AC7102 REV.

AUDIT CRITERIA Issue Date 1993-06

161 Thorn Hill Road Revision Date 13-May-2021


Warrendale, PA 15086-7527
Superseding AC7102 Rev. J

Nadcap
AUDIT CRITERIA FOR HEAT TREATING
Baseline

*TO BE USED ON AUDITS STARTING ON OR AFTER 15-Aug-2021*

1. AUDIT REQUIREMENTS

1.1 Prior to the Audit (see OP 1105 – Audit Process)

1.1.1 The Auditee must complete a self-audit to (as applicable):


• AC7000 (If seeking Nadcap accreditation)
• AC7102 (If seeking Heat Treating accreditation)
• AC7102/S (If seeking Subscriber specific accreditation)
• AC7102/1 (If seeking Brazing accreditation)
• AC7102/3 (If seeking Carburizing accreditation)
• AC7102/4 (If seeking Nitriding accreditation)
• AC7102/5 (If Hardness and/or Conductivity testing is used
in support of in-house heat treating)
• AC7102/6 (If seeking HIP accreditation)
• AC7102/7 (If seeking Induction Hardening accreditation)
• AC7102/8 (If seeking Heat Treating accreditation)
• AC7102/9 (if seeking Sintering & Metal Injection Molding
accreditation)
• AC7102/10 (If seeking Localized Heat Treating
accreditation)
• AC7101/3 (If Tensile testing is used in support of in-house
heat treating)
• AC7101/4 (If Metallography and Microindentation testing are
used in support of in-house heat treating)
• AC7110/1 (If seeking Torch and/or Induction Brazing
accreditation

The self-audit (including all applicable job audits for the applicable slash
audit criteria first, and the balance to 10 jobs using AC7102) must be
completed prior to the audit in accordance with the requirements of OP

PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user.”

PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer. (Contact
information is located at http://www.eauditnet.com under “Contact Us”.)

Copyright 2021 Performance Review Institute. All rights reserved.

t-frm-1115 19-Mar-2021
Nadcap AC7102 Revision K -2-

1105 – Audit Process and submitted through eAuditNet.

1.1.2 Were all of the non-conformances identified by the Auditee's self-audit YES NO NA
addressed by their corrective action system prior to this Nadcap audit?

1.1.3 The Auditee must provide the following documents to the Auditor 30
days prior to the audit: (Info)

Guidance: All provided items shall be in English, unless otherwise


agreed upon between the Auditor and the Auditee.
• List of equipment (atmosphere generation, testing equipment,
lab equipment, inspection equipment, plating, coating, cleaning,
Pyrometry, and Pyrometry testing, etc.) (U14)
• List of purchased services, including name(s) of outside provider
for calibration, processing, testing, etc., schedule of calibrations,
uniformity surveys, system accuracy tests, hardness machines
servicing, etc., schedule of periodic tests (tensile,
decarburization, etc.)
• List of Subscriber customers and specifications for which heat
treater is approved
• List of heat treat specifications [military, government, industry
(AMS, etc.) and customer] that Auditee is working to
• Copy of internal general procedures for heat treat processing,
Pyrometry and testing/inspection of heat treated product
(exemption for ITAR and Export Control documents applies)
referenced in the self-audit.
• Organization chart

(All the above documents must be uploaded into the temporary secure
storage location of eAuditNet).

1.2 Definitions and Interpretations

1.2.1 For definitions and interpretations see Heat Treating Task Group Audit
Handbook.

1.2.2 Where a question is designated (Info), the “YES/NO” column indicates


it is asked For Information Only, with no corresponding requirements. A
“NO” answer does not require a nonconformance report or explanation.

1.3 Additional Information for Auditees

1.3.1 In addition to the commodity audit criteria noted herein, there may be
other pertinent data such as audit handbooks, attachments, and
preparatory instructions necessary for the completion of the audit.
These can be found and downloaded from eAuditNet under “Public
Documents”.

1.3.2 Questions marked with (UXX) Codes are applicable to all Auditees.
These Codes indicate that corresponding questions from AC7102/S are
also to be answered "as applicable."
Nadcap AC7102 Revision K -3-

2. AUDITEE INFORMATION

DIVISION (When applicable):

NATURE OF BUSINESS (U14):

IN-HOUSE PRODUCTS ONLY: ACCEPTS OUTSIDE WORK:

TOTAL EMPLOYEES: HEAT TREATING PERSONNEL:

SQUARE FEET OF HT AREA(S): NO. OF SHIFTS WORKED:

ADDITIONAL CONTACTS POSITION EMAIL

COMMENTS:

2.1 Additional Information

Guidance: Ensure that the scope has been reviewed and signed off in
eAuditNet with the Auditee.

2.1.1 Plant Location Changed (Info) YES NO

2.1.2 QC Manager Changed (Info) YES NO

2.1.3 Equipment Moved (Info) YES NO

2.1.4 Common NCRs to Previous Audit (Info) YES NO

2.2 Attachments

2.2.1 Furnace(s) List

2.2.2 GT-193 (for General Electric Aviation)


Nadcap AC7102 Revision K -4-

2.2.3 Staff Report (Generated by the Offline Audit Completion system, or


completed in t-frm-0010 – Closing Meeting Report)

2.2.4 Closing Meeting Sign-off (t-frm-0010- Closing Meeting Report last


page)

2.2.5 Others (as necessary)

3. GENERAL QUALITY SYSTEM – QS+ PURCHASE + MARKETING +


HR

3.1 Document Control

3.1.1 Are the applicable revisions of the appropriate documents available at YES NO
the appropriate workstation?

3.2 Contract Review QA

Contract review format (42CRMO4) Randack Fastners) MFR No &


Dated to be incorporate

3.2.1 Are contracts and incoming purchase orders reviewed to ensure that:
(U22)

3.2.1.1The quality and technical requirements, including any unique customer YES NO
requirements, are adequately defined and documented?

The quality and technical requirements, including any unique customer


requirements, are adequately defined and documented. H&T recipe
doc. No. F290920

3.2.1.2Adequate capability, customer approvals, and resources are in place to YES NO


meet the requirements?

Approved MFR

3.2.1.3Any deviations from the proposal/contract are resolved in writing by YES NO


authorized personnel/customer/Auditee?

As per DOC NO.: 092019, point no. 3 E

3.2.1.4There is adequate definition of the work statement to identify the YES NO NA


specific process(es) to be performed including specification number(s),
applicable Type(s), Class(es), Grade(s), etc.?

Class 4 and class 5 instrumentation type** Grades 42CRMO4. & TDC


no** MDS NO:010- R-03 (NEW) :>63 RD Dated 24.12.2023in Induction
furnace Doc no. .092016 ref pt no. 1

3.2.2 Does the Auditee flow down contractual requirements internally and to YES NO
Nadcap AC7102 Revision K -5-

sub-tier providers?

Material movement No 131504 & as per SAP

3.3 Control of Nonconforming Product

3.3.1 Is the nonconforming material controlled, and the customer notified of YES NO
each instance of nonconforming product in accordance with the
contractual requirements?

As per DocNo. 092016 is the nonconforming material controlled, and


the customer notified of each instance of nonconforming product in
accordance with the contractual requirements as per doc.no. 092019

3.3.2 When reheat treatment is performed: is it allowed by specification, YES NO NA


properly documented, retested, and in compliance with customer
requirements? (U22)

Whenever reheat treatment is performed: is it allowed by specification,


properly documented, retested, and in compliance with customer
requirements. Refer hardness sampling memo number F180920

3.4 Control of Split Orders SECTION NA

Guidance: See definition of “split order” in HTTG Audit Handbook.

3.4.1 Are split orders controlled in accordance with the customer YES NO
requirement?

Accountable in route card format no.F260920

3.4.2 Is there objective evidence that split orders are tested in accordance YES NO
with the customer requirement?

Accountable in route card format no.F260920

3.5 Internal Audits

3.5.1 Are planned and documented internal quality audits performed on a YES NO
scheduled basis by knowledgeable personnel not directly responsible
for the work?

QS office to prepare the plan.

3.5.2 Are all Nadcap elements within the scope of the Auditee’s accreditation YES NO
properly addressed in the internal audit?

3.6 Quality Planning – These requirements must be checked through all job
audits performed.

3.6.1 Is the facility performing heat treatment subject to approval by the YES NO NA
relevant cognizant organization associated with the design authority
before commencing the work, when required?
Nadcap AC7102 Revision K -6-

3.6.2 Is only the heat treating equipment which meets the requirements of YES NO
the applicable specifications for instrumentation and temperature
uniformity used for processing? (U14, U22)

3.6.3 Are specified process times based on the appropriate thickness of the YES NO
hardware or other criteria in accordance with the applicable
specification?

Guidance: See definition of “hardware” in HTTG Audit Handbook.

3.6.4 Are tensile specimens and other test specimens included with YES NO NA
production loads when required? (U22)

3.6.5 Are there procedures that address the use and placement of load YES NO NA
thermocouples when required by specification or customer
requirements? (U14)

3.7 Frozen Planning SECTION NA

3.7.1 When customer approved fixed processes are required, is the Auditee YES NO
working to the latest revision approved by the customer and is the
evidence of this approval on file? (U22)

As per MDS NO:010- R-03 (NEW) :>63 RD

3.7.2 Does an internal procedure address the requirements for fixed YES NO
processes?

As per MDS NO:010- R-03 (NEW) :>63 RD And W.I No 092019

3.7.3 Does any violation of a fixed process requirement lead to review of YES NO
concerned product and customer notification?

As per MDS NO:010- R-03 (NEW) :>63 RD and W.I No 092019

3.8 First Lot Inspection (QA) SECTION NA

3.8.1 Is engineering first lot inspection and approval documented when YES NO
required by the customer?

Yes if required by Customer

3.8.2 Are records maintained for the development of fixturing and racking YES NO
sketches, for first article inspection when required by specification or
customer requirements?

Yes if required by Customer

3.9 Purchasing

3.9.1 Are all facilities used for subcontracted testing and processing YES NO NA
approved by either the customer or Subscriber, as required?
Nadcap AC7102 Revision K -7-

All operations & testings performed in house.

3.9.2 Are consumable goods, such as process atmospheres, quenchants, YES NO


salts, thermocouples, and materials for test samples, ordered and
accepted according to an in-house document or to a specific standard?

QS dept to ensure

3.10 Electronic Program Control and Data AcquisitionElect SECTION NA

3.10.1 Is there a procedure in place to address software control? YES NO

3.10.2 Is there evidence that software used to control and record Heat YES NO
Treatment equipment (programmable controller, electronic charts, etc.),
is compliant with approved procedure?

3.10.3 Are all software revisions verified by first lot inspection to ensure YES NO
compliance with specification requirements?

4. PERSONNEL - HR

4.1 Training

4.1.1 Are there training procedures that assure personnel performing YES NO
contract review, job planning, heat treating, and associated quality and
test functions are competent to perform assigned tasks?

4.1.2 Do records indicate that training is scheduled and attended in YES NO


accordance with procedures and documented?

4.2 Evaluation of Personnel

4.2.1 Do procedures require periodic evaluation to ensure that approved YES NO


personnel maintain proficiency in their assigned heat treating and
related tasks?

4.2.2 Do records indicate that the evaluations are performed at documented YES NO
frequencies and the results reviewed with employees in a program of
continuous improvement of personnel?

5. MATERIAL HANDLING AND TRACEABILITY - PROCESS

5.1 Incoming Material to Processing

5.1.1 Are identification, count and quality discrepancies resolved prior to YES NO
processing hardware?

Incoming material transfer by memo and material packed In bundle to


bundle as per doc no. F0920019 Sr.No.C 3. Refer route card F260920
Nadcap AC7102 Revision K -8-

5.1.2 Do procedures ensure that incoming customer documents remain YES NO


traceable to those specific jobs throughout processing?

