF WALLS)
A B B' C C' C'' D E E' E'' F G G' G'' H

83'-8" C.S OF GRADE BEAMS (4M---9" WALL LOAD CONSIDERED IN DESIGN)


20'-11" 20'-11" 20'-11" 20'-11"
1 1 1 1 1 1 1 1 BEAM AT MID SPAN AT SUPPORT
10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 " 10'-5 "
2 2 2 2 2 2 2 2
9" 9"

W
2-12# 2-12#
1 1
GB-01 GB-01 GB-01 GB-01 GB-01 GB-01 GB-01 GB-01
GB-01 8#@8" C/C - 2L 8#@8" C/C - 2L

1'-0"

1'-0"
12'-2 "

N
S
3
4

GB-02

GB-02
16#CKD 16#CKD
2-12# 2-12#
2 2

E
12'-2 "
3
4

9" 9"
GB-02

GB-02
2-16# 2-16#
3 3
GB-02 8#@8" C/C - 2L 8#@8" C/C - 2L

1'-3"

1'-3"
12'-2 "

12#CKD
3
4

GB-02

GB-02
12#CKD
2-16# 2-16#
4 4
12'-2 "
3
4

GB-02

GB-02
5 5
106'-8 "
2
1

M/s P RAJAH PRAKASH


12'-2 "
3
4

GB-02

GB-02
6 6
12'-2 "
3
4

GB-02

GB-02
7 7
AS civil Engg services
GB-02
12'-2 "
3
4

GB-02
GB-01 GB-02 GB-01 GB-01
8 8
GB-01

GB-01

GB-01
10'-5 "

GB-01
3
4

GB-02 GB-01 GB-01


9 9
GB-01

GB-01

GB-01
GB-01
10'-7 "
2
1

GB-02 GB-01 GB-01 GB-01 GB-01 GB-01 GB-01


10 10

STRUCTURAL DRAWING
3 1 3 3 3 3 3 3
5'-9 " 15'-1 " 9'-6 " 9'-6 " 10'-10 " 10'-10 " 10'-10 " 10'-10 "
4 4 4 4 4 4 4 4

INDUSTRIAL BUILDING
83'-8"

at TRICHY
A B B' C C' C'' D E E' E'' F G G' G'' H

GROUND BEAM- DETAILS


(CENTER LINE OF WALLS)
A B C D E F G H
C.S OF ROOF BEAMS
83'-8" BEAM-No AT MID SPAN AT SUPPORT
20'-11" 20'-11"

W
20'-11" 20'-11"
9'' 9''
1 1 2-16# 2-16#
RB-01 RB-03 RB-03 RB-03 RB-03

RB-01
12'-2 "

N
1-12#CKD

S
3

8#@8" C/C - 2L
4

RB-01

1'-3''

1'-3''
1-12#CKD 8#@6" C/C - 2L
2 2

E
Note:
2-16# 2-16#
RB-01

RB-01
12'-2 "

CKD--Cutrod
3
4

9'' 9''
3 3 2-20# 2-20#
1-20#CKD
RB-01

RB-01
12'-2 "

8#@8" C/C - 2L
3
4

RB-02

1'-6''

1'-6''
4 4
1-20#CKD 8#@6" C/C - 2L
Note:
RB-01

RB-01
12'-2 "
3
4

2-20# CKD--Cutrod 2-20#

9'' 9''
5 5 2-16# 2-16#
106'-8 "
2
1

RB-01

RB-01
M/s P RAJAH PRAKASH
12'-2 "

1-16#CKD
3
4

8#@8" C/C - 2L
RB-03

2'-0''

2'-0''
6 6 1-16#CKD 8#@6" C/C - 2L
RB-01

RB-01
12'-2 "
3

Note:
4

2-16# CKD--Cutrod 2-16#

7 7
AS civil Engg services
RB-01

RB-01
12'-2 "
3
4

RB-01 RB-02 RB-02 SCHEDULE OF SLABS :


8 8
S1
SLAB SLAB SLAB REINFORCEMENTS TOP BARS REMARKS
S1
RB-01

RB-01
10'-5 "