Procedures ensure that incoming customer documents remain


traceable to those specific jobs throughout processing as per Recipe
chart & Route card. F260920

5.2 General Cleaning(NA) SECTION NA

5.2.1 When mandatory cleaning requirements are imposed by purchase YES NO NA


order or applicable specification, are they:

(1) Complied with by the heat treater or performed by the customer


prior to and after heat treatment, and (2) Documented? (U11)

5.2.2 Does the job planning have provisions for inspection prior to heat YES NO
treatment when inspection or conditional cleaning is specified in the
applicable specification?

5.2.3 Does the Auditee have a procedure that addresses the cleaning or YES NO
cleanliness inspection of hardware in accordance with the applicable
specification requirements? (U18, U22)

5.2.4 Are procedures in place to provide removal of salt residue from YES NO NA
hardware heated in salt baths?

5.2.5 Do records and observations indicate that the contract review for these YES NO
requirements is effective and the procedure is followed?

5.3 Racks, Fixtures and Baskets SECTION NA

5.3.1 Do procedures require that, when hardware requires a specially YES NO NA


designed fixturing or racking method, the specific fixturing or racking is
used?

5.3.2 Do procedures require the use of appropriate fixture/tool/rack materials YES NO


to prevent interactions between the fixturing/tooling/racking and
hardware materials, which result in undesirable reactions and
eutectics?

5.3.3 Is there a procedure in place and evidence of compliance to the YES NO


procedure for verifying that the fixture, basket or rack do not introduce
FOD (Foreign Object Debris) or contamination or induce mechanical
damage to hardware?

5.3.4 When a protective painting/coating is used on fixtures/racks, is the YES NO NA


integrity of painting/coating inspected and reworked as necessary?

5.3.5 Do procedures specify that racks, fixtures and/or baskets must be free YES NO NA
from entrapped quenchant before being loaded into the furnace?
Nadcap AC7102 Revision K -9-

5.3.6 Do procedures require that the racks/fixtures/baskets are examined for YES NO
integrity, and repaired or scrapped as necessary?

5.3.7 Do records indicate that the procedures are followed? YES NO

5.4 Furnace Loading

5.4.1 Are there internal procedures, racking sketches, or other means to YES NO
ensure that spacing between hardware is adequate for circulation of the
heating medium and coolant/quenchant?

It is an continuous Hardening and Tempering furnace . material end to


end proceed .

5.4.2 Are there internal procedures to preclude loading furnaces with YES NO NA
hardware when the furnace of intended use is hotter than the set
temperature for the process?

Guidance: NA applies to vacuum furnaces.

5.4.3 Do records indicate that the procedures are followed and meet YES NO
industry/customer and specification requirements?

Yes,records indicate that the procedures are followed and meet


industry/customer and specification requirements as doc. No. 181028

5.5 Sampling Plans - QA SECTION NA

5.5.1 Do all Auditee’s heat treating sampling plans contain:

As per Doc. No 092019, refer point no D

5.5.1.1A method to determine the quantity of product to check in the lot? YES NO

As per Doc. No 092019, refer point no D

5.5.1.2Specified frequency and method of sampling? YES NO

As per Doc. No 092019, refer point no D

5.5.1.3When to change to tightened or reduced plans? YES NO NA

As per Doc. No 092019, refer point no D

5.5.2 Are sampling plans approved by the customer, when required? YES NO NA

As per Doc. No 092019, refer point no D

5.5.3 Is there documented training in the use of the sampling plan which YES NO
Nadcap AC7102 Revision K - 10 -

includes sample size and selection, reduced and tightened plans, and
when to implement them?

Sampling plan training record to be 180920

5.5.4 Does a sampling of jobs where sample inspection is permitted indicate YES NO
that customer requirements have been flowed down correctly to the
inspector or delegated operator and are met?

As per Doc. No 092019, refer point no D

5.6 Process Verification - QA

5.6.1 Is each heat treatment cycle reviewed for job traceability, correct YES NO
temperature, time at temperature and all other related parameters?
(U7, U11, U14, U22)

As per Route Card F260920 and H&T recipe doc. No. F290920 and
As per Doc. No 092019, refer point no10

5.6.2 Is this review performed by Quality Assurance, other designated YES NO


personnel, or self-inspected by the automated computer control and
monitoring system?

Guidance: See the HTTG Audit Handbook (U7, U11)

As per Route Card F260920 and H&T recipe doc. No. F290920 and
As per Doc. No 092019, refer point no10

5.6.3 Is the review documented per the internal procedure? YES NO

As per Route Card F260920 and H&T recipe doc. No. F290920 As
per Doc. No 092019, refer point no10

5.6.3.1Does the data manually recorded match the actual data recorded on YES NO NA
the chart recorder?

Data manually recorded in Logbook Format no. F190920 & actual data
recorded in SCADA

5.6.4 Is the review documented in accordance with the customer YES NO NA


requirements? (U11)

Guidance: NA applies when there are no specific customer


requirements.

5.6.5 Are the acceptance status and any test data recorded only after the YES NO
operation for that job has been completed?

6. PROCESS CONTROL TESTING - QA

6.1 Does the Auditee have procedures or other documentation in place that YES NO
Nadcap AC7102 Revision K - 11 -

addresses all required Heat Treat process control testing? (See Heat
Treating Audit Handbook)

Hardness Testing,

6.2 Do the procedures or other documentation contain or reference the


following information:

6.2.1 All applicable specifications when testing is specified? (See section 3.2) YES NO NA

Hardness Testing,

6.2.2 All qualification, periodic, and lot/batch acceptance testing as required YES NO
by specifications?

W.I Ref. No 092019 & TDC MDS NO:010- R-03 (NEW) :>63 RD

6.2.3 A schedule for the completion of periodic tests? YES NO

Indirect verification of hardness testing.

6.2.4 Documentation that tests were performed per the schedule? YES NO

6.3 Auditor is to select a minimum of 4 periodic tests (excluding Pyrometry, SECTION NA


Hardness, and Conductivity) consisting of internal or external tests
(including requirements, frequency, actual results, compliance, etc.)
from the Auditee’s Process Control System and evaluate them against
the applicable specification requirements, including interval and test
method. Two of these verifications may be selected as part of the Job
Audits or they may all be selected separately.

6.3.1 (EC) Test 1: YES NO

6.3.2 (EC) Test 2: YES NO

6.3.3 (EC) Test 3: YES NO

6.3.4 (EC) Test 4: YES NO

6.4 Hardness and/or Conductivity Testing

(INFO) For information only, does the Auditee perform in-house YES NO
hardness testing?

.
Nadcap AC7102 Revision K - 12 -

If the Auditee performs in-house hardness testing for acceptance of


product or process control of the heat treatment process, Nadcap
AC7102/5 Audit Criteria shall be executed, unless the Auditee is
accredited by Nadcap Materials Testing Laboratories Task Group to
AC7101/5 Audit Criteria.

6.4.1 The following questions apply when the Auditee is accredited by SECTION NA
Nadcap Materials Testing Laboratories Task Group to AC7101/5:

6.4.1.1 Is hardness equipment capable of performing the tests in accordance YES NO


with all applicable requirements?

6.4.1.1Is the equipment, base and support designed such that no rocking or YES NO
lateral movement occurs while load is being applied or removed?

6.4.1.2Does the Auditee have a maintenance plan in place? YES NO

6.4.1.3Is there objective evidence that the maintenance plan is followed? YES NO

6.4.1.4Are calibration records available? YES NO

6.4.1.5Do records show that calibration is traceable to national standards YES NO


(AIST, NIST, UKAS, PTB, etc.)?

6.4.1.6Is calibration performed in accordance with applicable requirements? YES NO


(U11)

6.4.1.7Is the number of indentations on standard blocks relatively the same or YES NO
more than those reported for periodic verifications?

6.4.1.8Are alternative methods used only when permitted by one of the YES NO NA
following? (Check all that apply)

6.4.1.8.1 Material Specification

6.4.1.8.2 Customer

6.4.1.8.3 Other (as described below):

6.4.1.9If portable hardness testers are used, is the use of portable hardness YES NO NA
testers approved by the customers?

6.4.1.10
Do test reports show the hardness values and appropriate scale per YES NO NA
customer requirements?
Nadcap AC7102 Revision K - 13 -

6.4.1.11
If conditions are other than normal operating conditions (ball YES NO NA
diameter/load/load time/etc.), are those conditions reported as
required?

6.4.1.12
Are the actual hardness values recorded as required? YES NO

6.4.1.13
Is test temperature reported if ambient temperature was outside of 10° - YES NO NA
35°C (50° - 95°F) (unless it has been shown not to affect the
measurement result)?

6.4.2 (INFO) For information only, does the Auditee perform in-house YES NO
conductivity testing?

If the Auditee performs in-house conductivity testing for acceptance of


product or process control of the heat treatment process, Nadcap
AC7102/5 Audit Criteria shall be executed.

6.5 Metallography/Microhardness

6.5.1 (INFO) For information only, does the Auditee perform in-house YES NO
metallography and microhardness testing? (U18)

If the Auditee performs in-house metallography/microhardness testing


for acceptance of product or process control of the heat treatment
process, Nadcap AC7101/4 Audit Criteria shall be executed, unless the
Auditee is accredited by Nadcap Materials Testing Laboratories Task
Group to AC7101/4 Audit Criteria, or the Subscriber does not require
Nadcap accreditation.

6.5.2 The following questions apply when AC7101/4 is executed as part of SECTION NA
this audit:

6.5.2.1Does the Auditee have a system of statistical metrics (Round Robin) in YES NO NA
place that demonstrates proficiency in Metallography/Microhardness
across the machines and test personnel employed, and is conducted at
an interval not to exceed every two years?

Guidance: NA is only applicable to metallographic testing without


measurable results.

Guidance: AC7101/4 is a supplemental Audit Criteria to AC7101/1.


Some requirements in AC7101/1 might be applicable (i.e. Round
Robin).

6.5.2.2Is there objective evidence that the Round Robin plan is followed? YES NO NA

6.6 Mechanical Testing


Nadcap AC7102 Revision K - 14 -

6.6.1 (INFO) For information only, does the Auditee perform in-house YES NO
mechanical testing? (U11)

If the Auditee performs in-house mechanical testing for acceptance of


product or process control of the heat treatment process, Nadcap
AC7101/3 Audit Criteria shall be executed, unless accredited by
Nadcap Materials Testing Laboratories Task Group to AC7101/3 Audit
Criteria.

6.6.2 The following questions apply when AC7101/3 is executed as part of SECTION NA
this audit:

6.6.2.1Does the Auditee have a system of statistical metrics (Round Robin) in YES NO
place that demonstrates proficiency in Mechanical Testing across the
machines and test personnel employed, and is conducted at an interval
not to exceed every two years?

Guidance: AC7101/3 is a supplemental Audit Criteria to AC7101/1.


Some requirements in AC7101/1 might be applicable.

6.6.2.2Is there objective evidence that the Round Robin plan is followed? YES NO

6.7 Preparation of Mechanical Test Specimens

6.7.1 (INFO) For information only, does the Auditee prepare the specimens YES NO
for the mechanical testing?

Guidance: Please see AC7101/7 for compliance, when applicable.

7. FURNACE CONTROL AND MAINTENANCE – MECHANICAL AND


ELECTRICAL

7.1 Furnace Document Control

7.1.1 Operating Instructions

7.1.1.1Are the current operating manuals or instructions available to furnace YES NO


operators, maintenance personnel and other personnel requiring the
information? (U25)

Current operating manuals or instructions available to furnace


operators, maintenance personnel and other personnel requiring the
information on WI for induction H&T furnace doc. no.092019 including
Anx-1 & Anx-2.

7.1.2 Heating and Cooling Parameters (U14)

7.1.2.1Does the internal procedure specify the method for determining heat-up YES NO
rate, start of soaking time, end of soaking time and cooling rate? (U14)

NA it is continuous Induction H&T furnace only data feeding in HMI as


Nadcap AC7102 Revision K - 15 -

per recipe doc. No. F290920

7.1.2.2Do records on the furnace chart or furnace log indicate compliance to YES NO
the above procedure and customer requirements?

As per WI for Induction H&T doc. No. 092019 and recipe for Ind.H&T
doc. No. F290920

7.2 Maintenance

7.2.1 Are all components of each furnace that can affect the functionality YES NO
inspected and maintained in accordance with a documented
preventative maintenance schedule? (U3)

7.2.2 Do records indicate that the inspection and maintenance have been YES NO
performed in accordance with the schedule?

7.3 Control of the Heating Environment SECTION NA

7.3.1 Does the internal procedure specify how atmospheres are to be YES NO
controlled and monitored to ensure conformance to the requirements?

7.3.2 Do records indicate that the procedure is followed? YES NO

7.4 Metering SECTION NA

7.4.1 Are the flow meters operational and appropriate for the gas and flow YES NO
rates used?

flow meters operational and appropriate for flow rates used for water .

Ref. Doc. No. 092019 sr. no. C8A

7.4.2 Do the inspection and maintenance schedule include periodic checks of YES NO
flow meters to ensure that they are functioning? (Ele)

***

7.4.3 Does the internal procedure address the safety shut-off valves and the YES NO
emergency gas purges? (NA)

7.5 Purging (NA) SECTION NA

7.5.1 When the atmosphere is changed, is the furnace purged in accordance YES NO
with an internal procedure that assures elimination of the effects of
previous atmosphere?

7.5.2 Do records indicate that the procedure is followed? YES NO

7.6 Quench System SECTION NA

7.6.1 Are the quench mechanisms operational and capable of meeting YES NO
maximum quench delay provisions of the specifications? (U14)
Nadcap AC7102 Revision K - 16 -

Quench mechanisms operational and capable of meeting maximum


quench delay provisions of the requirements. The furnace is equipped
with in-line fully automated quenching system. No time delay, product
move ahead continuously. WI 092019 (C-8)

7.6.2 Are quench systems capable of achieving the temperature YES NO


requirements at the initiation of the quench, during the quench and at
the end of the quench?

Yes .quench systems capable of achieving the temperature


requirements at the initiation of the quench, during the quench and at
the end of the quench as per doc. No.WI092019 (8-C)

7.7 Quenchant Maintenance SECTION NA

7.7.1 Does the internal procedure specify that quenchant temperatures are to YES NO
be controlled and documented?

Internal procedure specify that quenchant temperatures are to be


controlled and documented

As per WI for Induction H&T furnace doc. No. 092019 sr. No.C 8 C

7.7.2 Is all temperature recording and controlling equipment calibrated? YES NO

all temperature recording in HMI and controlling equipments are


calibrated Elect

7.7.3 Do quenchant agitation and/or agitation of the product during YES NO


quenching conform to the applicable specifications?

The furnace is equipped with in-line spray nozzle type fully automated
quenching system. It is closed loop system & agitation not required
here.

7.8 Polymer Quenchants(NA) SECTION NA

7.8.1 Is there a system in place that ensures polymer quenching is only used YES NO
when permitted by the particular specification for the alloy and metal
thickness?

7.8.2 Do procedures define the polymer concentration in accordance with the YES NO
requirements?

7.8.3 Do the records indicate compliance? YES NO

7.8.4 Do procedures specify the frequency and methods for determining the YES NO
polymer concentration in accordance with the requirements?

7.9 Water/Polymer Quenchant used in conjunction with the Salt Baths SECTION NA
Nadcap AC7102 Revision K - 17 -

7.9.1 Do the records show that the contamination does not exceed 6% YES NO
and/or other requirement defined in applicable customers’
specifications?

7.10 Quench Effectiveness SECTION NA

7.10.1 Do procedures specify the frequency and methods for the testing of YES NO
quenchants in accordance with all customer requirements?

Yes procedures specify the frequency and methods for the testing of
quenchants in accordance with all customer requirements, refer doc no
092019 point no 8.0

7.10.2 Do the records indicate that quenchant effectiveness meets the YES NO
specifications’ requirements?

Yes procedures specify the frequency and methods for the testing of
quenchants in accordance with all customer requirements, refer doc no
092019 point no 8.0 (8-C)

7.10.3 If the quench media differs from the requirements of the applicable YES NO NA
specifications, is there a qualification test in place that substantiates its
equivalence?

7.10.3.1
Has the use of different quenchants and related qualification tests been YES NO NA
approved by the customer, when required?

7.10.4 Does the Auditee have procedures that address qualification and re- YES NO
qualification requirements to industry and/or customer specifications?

Process validation procedure no. 020305

7.10.4.1
Is there objective evidence of compliance with these qualification and YES NO
re-qualification requirements?

Process validation Doc. no.030203 Dated *

7.11 Fasteners(NA) SECTION NA

7.11.1 Is there a system in place to ensure that the fasteners are only YES NO
processed in qualified containers to approved procedures and
customer requirements, or, when qualified, in a continuous furnace?

7.11.2 Do procedures address the customers’ requirements for special YES NO NA


handling of the fasteners after quenching?

7.12 Plating(NA) SECTION NA

Guidance: For purposes of this section, plating is limited to the plating


operations utilized for temporary masking or other operations for
successful heat treatment or brazing. This is not intended to replace
Nadcap AC7102 Revision K - 18 -

plating for finishing purposes as controlled by Chemical Processing


Task Group.

Guidance: If the Auditee has a current Nadcap Chemical Processing


accreditation that includes both plating and stripping, questions 7.12.1
through 7.12.7.2 are YES unless otherwise noted as part of an NCR
found during a job audit.

7.12.1 Does a general or hardware-specific documented procedure define the YES NO


following:

7.12.1.1
In-process cleaning methods, water break free check? YES NO

7.12.1.2
Etching?(NA) YES NO NA

7.12.1.3
Strike/Activation, including temperature, time, current (as applicable)? YES NO

7.12.1.4
Post-process cleaning methods? YES NO

7.12.1.5
The specified plate thickness and method(s) of its measurement? YES NO

7.12.1.6
Any required treatment for preventing hydrogen embrittlement? YES NO

7.12.2 Fixturing, racking, masking(NA) SECTION NA

7.12.2.1
Are the fixtures, racks and masking materials defined and identified? YES NO

7.12.2.2
Do fixtures and masking prevent the entrapment of air or process YES NO
solutions, and protect hardware from corrosion and unwanted
coverage?

7.12.2.3
Does the fixturing and racking facilitate solution neutralization and YES NO
removal during rinsing, and minimize solution and rinse water drag-out
and cross contamination of process tanks?

7.12.2.4
Do the fixturing, racking, electric circuit design and lifting equipment YES NO
preclude mechanical damage or electrical arcing?

7.12.3 Processing tanks(NA) SECTION NA

7.12.3.1
Are processing tanks identifiable for their contents and specified YES NO
temperature ranges?

7.12.3.2
Are the tanks with specified temperature ranges operating within those YES NO
ranges at the time of processing?

7.12.3.3
Are tanks of sufficient volume and dimensions to contain hardware YES NO
Nadcap AC7102 Revision K - 19 -

during processing and assure sufficient coverage of hardware?

7.12.3.4
Are tanks that require uniform temperature and solution concentration YES NO
agitated?

7.12.3.5
Are tanks for electrolytic coatings equipped and configured to promote YES NO
the required uniform deposition rate?

7.12.4 Are anodes controlled and specific to each process solution to avoid YES NO
cross contamination?

7.12.5 Are equipment and solutions in compliance with applicable customer YES NO
requirements?

7.12.6 Do the records show that the specified thickness of plate is achieved? YES NO

7.12.7 Stripping(NA) SECTION NA

7.12.7.1
Are the methods and materials for removal of plating as specified or YES NO
approved by the customer?

7.12.7.2
Do stripping procedures include an inspection of the stripped YES NO
component following the strip operation?

8. ALUMINUM ALLOYS TREATING(NA) SECTION NA

8.1 Control of Heating Environment Above 400˚F (204˚C) SECTION NA

8.1.1 Do procedures address protection of hardware from the potential of YES NO


damaging effects of the heat treat environment?

8.1.1.1Are the furnaces used for solution heat treating, annealing or stress YES NO NA
relieving designed and operated such that products of combustion that
could contaminate the load do not enter the heat-treating furnaces
when required by specification?

8.1.1.2When required, is there a procedure that includes the use of protective YES NO NA
compounds (ammonium or sodium fluoroborate, or other equivalent
moisture reducing compound)?

8.1.1.3Are there records indicating that the procedure is followed? YES NO NA

8.1.2 When specified, are all periodic metallographic tests in compliance with YES NO NA
requirements?

8.2 Salt Baths(NA) SECTION NA

8.2.1 Is the grade of salt compliant with applicable material and heat treating YES NO NA
process specification requirements?

8.2.2 Do the records indicate that each salt bath is tested periodically for pH YES NO NA
Nadcap AC7102 Revision K - 20 -

in accordance with the applicable heat treating specification?

8.3 Refrigeration(NA) SECTION NA

8.3.1 Do procedures address cooling requirements after quench? YES NO

8.3.2 Are there records to show that cooling after quench is in compliance YES NO
with customer requirements specified in procedures or shop planning?

8.3.3 Do procedures specify the requirements for time/temperature limits for YES NO
retention of the “as quenched” condition?

8.3.4 Do procedures address the recording of the temperature in each YES NO


refrigeration or cold storage unit?

8.3.5 Do the records indicate that the procedures are followed? YES NO

8.4 Solution heat treating furnaces with the heat source in walls SECTION NA

8.4.1 Are radiant tubes and/or electric heating elements shielded or YES NO
positioned to prevent the radiation heating of hardware?

8.4.2 Are the radiation tests made in accordance with AMS2750 prior to initial YES NO
production use and after any repair or adjustments that might alter
radiation characteristics?

9. MAGNESIUM ALLOYS TREATING (NA) SECTION NA

9.1 Facilities/Equipment

9.1.1 Are electrical heating elements and radiant tubes shielded to prevent YES NO NA
direct radiation from striking any production hardware?

9.1.2 When heat treating above 750°F (399°C), is there a protective YES NO NA
atmosphere containing sufficient sulfur dioxide, carbon dioxide, or
satisfactory oxidation inhibitor used to prevent oxidation?

9.1.3 Does the soaking time start when all temperature control sensing YES NO
elements are within uniformity range of the set or offset temperature?

9.1.4 Is the quench delay 30 seconds or less (except otherwise approved by YES NO
the cognizant quality assurance organization associated with the
design authority)?

9.1.5 Is the quenchant agitated during the quench (except otherwise YES NO
approved by the cognizant quality assurance organization associated
with the design authority)?

9.1.6 Is hardware kept in quenchant for at least 2 minutes, or at least 2 YES NO


minutes per inch or fraction thereof (or other customers' requirements)?

9.2 When specified, are all periodic metallographic tests in compliance with YES NO NA
Nadcap AC7102 Revision K - 21 -

requirements?