RB-02
3
4

No TYPE DEPTH
SHORTER LONGER
RB-02 RB-02 Top extra bars
9 9 @ Supports has to be
S1 S1 S1 TWOWAY 5" 10#@6" C/C 8#@6" C/C 10/8#@12" c/c provided @ free ends
RB-01

RB-01
RB-02
10'-7 "
2
1

If electric condute
conjuction prevails
RB-02 RB-02 * At Roof Top & Toilet Portion add water proof chemical provided 5.5" thick slab
10 10

HATCHED PORTIONS ARE


@ 12' LEVEL STRUCTURAL DRAWING
3 1 3 3 3
5'-9 " 15'-1 " 19'-1 " 21'-9 " 21'-9 "
4 4 4 4 4

INDUSTRIAL BUILDING
83'-8"

at TRICHY
A B C D E F G H

COLUMN MID TIE & GF ROOF BEAM- DETAILS


(CENTER LINE OF WALLS)
1st SUPPORT 2nd SUPPORT
LINTEL BEAM DETAILS
0.25 L1 0.25 L1 SPAN SIZE L.BEAM REINFORCEMENT DETAILS
MIDSPAN
DEPTH

5"
Above all 2 N0s -- 8mm top
0.1L1 0.1 L1 5" X 6" 2L - #6MM @ 6" c/c

6"
4.5" walls
2 N0s -- 8mm Bottom
2L-#8mm@ 8"C/C
2L-#8mm@ 6"C/C SPAN 9"

L/S DETAILS OF GROUND/ROOF BEAM (TYPICAL) 2 N0s -- 8mm top 2L - #6MM @ 6" c/c
2'0"--3'0" 9" X 6"

6"
single span 2 N0s -- 8mm Bottom

9"
M/s P RAJAH PRAKASH
2 N0s -- 8mm top

9" 3'6"--4'6" 9" X 6" 2 N0s -- 8mm Bottom 2L - #6MM @ 6" c/c

6"
- #8MM @ 6" c/c 1 N0s -- 8mm ckd
9"
6" - #6MM @ 6" c/c
9"
#10mm -6 Nos 2" 2 N0s -- 8mm top
AS civil Engg services
5"

4'9"--5'4.5" 9" X 6" 2 N0s -- 8mm Bottom 2L - #6MM @ 6" c/c

6"
2 N0s -- 8mm ckd
2'-9"
9"
CB-01
CONCEALED BEAM DETAILS LOFT--SHADE DETAILS 5'9"--7'0" 9" X 9"
2 N0s -- 10mm top 2L - #6MM @ 6" c/c

9"
2 N0s -- 10mm Bottom
1 N0s -- 10mm ckd
(provide @ all free edges)
9"
2 N0s -- 10mm top
2 N0s -- 10mm Bottom 2L - #6MM @ 6" c/c

9"
>7'0"--9'0" 9" X 9"
1 N0s -- 12mm ckd

STRUCTURAL DRAWING
2nd SUPPORT
1st SUPPORT

0.3 L1 0.3 L1 0.3 L2 0.3 L2 0.3 L3


INDUSTRIAL BUILDING
MIDSPAN 9" 2L- #6MM @ 6" c/c
at TRICHY
DEPTH

2 N0s -- 8mm top

4.5"
2 N0s -- 8mm Bottom
0.1L1 0.15 L1 0.15 L2 0.15 L2 0.15 L3
2L-#8mm@ 8"C/C
2L-#8mm@ 6"C/C
CILL LVL TIE BEAM
SPAN L1 SPAN L2 SPAN L3

L/S DETAILS OF GROUND/ROOF BEAM (TYPICAL)


contineous
GF Roof-slab
0.1
5L
RB-01 DETAILS -Ss
(Second flight)

5" TK. M/s P RAJAH PRAKASH


#8mm - 8" c/c
#10mm - 5" c/c

0.3
L
AS civil Engg services
MID LANDING
LEVEL
CB-01

CB-01 0.3
Mid Landing slab L
STRUCTURAL DRAWING

INDUSTRIAL BUILDING
5" TK.
at TRICHY
#8mm - 8" c/c
#10mm - 5" c/c 0.3
L

DETAILS -Ss
(First flight)

GB-01

You might also like