10. COPPER-BERYLLIUM (Cu-Be) & COPPER ALLOYS TREATING SECTION NA


(NA)

10.1 Facilities/Equipment

10.1.1 If fuel-fired furnaces are available for use in the facility, are there YES NO NA
procedures in place to assure that fuel-fired furnaces are of the muffled
type if used for solution heat treating of Cu-Be alloys in an air
atmosphere?

10.1.2 If still air oven type furnaces are available for use in the facility are YES NO NA
there procedures in place that preclude their use for age hardening of
Cu-Be alloys?

10.1.3 When specified for bright luster hardware, are there procedures in YES NO NA
place to either provide subsequent brightening operations to remove
oxides, stains and tarnishes that are not detrimental to the finished
hardware or to conduct a ‘bright hardening’ heat treatment utilizing non-
oxidizing and non-combustible atmosphere in a chamber-type furnace?

10.1.4 Are bright hardening procedures in place that require the control of YES NO NA
atmosphere flow rate and dew point as needed to provide the required
finish?

10.2 Salt Baths SECTION NA

10.2.1 If salt bath furnaces are available for use in the facility, are there YES NO
procedures in place that preclude their use for the solution heat treating
of Cu-Be alloys?

10.2.2 Are procedures in place requiring that the salt bath be inspected at YES NO
least once each month to determine the presence of objectionable
contaminants which attack the material and that replenishment or
replacement of the entire bath is made, as required?

10.2.3 Are procedures in place and appropriate equipment provided to assure YES NO
removal of all salt from hardware and with sufficient inflow of fresh
water to prevent concentration of dissolved salts in the rinse?

10.2.4 When required, are neutralizing baths provided to remove all active salt YES NO NA
residues from hardware?

11. NICKEL & COBALT ALLOYS TREATING(NA) SECTION NA

11.1 Facilities/Equipment

11.1.1 Does an internal procedure specify when an atmosphere (including air YES NO
or vacuum) has to be used in accordance with any applicable
specifications?
Nadcap AC7102 Revision K - 22 -

11.1.1.1
Do records indicate that the procedure is followed? YES NO

11.1.2 When applicable, does an internal procedure forbid the use of salt YES NO NA
baths and exothermic atmosphere except otherwise stated by the
cognizant quality assurance organization associated with the design
authority for non-age hardening alloys?

11.1.2.1
Do records indicate that the procedure is followed? YES NO NA

11.1.3 Unless authorized by any applicable specification, do vacuum furnaces YES NO NA


equipped with load thermocouples use those load thermocouples to
determine the start of soaking time?

11.1.3.1
When load thermocouples are not used, were tests performed in order YES NO NA
to establish the heat-up time for the load?

11.1.4 When required by any applicable specification, for continuous furnaces, YES NO NA
is TUS test performed with a representative production load conditions
(weight and traverse speed) and instrumented by load sensors?

11.1.5 When applicable, do leak rate results meet 20 microns per hour, or YES NO NA
other criteria required by any applicable specification?

11.1.6 Do procedures define the quenchant temperature range in accordance YES NO NA


with the requirements?

Guidance: The question does not apply to gas quenching.

11.1.6.1 YES NO NA
Do records indicate that the procedures are followed?

11.1.7 When required by any applicable specification or defined in a fixed YES NO NA


process, is the quench delay recorded for each heat treatment batch?

11.2 Surface Contamination SECTION NA

Guidance: Applicable for hardware having finished surface or


insufficient material removal by subsequent machining operation.

11.2.1 Does the internal testing procedure conform to the specifications? YES NO

11.2.2 Does the internal testing procedure cover the following:

11.2.2.1 YES NO NA
Abnormal surface discoloration?

11.2.2.2 YES NO NA
Carburization?

11.2.2.3 YES NO NA
Sulfidation?
Nadcap AC7102 Revision K - 23 -

11.2.2.4 YES NO NA
Nitriding?

11.2.2.5 YES NO NA
Intergranular oxidation?

12. STEELS HEAT TREATING (NA) SECTION NA

12.1 Facilities/Equipment

12.1.1 Does the internal procedure require protection of hardware from YES NO NA
corrosion during processing and storage?

12.1.2 Do records indicate that this procedure is followed? YES NO NA

12.1.3 Is there a procedure that assures reactive atmospheres are properly YES NO NA
purged prior to heating hardware when prior atmosphere can have a
deleterious effect on hardware to be processed?

12.1.4 Do records indicate that this procedure is followed? YES NO NA

12.2 Corrosion Resistant Steels Cleaning and Handling SECTION NA

12.2.1 Does the internal procedure require that all PH steel hardware with any YES NO
finish machined surfaces be handled with clean gloves after cleaning?
(U11)

12.2.2 Do records and observations indicate that the procedure is followed? YES NO

12.3 Neutral Salt Baths(NA) SECTION NA

12.3.1 Is each salt bath tested periodically in accordance with the applicable YES NO
heat treatment specifications?

12.3.2 Do the salt bath test results demonstrate conformance to carburization, YES NO
decarburization, nitriding, and intergranular attack requirements?

12.3.3 Is there an internal procedure for these tests? YES NO

12.3.4 Do records indicate that the procedure is followed? YES NO

12.3.5 Do procedures require that the quench bath be monitored weekly? YES NO

12.3.5.1
Do procedures require salt concentration in the bath to be less than or YES NO
equal to 2% for a water quench or less than or equal to 6% for polymer
quench?

12.3.5.2
Do records indicate that the procedures are followed? YES NO

12.3.6 Do procedures require that hardware be cleaned of any residual salt YES NO
after quenching?
Nadcap AC7102 Revision K - 24 -

12.4 Refrigeration and sub-zero treatments(NA) SECTION NA

12.4.1 Do procedures cover sub-ambient/sub-zero cooling according to the YES NO


customer requirements, or in absence of customer requirements, does
the auditee have a default procedure?

12.4.2 Do procedures and job planning specify time/temperature limits for sub- YES NO
ambient/sub-zero treatments?

12.4.3 Do records indicate that the procedures are followed? YES NO

12.5 Carbon Controls for Steels (NA) SECTION NA

12.5.1 Do the internal procedures specify a system of maintenance and YES NO


calibration of carbon control indicators?

12.5.2 Do records indicate that the maintenance and calibrations are YES NO
performed as required by the procedures and applicable specifications?

12.5.3 Is the accuracy of the carbon control system confirmed by the results of YES NO
tests required by the heat treatment specifications?

12.6 Snap Temper(NA) SECTION NA

12.6.1 Are there procedures that address snap tempering within the time limits YES NO
required by the customers’ specifications? (U11)

12.7 Press Quench (NA) SECTION NA

12.7.1 Are the expander pressure, the cylinder pressure, and the number and YES NO
force of hold down springs, and applicable tolerances documented on
or traceable to the traveler for each job?

12.8 Mechanical Testing SECTION NA

12.8.1 Are there procedures that address mechanical testing required by the YES NO
customers’ specifications?

12.8.2 Do records indicate that this procedure is followed? YES NO

12.9 Surface Contamination Testing SECTION NA

12.9.1 Do the internal testing procedures conform to the specifications? YES NO

12.9.2 Do the internal testing procedures cover the following:

12.9.2.1
Partial decarburization? YES NO NA

12.9.2.2
Total decarburization? YES NO NA

12.9.2.3
Carburization? YES NO NA
Nadcap AC7102 Revision K - 25 -

12.9.2.4
IGO/IGA (Inter Granular Oxidation/Inter Granular Attack) test? YES NO NA

12.9.3 Is there a system in place to ensure that decarburization tests are YES NO NA
performed at the proper frequency, whether it is periodic or with the
load? (U11)

12.9.4 Are the test records current and complete? YES NO NA

13. TITANIUM TREATING (NA) SECTION NA

13.1 Facilities/Equipment

13.1.1 Do procedures address the use of getter materials when required by YES NO NA
specifications?

13.1.2 When getter materials are used, do procedures address the lifespan or YES NO NA
checks to assure that the getter material is still absorbing
contaminants?

13.1.3 Do procedures address atmosphere purge when endothermic or YES NO NA


disassociated ammonia is to be used in a furnace above 1200°F
(649°C) prior to processing titanium hardware?

13.1.4 Do records and observations indicate that the procedure is followed? YES NO NA

13.2 Cleaning and Handling SECTION NA

13.2.1 Does the internal procedure for cleaning titanium surfaces preclude the YES NO
use of halogenated substances or other prohibited materials?

13.2.2 Does the internal procedure require that all titanium hardware cleaned YES NO NA
either by the Auditee or the customer prior to heat treatment are
handled with clean gloves after cleaning?

13.2.3 Do records and observations indicate that the procedure is followed? YES NO

13.3 Processing

13.3.1 Do procedures preclude the use of fixturing that may contaminate YES NO NA
titanium alloys (i.e., Graphite)?

Guidance: NA applies to hardware with sufficient material on all


surfaces for complete removal of contamination.

13.3.2 Do procedures limit the use of air atmosphere above 1000°F (538°C), YES NO NA
unless there is subsequent sufficient stock removal, or allowed by
specification?

13.3.3 When processing is performed in Argon or Helium atmospheres, is the YES NO NA


Nadcap AC7102 Revision K - 26 -

dew point and purity within specification limits?

13.3.4 Does the inert atmosphere or quench gas used (when processing in a YES NO NA
vacuum furnace) meet the required purity requirements?

13.4 Testing SECTION NA

13.4.1 Is there a system in place to control the test coupons and their use YES NO NA
when required?

13.4.2 Does the internal documentation support that the test coupons are YES NO
used in accordance with the procedures/specifications?

13.4.3 Is there a system in place and adequate procedures for the control of YES NO NA
hydrogen pick up that meets the method and frequency specified by the
customers’ requirements?

13.4.4 Is there a procedure for periodic testing for alpha case determination in YES NO
heat treatment of titanium alloys?

13.4.4.1
Is there evidence of compliance to the procedure? YES NO

14. PYROMETRY TESTING - ELECTRICAL

14.1 The Auditor shall execute Nadcap AC7102/8 Audit Criteria as part of
this audit.

15. VACUUM TREATING (EXCEPT VACUUM CARBURIZING – SEE SECTION NA


AC7102/3)

15.1 Procedures

15.1.1 Does the internal procedure or other documentation specify cleaning of YES NO
hardware, tooling and baskets by methods and with materials that
ensure freedom from contamination during vacuum heat treating?

15.1.2 Does the internal procedure, photographic evidence, or other YES NO


documentation specify placement of load thermocouples, racking of
hardware, and furnace loading? (U22)

15.2 Tests and Records

15.2.1 Does the internal procedure control the following:

15.2.1.1
Leak-up rate test? (U7, U10, U14) YES NO

15.2.1.2
Calibration of vacuum instruments, flowmeters, dew point meter(s) and YES NO
the related master gauges as appropriate? (U7, U10, U14)

15.2.1.3
Quench, partial pressure and backfill gas purity and/or dew point (i.e., YES NO
Nadcap AC7102 Revision K - 27 -

does the gas certification meet specification requirements)?

15.2.1.4
Furnace burn-out? YES NO

15.2.2 Is the dew point of the gas periodically checked as the gas enters the YES NO
furnace?

15.2.3 Does the calibration interval of the vacuum system’s sensor, control YES NO
panel and recorder meet the frequency of the customer specification?

15.2.4 Are calibration acceptance criteria defined in the internal procedure? YES NO

15.2.5 Do records indicate that the tests and calibrations are performed as YES NO
required by the internal procedure and all applicable specifications?
(U25)

15.2.6 Is the vacuum level in the heating and cooling chambers recorded YES NO
during all thermal cycles requiring vacuum? (U10, U14)

15.3 Qualification for Inert Gas Pressure Quenching (U11) SECTION NA

15.3.1 Does the Auditee have documentation of customer or cognizant quality YES NO NA
assurance organization associated with the design authority approval,
as applicable, when required?

15.3.2 Does the Auditee have procedures that address the applicable YES NO
qualification and requalification requirements that meet industry or
customer specifications?

15.3.3 Does the Auditee’s technique sheet meet the requirements of the YES NO
applicable industry or customer specifications?

16. TO 17. COMPLIANCE AUDITS OF COMPLETED HEAT TREATING JOBS -


PROCESS

The Auditor shall execute two (2) completed long job audits (including
final testing), except when completed job audit is replaced by an equal
amount of other processing jobs (see AC7102/1, AC7102/3, AC7102/4,
AC7102/6, AC7102/7 and AC7102/9) performed in conjunction with
AC7102 Audit Criteria.

Further checklist AC7102/7 being used


Nadcap AC7102 Revision K - 28 -

16. COMPLIANCE AUDIT OF COMPLETED HEAT TREATING JOB SECTION NA

16.1 (EC) Job #1 Identity: P. O. 205442 Batch no. 39845 YL

16.1.1 Purchase order number: (for Independent Heat Treaters Only)

16.1.2 Customer: Randack Fastner

16.1.3 Subscriber:

16.1.4 Job number: Heat Number(Batch No)39845 YL

16.1.4.1(Info) Is the job a split job? YES NO

16.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

16.1.5 Part Number: Unknown

Guidance: If Part Number is not available mark as “Unknown”.

16.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

16.1.6 Hardware description: 42CRMO4

16.1.7 Hardware size: 35MM

16.1.8 Maximum hardware thickness: 35 MM

16.1.9 Quantity of hardware: No. Of pieces 429 ( Qty. 18.094Mt)


Medium carbon Steel
16.1.10 (EC) Material alloy:
As rolled material
16.1.11 (EC) Material condition/form:

16.1.11.1
(EC) Clad

16.1.11.2
(EC) Bare

16.1.12 (EC) Material specification (if Medium Carbon Steel S45cs1 -


Nadcap AC7102 Revision K - 29 -

available): QDS

16.1.13 (EC) Heat Treating specification: Continuous Induction hardenning


and Tempering Furnace (15 mm-
100MM5)

16.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval):
As per TDC****

16.1.15 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

16.1.16 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.
Continuous Induction Hardening and Tempering Furnace WI 092019

16.1.17 When the heat treating specification has cleaning requirements prior to YES NO NA
or after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

16.2 Does the job planning contain all of the applicable items described
below?

16.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

As per recipe for Induction H&T furnace as per doc. No. 092019.

16.2.2 YES NO
Soak times and tolerances?

It is an continuous induction H&T furnace

16.2.3 Soak temperatures and tolerances? YES NO

It is an continuous induction H&T furnace.

16.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

As per WI for induction H&T furnace Doc. No. 092019 .Sr. No. C-8C

16.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.


Nadcap AC7102 Revision K - 30 -

16.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Instrumentation Type)?

For Ind. Post Hardenning Class 5 And Tempering Furnace Class4

16.2.7 Instrumentation Type D

16.2.8 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

As per WI for Induction H&T furnace doc. No. 092019 sr. No. D 1.0,2.0

16.2.9 Any changes, additions, and deletions are made by authorized YES NO
personnel?

QA Authorisation

16.2.10 Place to record inspection status? YES NO

Yes , As per Route card format no. F260920

16.2.11 Place to record test requirements and results? YES NO

Yes, Record for test requirement and result as per Doc . No. F180920

16.2.12 Place to record identification of person(s) doing the work? YES NO

Yes

16.2.13 Place to record date operation was performed? YES NO

Record date operation was performed on log book doc no. F190920

16.3 Racking – Process – Loading pattern – Drg. Methodology. – Racking SECTION NA


media maint.

16.3.1 Are customer racking or batching requirements specified? YES NO NA


Describe: (EC) Do not describe but answer YES or NO

Yes, Batching requirement specified. On Shop Doc no. F180920 and


F190920

16.3.2 Is racking or batching specified as requirement on the shop paper? YES NO


Describe: (EC) Do not describe but answer YES or NO
Yes , Batching specified as requirement on the shop paper F 180920
and F190920

16.3.3 Is the racking or batching used in accordance to requirements? YES NO


Describe: (EC) Do not describe but answer YES or NO

batching used in accordance to requirements as per Recipe of Ind. H&T


Nadcap AC7102 Revision K - 31 -

furnace

16.3.4 Did racking ensure that air is not entrapped detrimentally during the YES NO NA
quench?

16.4 Thermal Treatment Step One SECTION NA

16.4.1 Step One:

16.4.1.1Furnace Used: For Induction Hardening

16.4.1.2Date hardware was Batch no. 39845 YL


processed:

16.4.1.3Operator who ran the job: Ajay Ilame

16.4.1.4Simulated or Real job: Real Job

16.4.2 (EC) Step One - Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 861-889 (EC) 861-889 (EC) 875 Deg
Deg C Deg C C
Temperature
+/-14 +/-14
Deg c Deg c
Check if used
Control (EC) 875 Deg C

Recorder (EC) 880 Deg C


High/Low - Type (EC) NA
A or C
Instrumentation
Load (EC) NA
Thermocouples

16.4.3 (EC) Step One – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Atmosphere

Heat-up Rate (EC) NA (EC) NA (EC) NA

Time and Tolerance (EC) (EC) (EC)


Time loaded into 19.38PM 19.01.2023
furnace
Time start of soak (EC) NA

Time end of soak (EC) NA


Nadcap AC7102 Revision K - 32 -

(EC) Water (EC) Water (EC) Water


Media for Cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate

16.4.4 (EC) Step One – Quench SECTION NA

16.4.4.1(EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Quench delay (EC) NA (EC) NA (EC) NA
Quench media (EC) Water (EC) Water (EC) Water
%
Quenchant (EC) 20-50 (EC) 20-50 Deg. (EC) 28 Deg. C
Temperature Deg. C C
Start
Quenchant (EC) 20-50 (EC) 20-50 Deg. (EC) 32 Deg. C
Temperature Deg. C C
End
Quenchant (EC) 20-50 (EC) 20-50 Deg. (EC) 32 DegC
Temperature Deg. C C
Rise
Quench gauge Ele
calibration
(EC) NA (EC) NA (EC) NA
Delay to the
next operation

16.4.5 Was the furnace kept at or below set temperature (including the room YES NO NA
temperature for vacuum furnaces) before loading the hardware?
Describe: (EC) Do not describe but answer YES or NO

Guidance: NA applies ONLY for continuous furnace.


Nadcap AC7102 Revision K - 33 -

16.4.6 What is the basis for determining the start and the end of the soak?
Describe:
Not applicable

16.4.7 Does the method for determining the start and the end of soak meet the YES NO
customer requirements?

Not applicable

16.5 Offsets – QA?? SECTION NA

16.5.1 Is offsetting performed? YES NO

16.5.2 Is offsetting permitted by the customer? YES NO

16.5.3 What offset is made?


Describe:

16.6 Step One Summary( Not Understand) SECTION NA

16.6.1 Is the uniformity requirement or furnace number specified on shop YES NO


paper?
(List below):

16.6.2 Does the furnace meet the uniformity requirement? YES NO

It is an Continuous type Induction H&T furnace

16.6.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

YES

16.6.4 Did cooling/quenching meet the requirements? YES NO

Yes As per Doc no. 092019 ref point no. 8-C

16.6.5 Does all thermal treatment meet the specified requirements? YES NO

Yes As per Recipe of Ind H&T furnace

16.6.6 Is there evidence that heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature?

Data logged in log book Doc. No. F180920 & SCADA.

16.6.7 Was this review performed by QA or other designated personnel and YES NO
the review documented in accordance with the customer requirements?
(U11)

As per Route Card F260920


Nadcap AC7102 Revision K - 34 -

16.7 Thermal Treatment Step Two Temper SECTION NA

16.7.1 Step Two Temper:

16.7.1.1Furnace Used: Induction Q&T line

16.7.1.2Date hardware was 13.09.2022


processed:

16.7.2 Step Two - Temperature

16.7.2.1What is the basis for determining the tempering temperature for alloy
steels?

Asper recipe for Ind. H&T furnace

16.7.2.1.1 Specified in the shop paper:

16.7.2.1.2 As quenched hardness:

16.7.2.1.3 Other (Describe):

16.7.3 (EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 701-725 (EC) 701-725 (EC) 715
Dec C Dec C Deg c
Temperature +/- +/- +/-
10Deg 10Deg c 10Deg
C c
Check if used
Control (EC) 715 Deg C
Recorder (EC) 715deg c

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

16.7.4 (EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Atmosphere
(EC) NA (EC) NA (EC) NA
Heat-up Rate
Nadcap AC7102 Revision K - 35 -

(EC) NA NA NA NA NA
Time and Tolerance
Time loaded into NA
furnace
(EC) NA
Time start of soak
(EC)
Time end of soak
(EC) Normal air (EC) Normal air (EC) Normal air cooling
Media for Cooling
cooling cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate

16.8 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

16.8.1 Step Two Age/PPT/Second Temper:

16.8.1.1Furnace Used: Induction Q&T line

16.8.1.2Date hardware was 13.09.2022


processed:

16.8.2 (EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 715-725 (EC) 715 Deg (EC) 720Deg C
Temperature
Deg C C
Check if used

Control (EC) 715-725 Deg C

Recorder (EC) 715-725 Deg C

High/Low - (EC) *
Type A or C
Instrumentation
Load (EC) *
Thermocouples

16.8.3 (EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Atmosphere
(EC) NA (EC) NA (EC) NA
Heat-up Rate
(EC) NA (EC) NA
Time and Tolerance
Time loaded into NA
furnace
Nadcap AC7102 Revision K - 36 -

(EC) NA
Time start of soak
(EC) NA
Time end of soak
(EC) Normal air (EC) Normal air (EC) Normal air cooling
Media for Cooling
cooling cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate

16.9 Step Two Summary SECTION NA

16.9.1 Is the uniformity requirement or furnace number specified on shop YES NO


paper?
(List below):

16.9.2 Does the furnace meet the uniformity requirement? YES NO

YES

16.9.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

the furnace possess the control and recording instrumentation required


by the governing specification for this heat treatment Data log into PLC
and SCADA

16.9.4 Did cooling/quenching meet the requirements? YES NO

As per WI for Ind. H&T furnace Doc no. 092019 sr. No. C-8c

16.9.5 Does all thermal treatment meet the specified requirements? YES NO

Asper recipe for induction H&T furnace

16.9.6 Is there evidence that the heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature?

As per recipe for Ind. H&T furnace and Data logged in log book & SCADA.

16.9.7 Was this review performed by QA or other designated personnel and YES NO
the review documented in accordance with the customer requirements?
(U11)

NA

16.10 Cold Temperature Treatments (NA) SECTION NA

16.10.1 (EC) Treatment Specified:


Nadcap AC7102 Revision K - 37 -

16.10.2 (EC) Treatment on the shop paper:

16.10.3 (EC) Treatment performed and documented:

16.10.4 Do these treatments meet the customer requirements? YES NO

16.11 Load Thermocouples (Elec) SECTION NA

16.11.1 Are the load thermocouples required for this job either by the customer YES NO
or internal procedure?

16.11.1.1
(EC) What requirements/documentation is specified?

16.11.1.2
(EC) How many load thermocouples are used?

16.11.1.3
What kind (expendable/non-expendable) and type?

16.11.1.4
How are the usage cycles or time intervals controlled?

16.11.1.5
(EC) Location of the load thermocouples:

16.11.1.6
Method of attachment or method to simulate the maximum hardware
thickness:

16.11.2 Did the usage and placement of load thermocouples conform to YES NO
requirements?

16.12 Straightening SECTION NA

16.12.1 Was the straightening performed? YES NO

Yes (Before induction H&T process)

16.12.1.1
Straightening:
Nadcap AC7102 Revision K - 38 -

(EC) SHOP PAPER


(EC) REQUIREMENT (EC) ACTUAL
REQUIREMENT
3mm/mtr max. 1.5mm/mtr
3mm/mtr max.

16.12.2 Did the straightening conform to requirements? YES NO

Yes.

Guidance: Straightening time and temperature allowances for


straightening may be in subordinate specifications rather than in
the basic heat treating specification.

16.13 (EC) Hardness Testing -QA SECTION NA

16.13.1 (EC) Hardness Testing

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)

Hardness/Tensile 248-310 HV 248-310 HV 279 HV


range
814 MPa 814 MPa Min 890 MPa
Min
Hardness (EC) - (EC) - (EC) -
converted from - -
Tensile
(EC) Each Lot (EC) Each Lot (EC) Each Lot or as per
Test frequency sampling plan
(EC) 22-31 HRC (EC) 22-31 HRC (EC) 25 HRC
Converted
hardness

16.13.2 Does the hardness obtained conform to specification? (U22) YES NO

16.13.3 Is the operator currently qualified/certified to perform Hardness YES NO


Testing?

16.14 (EC) Conductivity Testing SECTION NA

16.14.1 (EC) Conductivity Testing

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Nadcap AC7102 Revision K - 39 -

(EC) (EC) (EC)


Conductivity range

16.14.2 Does the conductivity obtained conform to specification? (U22) YES NO

16.14.3 Is the operator currently qualified/certified to perform Conductivity YES NO


Testing?

16.15 Additional Periodic and Lot testing required: (Charpy impact, Tensile SECTION NA
test, Fracture toughness, Metallographic and/or Microhardness tests,
etc.) - QA

Tensile test after H & T CD & CG & Metallographic test on H & T

16.15.1 (EC) Additional testing required by the specification:

16.15.1.1
(EC) Shop paper requirement for additional testing:

16.15.2 (EC) Actual additional testing results:

16.15.3 Are these tests properly documented in the Auditee’s Process Control YES NO
System?

16.15.4 Do the tests meet the customer requirement? YES NO

16.16 Operator Control and Job Acceptance

16.16.1 Independent Heat Treaters SECTION NA

16.16.1.1
Does the certificate show compliance to all applicable drawing, YES NO
specification and PO requirements including documentation of any
exceptions (e.g. pre- and post-cleaning, straightening, testing, etc.)?

(Not Understand)

16.16.1.2
Does the certificate list the revision level of the specification to which YES NO
hardware was processed?

Not understand

16.16.1.3
Do the test reports reflect the actual data? YES NO

Yes hardness sampling memo Doc no.180920

16.16.1.4
Is the heat treatment documentation verified and accepted by YES NO
authorized personnel?
Nadcap AC7102 Revision K - 40 -

Yes QA person

16.16.2 Manufacturers/Captive Heat Treaters SECTION NA

16.16.2.1
Is the heat treatment documentation verified and accepted by YES NO
authorized personnel?

Yes,the shop paper verified and accepted by authorized personnel


QA person.

16.17 Did this job comply with all other requirements? YES NO

this job comply with all other requirements as per recipe induction H&T
furnace.
Nadcap AC7102 Revision K - 41 -

17. COMPLIANCE AUDIT OF COMPLETED HEAT TREATING JOB – SECTION NA


SAME AS POINT NO. 16.)

17.1 (EC) Job #2 Identity:

17.1.1 Purchase order number: (for Independent Heat Treaters Only)

17.1.2 Customer: Randack

17.1.3 Subscriber:

17.1.4 Job number: Heat No. 36448(Batch no. 746 WD)

17.1.4.1(Info) Is the job a split job? YES NO

17.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

17.1.5 Part Number:

Guidance: If Part Number is not available mark as “Unknown”.

17.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

17.1.6 Hardware description: 42CRMO4

17.1.7 Hardware size: 35 MM

17.1.8 Maximum hardware thickness: *

17.1.9 Quantity of hardware: 675 PIECES

17.1.10 (EC) Material alloy: Medium carbon steel

17.1.11 (EC) Material condition/form: As rolled

17.1.11.1
(EC) Clad

17.1.11.2
(EC) Bare

17.1.12 (EC) Material specification (if Medium carbon steel


Nadcap AC7102 Revision K - 42 -

available):

17.1.13 (EC) Heat Treating specification: Continuous Induction hardenning


and Tempering Furnace (15 mm-
100MM)

17.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval):
As per TDC****

17.1.15 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

17.1.16 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.
Continuous Induction Hardening and Tempering Furnace

17.1.17 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

Not understand

17.2 Does the job planning contain all of the applicable items described
below?

17.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

As per recipe for Induction H&T furnace

17.2.2 Soak times and tolerances? YES NO

It is an continuous induction H&T furnace

17.2.3 Soak temperatures and tolerances? YES NO

It is an continuous induction H&T furnace

17.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

As per WI for induction H&T furnace Doc. No. 092019 .Sr. No. C-8C

17.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

17.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Nadcap AC7102 Revision K - 43 -

Instrumentation Type)?

For Ind. Post Hardenning Class 5 And Tempering Furnace Class4

and Instrumentation Type D

17.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

As per WI for Induction H&T furnace doc. No. 092019 sr. No. F 1.0,2.0

17.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?

QA person

17.2.9 Place to record inspection status? YES NO

Yes , As per Route card of Ind H&T furnace format no.F260920

17.2.10 Place to record test requirements and results? YES NO

Yes, Record for test requirement and result as per Doc . No. F180920

17.2.11 Place to record identification of person(s) doing the work? YES NO

Yes

17.2.12 Place to record date operation was performed? YES NO

Record date operation was performed on log book doc no. F190920

17.3 Racking SECTION NA

17.3.1 Are customer racking or batching requirements specified? YES NO NA


Describe: (EC) Do not describe but answer YES or NO

Yes, Batching requirement specified. On Shop Doc no. F180920 and


F190920

17.3.2 Is racking or batching specified as requirement on the shop paper? YES NO


Describe: (EC) Do not describe but answer YES or NO

Yes , Batching specified as requirement on the shop paper F 180920


and F190920

17.3.3 Is the racking or batching used in accordance to requirements? YES NO


Describe: (EC) Do not describe but answer YES or NO

batching used in accordance to requirements as per Recipe of Ind.


H&T furnace

17.3.4 Did racking ensure that air is not entrapped detrimentally during the YES NO NA
quench?
Nadcap AC7102 Revision K - 44 -

Thermal Treatment Step One SECTION NA

Step One:

Furnace Used: For Induction H& T

Date hardware was 09.08.2022


processed:

Operator who ran the job: Ajay Ilame

Simulated or Real job: Real job

(EC) Step One - Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 901-939 (EC 915 Deg (EC) 901-939
Deg C ) C Deg C
Temperature
+/-
14Deg C
Check if used
Control (EC) 915 Deg C

Recorder (EC) 915-918 deg C

High/Low - Type (EC)


A or C
Instrumentation
Load (EC)
Thermocouples

17.4.3 (EC) Step One – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Atmosphere
(EC) NA (EC) NA (EC) NA
Heat-up Rate
(EC) NA (EC) NA (EC) NA
Time and Tolerance
Time loaded into NA
furnace
Time start of soak (EC) NA
(EC) NA
Time end of soak
(EC) Water (EC) Water (EC) Water
Media for Cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate
Nadcap AC7102 Revision K - 45 -

17.4.4 (EC) Step One – Quench SECTION NA

17.4.4.1(EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Quench delay

(EC) NA (EC) NA (EC) NA


Quench media %
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 37 Deg C
Temperature Start C
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 35 Deg C
Temperature End C
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 35 deg C
Temperature Rise C
Quench gauge Ele
calibration
(EC) NA (EC) NA (EC) NA
Delay to the next
operation

17.4.5 Was the furnace kept at or below set temperature (including the room YES NO NA
temperature for vacuum furnaces) before loading the hardware?
Describe: (EC) Do not describe but answer YES or NO

Guidance: NA applies ONLY for continuous furnace.

17.4.6 What is the basis for determining the start and the end of the soak?
Describe:
Not applicable

17.4.7 Does the method for determining the start and the end of soak meet the YES NO
customer requirements?

Not applicable

17.5 Offsets (QA) SECTION NA

17.5.1 Is offsetting performed? YES NO

17.5.2 Is offsetting permitted by the customer? YES NO

17.5.3 What offset is made?


Describe:

17.6 Step One Summary( Not Understand) SECTION NA


Nadcap AC7102 Revision K - 46 -

17.6.1 Is the uniformity requirement or furnace number specified on shop YES NO


paper?
(List below):

17.6.2 Does the furnace meet the uniformity requirement? YES NO

It is an Continuous type Induction H&T furnace

17.6.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

YES

17.6.4 Did cooling/quenching meet the requirements? YES NO

Yes As per Doc no. 092019 ref point no. 8-c

17.6.5 Does all thermal treatment meet the specified requirements? YES NO

Yes As per Recipe of Ind H&T furnace F260920

17.6.6 Is there evidence that heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature?

Data logged in log book Doc. No. F180920 & SCADA.

17.6.7 Was this review performed by QA or other designated personnel and the YES NO
review documented in accordance with the customer requirements?
(U11)

Not understand

17.7 Thermal Treatment Step Two Temper SECTION NA

17.7.1 Step Two Temper:

17.7.1.1Furnace Used: Induction Q&T line

17.7.1.2Date hardware was 09.08.2022


processed:

17.7.2 Step Two - Temperature

17.7.2.1What is the basis for determining the tempering temperature for alloy
steels?

Asper recipe for Ind. H&T furnace

17.7.2.1.1 Specified in the shop paper:

17.7.2.1.2 As quenched hardness:


Nadcap AC7102 Revision K - 47 -

17.7.2.1.3 Other (Describe):

17.7.3 (EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 660-680 (EC) 660-680 (EC) 670 Deg
Deg C Deg C C
Temperature
+/- +/- +/- 10Deg
10Deg C 10Deg C C
Check if used
(EC) 675Deg C
Control

Recorder (EC) 675Deg C

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

17.7.4 (EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Atmosphere

(EC) NA (EC) NA (EC) NA


Heat-up Rate

(EC) NA NA NA NA NA
Time and Tolerance

Time loaded into NA


furnace
(EC) NA
Time start of soak
(EC) NA
Time end of soak
(EC) Normal air (EC) Normal air (EC) Normal air cooling
Media for Cooling
cooling cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate

17.8 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

17.8.1 Step Two Temper:

17.8.1.1Furnace Used: Induction Q&T line


Nadcap AC7102 Revision K - 48 -

17.8.1.2Date hardware was 09.08.2022


processed:

17.8.2 (EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 660-680 (EC) 660-680 (EC) 670 Deg
Deg C Deg C +/- C
Temperature
+/- 10Deg C
10Deg C
Check if used
(EC) 660-680 Deg C
Control

(EC) 660-680 Deg C


Recorder

High/Low - (EC) *
Type A or C
Instrumentation
Load (EC) -*
Thermocouples

17.8.3 (EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Atmosphere

(EC) NA (EC) NA (EC) NA


Heat-up Rate
(EC) NA NA NA NA NA
Time and Tolerance
Time loaded into NA
furnace
(EC) NA
Time start of soak
(EC) NA
Time end of soak
(EC) Normal air (EC) Normal air (EC) Normal air cooling
Media for Cooling
cooling cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate

17.9 Step Two Summary SECTION NA

17.9.1 Is the uniformity requirement or furnace number specified on shop YES NO


paper? (list below):
Nadcap AC7102 Revision K - 49 -

17.9.2 Does the furnace meet the uniformity requirement? YES NO

YES

17.9.3 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

he furnace possess the control and recording instrumentation required


by the governing specification for this heat treatment Data log into PLC
and SCADA

17.9.4 Did cooling/quenching meet the requirements? YES NO

As per WI for Ind. H&T furnace Doc no. 092019 sr. No. C-8c

17.9.5 Does all thermal treatment meet the specified requirements? YES NO

As per recipe for Ind. H&T furnace and Data logged in log book & SCADA.

17.9.6 Is there evidence that the heat treatment cycles are reviewed for job YES NO
traceability, correct temperature and time at temperature

NA?

17.9.7 Was this review performed by QA or other designated personnel and YES NO
the review documented in accordance with the customer requirements?
(U11)

17.10 Cold Temperature Treatments SECTION NA

17.10.1 (EC) Treatment Specified:

17.10.2 (EC) Treatment on the shop paper:

17.10.3 (EC) Treatment performed and documented:

17.10.4 Do these treatments meet the customer requirements? YES NO

17.11 Load Thermocouples (Ele) SECTION NA

17.11.1 Are the load thermocouples required for this job either by the customer YES NO
or internal procedure?

17.11.1.1
(EC) What requirements/documentation is specified?
Nadcap AC7102 Revision K - 50 -

17.11.1.2
(EC) How many load thermocouples are used?

17.11.1.3
What kind (expendable/non-expendable) and type?

17.11.1.4
How are the usage cycles or time intervals controlled?

17.11.1.5
(EC) Location of the load thermocouples:

17.11.1.6
Method of attachment or method to simulate the maximum hardware
thickness:

17.11.2 Did the usage and placement of load thermocouples conform to YES NO
requirements?

17.12 Straightening SECTION NA

17.12.1 Was the straightening performed? YES NO

17.12.1.1
Straightening:

(EC) SHOP PAPER


(EC) REQUIREMENT (EC) ACTUAL
REQUIREMENT

17.12.2 Did the straightening conform to requirements? YES NO

Guidance: Straightening time and temperature allowances for


straightening may be in subordinate specifications rather than in
the basic heat treating specification.

17.13 (EC) Hardness Testing (QA) SECTION NA

17.13.1 (EC) Hardness Testing

REQUIREMENT SHOP PAPER ACTUAL


Nadcap AC7102 Revision K - 51 -

REQUIREMENT
(EC) 316 -375 (EC) 316 -375 BHN (EC) 320 - 340 BHN
BHN 0.2ps 940 Mpa 0.2ps 1030mpa,UTS
0.2ps 940 min,UTS 1040- 1145 Mpa.
Hardness/Tensile
Mpa 1170Mpa
range
min,UTS
1040-
1170Mpa
Hardness (EC) (EC) (EC)
converted from
Tensile
(EC) As per SOP (EC) As per SOP (EC) As per SOP
Test frequency

(EC) (EC) (EC)


Converted
hardness

17.13.2 Does the hardness obtained conform to specification? (U22) YES NO

17.13.3 Is the operator currently qualified/certified to perform Hardness YES NO


Testing?

17.14 (EC) Conductivity Testing SECTION NA

17.14.1 (EC) Conductivity Testing

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)
Conductivity range

17.14.2 Does the conductivity obtained conform to specification? (U22) YES NO

17.14.3 Is the operator currently qualified/certified to perform Conductivity YES NO


Testing?

17.15 Additional Periodic and Lot testing required: (Charpy impact, Tensile SECTION NA
test, Fracture toughness, Metallographic and/or Microhardness tests,
etc.)

17.15.1 Additional testing required by the specification:

17.15.1.1
Shop paper requirement for additional testing:

17.15.2 Actual additional testing results:


Nadcap AC7102 Revision K - 52 -

17.15.3 Are these tests properly documented in the Auditee’s Process Control YES NO
System?

17.15.4 Do the tests meet the customer requirement? YES NO

17.16 Operator Control and Job Acceptance

17.16.1 Independent Heat Treaters SECTION NA

17.16.1.1
Does the certificate show compliance to all applicable drawing, YES NO
specification and PO requirements including documentation of any
exceptions (e.g. pre- and post-cleaning, straightening, testing, etc.)?

(Not Understand)

17.16.1.2
Does the certificate list the revision level of the specification to which YES NO
the hardware was processed?

Not understand

17.16.1.3
Do the test reports reflect the actual data? YES NO

Yes hardness sampling memo Doc no.180920

17.16.1.4
Is the heat treatment documentation verified and accepted by YES NO
authorized personnel?

Yes

17.16.2 Manufacturers/Captive Heat Treaters SECTION NA

17.16.2.1
Is the heat treatment documentation verified and accepted by YES NO
authorized personnel?

Yes,the shop paper verified and accepted by authorized personnel QA


person.

17.17 Did this job comply with all other requirements? YES NO

his job comply with all other requirements as per recipe induction H&T
furnace.
Nadcap AC7102 Revision K - 53 -

18. TO 25. COMPLIANCE AUDITS OF ABBREVIATED HEAT TREATING JOBS

The Auditor shall execute eight (8) abbreviated in-process job audits
for a single lot of in-process components, except when the abbreviated
in-process heat treating jobs are replaced by an equal amount of other
processing jobs predicated on the declared scope of the audit (see
AC7102/1, AC7102/3, AC7101/4, AC7102/6, AC7102/7 and AC7102/9)
performed in conjunction with AC7102 Audit Criteria.

When eight (8) abbreviated in-process jobs cannot be witnessed,


completed jobs may substitute the in-process jobs, but not for more
than four (4).

18. COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

18.1 (EC) Job #3 Identity:

18.1.1 Purchase order number: (for Independent Heat Treaters Only)

18.1.2 Customer: Randack

18.1.3 Subscriber:

18.1.4 Job number: Heat No. 35929( batch no.755 WL)

18.1.4.1(Info) Is the job a split job? YES NO

18.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

18.1.5 Part Number:

18.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S.


Export Control Regulations, questions in the Job Audit marked ‘EC’
cannot be answered as the information may be considered restricted.
Simply record ‘EC’ in the comment box for these questions.

18.1.6 Hardware description: 42CRMO4N

18.1.7 Hardware size: 63 MM

18.1.8 Maximum hardware thickness: *


Nadcap AC7102 Revision K - 54 -

18.1.9 Quantity of hardware: 83

18.1.10 (EC) Material alloy: Medium carbon steel

18.1.11 (EC) Material condition/form: As rolled

18.1.11.1
(EC) Clad

18.1.11.2
(EC) Bare

18.1.12 (EC) Material specification (if Medium carbon steel


available):

18.1.13 (EC) Heat Treating specification: Continuous Induction hardenning


and Tempering Furnace (15 mm-
100MM)

18.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:

As per TDC****

18.1.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.
Continuous Induction Hardening and Tempering Furnace

18.1.16 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

Not understand

18.1.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

18.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

Not understand

18.1.19 (EC) Pre-heat treatment requirements on the shop paper:

18.1.20 (EC) Pre-heat treatment actually performed:


Nadcap AC7102 Revision K - 55 -

18.2 Does the job planning contain all of the applicable items described
below?

18.2.1 Specification required parameters for the complete heat treatment YES NO
cycle listed on the specific job planning for the Part Number, or is
referenced in a controlled system traceable to the Part Number?

As per recipe for Induction H&T furnace

18.2.2 Soak times and tolerances? YES NO

It is an continuous induction H&T furnace

18.2.3 Soak temperatures and tolerances? YES NO

It is an continuous induction H&T furnace

18.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

As per WI for induction H&T furnace Doc. No. 092019 .Sr. No. C-8C

18.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

18.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Instrumentation Type)?

For Ind. Post Hardenning Class 5 And Tempering Furnace Class4

and Instrumentation Type D

18.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

As per WI for Induction H&T furnace doc. No. 092019 sr. No. F 1.0,2.0

18.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?

QA person

18.2.9 Place to record inspection status? YES NO

Yes , As per Route card of Ind H&T furnace

18.3 Thermal Treatment Step One SECTION NA

18.3.1 Step One:

18.3.1.1Furnace used: For Induction H& T


Nadcap AC7102 Revision K - 56 -

18.3.1.2 Date hardware 27.08.2022


was processed:

18.3.1.3Operator who ran the job: Ajay Ilame

18.3.1.4Simulated or Real Job: Real Job

18.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

The furnace possess the control and recording instrumentation


required by the governing specification for this heat treatment Data log
into PLC and SCADA

18.3.3 Does the furnace meet the uniformity requirement? YES NO

YES

18.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

NA

18.3.4.1(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 901-929 (EC) 901-929 (EC) 915 Deg.
Deg C Deg C C
Temperature
+/- 14 +/- 14 Deg +/- 14 Deg
Deg C C C
Check if used
Control (EC) 915 Deg C

(EC) 901-929 Deg C


Recorder
+/- 14 Deg C
High/Low - (EC) NA
Type A or C
Instrumentation
Load (EC) NA
Thermocouples

18.3.4.2(EC) Step One – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Nadcap AC7102 Revision K - 57 -

Atmosphere (EC) NA (EC) NA (EC) NA

Heat-up Rate (EC) NA (EC) NA (EC) NA

Time and Tolerance (EC) NA (EC) NA (EC) NA

Time loaded into


furnace
Time start of soak (EC) NA

Time end of soak (EC) NA

Media for Cooling (EC) Water (EC) Water (EC) Water

Cooling Target (EC) NA (EC) NA (EC) NA


Cooling Rate

18.3.4.3(EC) Step One - Quench SECTION NA

18.3.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Quench delay

(EC) NA (EC) NA (EC) NA


Quench media %
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 32 Deg C
Temperature Start C
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 36 Deg C
Temperature End C
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 32-36 Deg C
Temperature Rise C
Quench gauge Ele
calibration
(EC) NA (EC) NA (EC) NA
Delay to the next
operation

18.4 Thermal Treatment Step Two SECTION NA

18.4.1 Thermal Treatment Step Two Temper SECTION NA

18.4.1.1Step Two Temper:

18.4.1.1.1 Furnace used: Induction Q&T line

18.4.1.1.2 Date hardware 27.08.2022


was processed:
Nadcap AC7102 Revision K - 58 -

18.4.1.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

The furnace possess the control and recording instrumentation required


by the governing specification for this heat treatment Data log into PLC
and SCADA

18.4.1.3Does the furnace meet the uniformity requirement? YES NO

YES

18.4.1.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

NA

18.4.1.5(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 667- (EC) 667-694 (EC) 680 Deg
694Deg Deg C +/- C
Temperature
C +/- 10Deg C
10Deg C
Check if used
(EC) 667-694 Deg C
Control
(EC) 667-694 Deg C
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

18.4.1.6(EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) NA (EC) NA (EC) NA

Heat-up Rate (EC) NA (EC) NA (EC) NA

Time and Tolerance (EC) NA NA NA NA NA

Time loaded into NA


furnace
Time start of soak (EC) NA

Time end of soak (EC) NA

Media for Cooling (EC) Normal air (EC) Normal air (EC) Normal air cooling
Nadcap AC7102 Revision K - 59 -

cooling cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate

18.4.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

18.4.2.1Step Two Age/PPT/Second Temper:

18.4.2.1.1 Furnace used: Induction Q&T line

18.4.2.1.2 Date hardware 27.08.2022


was processed:

18.4.2.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

The furnace possess the control and recording instrumentation required


by the governing specification for this heat treatment Data log into PLC
and SCADA

18.4.2.3Does the furnace meet the uniformity requirement? YES NO

Yes

18.4.2.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

NA

18.4.2.5((EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

18.4.2.6(EC) Step Two Age/PPT/Second Temper – Time


Nadcap AC7102 Revision K - 60 -

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

Testing for the abbreviated Job #3 (QA) SECTION NA

(EC) Testing requirements by Specification, P/O or Drawing:

By Specification & P/O

(EC) Shop paper testing requirements:

As per Specification

(EC) Actual testing performed:

By Specification & P/O

Job Acceptance

Is the operation signed off or data recorded only after completion? YES N
O
Data recorded in SCADA regular charge

Did the treatment of hardware conform to customer’s specified YES N


requirements? O

Yes treatment of hardware conform to customer’s specified


requirements As per Recipe of Induction H&T furnace.
Nadcap AC7102 Revision K - 61 -

COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

18.7 (EC) Job #4 Identity:

18.7.1 Purchase order number: (for Independent Heat Treaters Only)

18.7.2 Customer: S.D. Eng neering

18.7.3 Subscriber:

18.7.4 Job number: Heat No. 36760(Batch no.


6441AA)

18.7.4.1(Info) Is the job a split job? YES NO

18.7.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

18.7.5 Part Number:

18.7.5.1(Info) Is the hardware controlled under U.S. Export Control YES NO


Regulation as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S.


Export Control Regulations, questions in the Job Audit marked ‘EC’
cannot be answered as the information may be considered restricted.
Simply record ‘EC’ in the comment box for these questions.

18.7.6 Hardware description: S45CS1- QDS

18.7.7 Hardware size: 26MM


Nadcap AC7102 Revision K - 62 -

18.7.8 Maximum hardware thickness: 27MM

18.7.9 Quantity of hardware: 454 Pieces

18.7.10 (EC) Material alloy: Medium carbon steel

18.7.11 (EC) Material condition/form: As rolled peeled &Ground

18.7.11.1
(EC) Clad

18.7.11.2
(EC) Bare

18.7.12 (EC) Material specification (if Medium carbon steel


available):

18.7.13 (EC) Heat Treating specification: Continuous Induction hardenning


and Tempering Furnace (15 mm-
100MM)

18.7.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections
3.2, 3.7 and 6:

18.7.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age,


etc.) only for non-EC jobs.
Continuous Induction Hardening and Tempering Furnace

18.7.16 When a Nadcap Subscriber is identified, is there documentation YES NO NA


which demonstrates that the Auditee is approved?

Not understand

18.7.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

18.7.18 When the heat treat specification has cleaning requirements prior to YES NO NA
or after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

Not understand

18.7.19 (EC) Pre-heat treatment requirements on the shop paper:


Nadcap AC7102 Revision K - 63 -

18.7.20 (EC) Pre-heat treatment actually performed:

18.8 Does the job planning contain all of the applicable items described
below?

18.8.1 Specification required parameters for the complete heat treatment YES NO
cycle listed on the specific job planning for the Part Number, or is
referenced in a controlled system traceable to the Part Number?

As per recipe for Induction H&T furnace

18.8.2 Soak times and tolerances? YES NO

It is an continuous induction H&T furnace

18.8.3 Soak temperatures and tolerances? YES NO

It is an continuous induction H&T furnace

18.8.4 Quench media and Quench temperatures (as applicable)? YES N NA


O
As per WI for induction H&T furnace Doc. No. 092019 .Sr. No. C-8C

18.8.5 Atmosphere (including air) or vacuum requirements? YES N


O
Guidance: NA is for when only air atmosphere is used in all furnaces.

18.8.6 Furnace identification or method to determine which furnaces are YES N


acceptable for the specific heat treatment (e.g., Furnace Class and O
Instrumentation Type)?

For Ind. Post Hardenning Class 5 And Tempering Furnace Class4

and Instrumentation Type D

18.8.7 Test samples (Type and Quantity) identification (as applicable)? YES N NA
O
As per WI for Induction H&T furnace doc. No. 092019 sr. No. F
1.0,2.0

18.8.8 Any changes, additions, and deletions are made by authorized YES N
personnel? O

QA person

18.8.9 Place to record inspection status? YES N


O
Yes , As per Route card of Ind H&T furnace
Nadcap AC7102 Revision K - 64 -

18.9 Thermal Treatment Step One SECTION NA

18.9.1 Step One:

18.9.1.1Furnace used: For Induction H& T

18.9.1.2 Date hardware 09.09.2022


was processed:

18.9.1.3Operator who ran the job: Chandrakant mate

18.9.1.4Simulated or Real job: Real Job

18.9.2 Does the furnace possess the control and recording instrumentation YES N
required by the governing specification for this heat treatment? O

The furnace possess the control and recording instrumentation


required by the governing specification for this heat treatment Data
log into PLC and SCADA

18.9.3 Does the furnace meet the uniformity requirement? YES N


O
YES

18.9.4 Is hardware loaded in the furnace within the qualified work zone as YES N
defined by the Auditee's most recent uniformity survey? O

NA

18.9.4.1(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 861-889 (EC) 861-889 (EC) 875 Deg
Deg C Deg C +/- C
Temperature
+/-14 14 Deg c
Deg C
Check if used

Control (EC) 875-889 Deg C

Recorder (EC) 879-889 Deg C

High/Low - (EC) NA
Type A or C
Instrumentation
Load (EC) NA
Thermocouples
Nadcap AC7102 Revision K - 65 -

18.9.4.2(EC) Step One – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) NA (EC) NA (EC) NA

Heat-up Rate (EC) NA (EC) NA (EC) NA

Time and Tolerance (EC) NA (EC) NA (EC) NA

Time loaded into


furnace
Time start of soak (EC) NA

Time end of soak (EC) NA

Media for Cooling (EC) Water (EC) Water (EC) Water

Cooling Target (EC) NA (EC) NA (EC) NA


Cooling Rate

18.9.4.3(EC) Step One - Quench SECTION NA

18.9.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) NA (EC) NA (EC) NA
Quench delay

(EC) NA (EC) NA (EC) NA


Quench media %
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 35 Deg C
Temperature Start C
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 37 Deg C
Temperature End C
Quenchant (EC) 20-50 Deg. (EC) 20-50 Deg. C (EC) 35-37 Deg C
Temperature Rise C
Quench gauge Ele
calibration
(EC) NA (EC) NA (EC) NA
Delay to the next
operation

18.10 Thermal Treatment Step Two SECTION NA

18.10.1 Thermal Treatment Step Two Temper SECTION NA

18.10.1.1
Step Two Temper:
Nadcap AC7102 Revision K - 66 -

18.10.1.1.1 Furnace used: Induction Q&T line

18.10.1.1.2 Date hardware 09.09.2022


was processed:

18.10.1.2
Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

The furnace possess the control and recording instrumentation required


by the governing specification for this heat treatment Data log into PLC
and SCADA

18.10.1.3
Does the furnace meet the uniformity requirement? YES NO

YES

18.10.1.4
Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

NA

18.10.1.5

(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) 660- (EC) 660-680C (EC) 670 Deg
Temperature 680C +/- +/- 10Deg C
10Deg C C
Check if used
(EC) 660-680C +/- 10Deg
Control
C
(EC) 660-680C +/- 10Deg
Recorder
C
High/Low - (EC) NA
Type A or C
Instrumentation
Load (EC) NA
Thermocouples

18.10.1.6
(EC) Step Two Temper – Time
Nadcap AC7102 Revision K - 67 -

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) NA (EC) NA (EC) NA

Heat-up Rate (EC) NA (EC) NA (EC) NA

Time and Tolerance (EC) NA NA NA NA NA

Time loaded into 02.26 PM 09.09.2022


furnace
Time start of soak (EC) NA

Time end of soak (EC) NA

(EC) Normal air (EC) Normal air (EC) Normal air cooling
Media for Cooling
cooling cooling
Cooling Target (EC) NA (EC) NA (EC) NA
Cooling Rate

18.10.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

18.10.2.1
Step Two Age/PPT/Second Temper:

18.10.2.1.1 Furnace used: Induction Q&T line

18.10.2.1.2 Date hardware 09.09.2022


was processed:

18.10.2.2
Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

The furnace possess the control and recording instrumentation required


by the governing specification for this heat treatment Data log into PLC
and SCADA

18.10.2.3
Does the furnace meet the uniformity requirement? YES NO

Yes

18.10.2.4
Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

NA

18.10.2.5
(EC) Step Two Age/PPT/Second Temper – Temperature(NA)

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)
Nadcap AC7102 Revision K - 68 -

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

18.10.2.6
(EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

18.11 Testing for the abbreviated Job #4(QA) SECTION NA

18.11.1 (EC) Testing requirements by Specification, P/O or Drawing:

By Specification & PO

18.11.2 (EC) Shop paper testing requirements:

As per Specification

18.11.3 (EC) Actual testing performed:

Yes

18.12 Job Acceptance

18.12.1 Is the operation signed off or data recorded only after completion? YES NO

Data recorded in SCADA regular charge .


Nadcap AC7102 Revision K - 69 -

18.12.2 Did the treatment of hardware conform to customer’s specified YES NO


requirements?

Yes treatment of hardware conform to customer’s specified


requirements As per Recipe of Induction H&T furnace.
Nadcap AC7102 Revision K - 70 -

19. COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

19.1 (EC) Job #5 Identity:

19.1.1 Purchase order number: (for Independent Heat Treaters Only)

19.1.2 Customer:

19.1.3 Subscriber:

19.1.4 Job number:

19.1.4.1(Info) Is the job a split job? YES NO

19.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

19.1.5 Part Number:

19.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

19.1.6 Hardware description:

19.1.7 Hardware size:

19.1.8 Maximum hardware thickness:

19.1.9 Quantity of hardware:

19.1.10 (EC) Material alloy:

19.1.11 (EC) Material condition/form:

19.1.11.1
(EC) Clad

19.1.11.2
(EC) Bare

19.1.12 (EC) Material specification (if


available):
Nadcap AC7102 Revision K - 71 -

19.1.13 (EC) Heat Treating specification:

19.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:

19.1.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.

19.1.16 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

19.1.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

19.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

19.1.19 (EC) Pre-heat treatment requirements on the shop paper:

19.1.20 (EC) Pre-heat treatment actually performed:

19.2 Does the job planning contain all of the applicable items described
below?

19.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

19.2.2 Soak times and tolerances? YES NO

19.2.3 Soak temperatures and tolerances? YES NO

19.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

19.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

19.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Instrumentation Type)?
Nadcap AC7102 Revision K - 72 -

19.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

19.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?

19.2.9 Place to record inspection status? YES NO

19.3 Thermal Treatment Step One SECTION NA

19.3.1 Step One:

19.3.1.1Furnace used:

19.3.1.2 Date hardware


was processed:

19.3.1.3Operator who ran the job:

19.3.1.4Simulated or Real job:

19.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

19.3.3 Does the furnace meet the uniformity requirement? YES NO

19.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

19.3.4.1(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

19.3.4.2(EC) Step One – Time


Nadcap AC7102 Revision K - 73 -

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

19.3.4.3(EC) Step One - Quench SECTION NA

19.3.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)
Quench delay

(EC) (EC) (EC)


Quench media %
Quenchant (EC) (EC) (EC)
Temperature Start
Quenchant (EC) (EC) (EC)
Temperature End
Quenchant (EC) (EC) (EC)
Temperature Rise
Quench gauge
calibration
(EC) (EC) (EC)
Delay to the next
operation

19.4 Thermal Treatment Step Two SECTION NA

19.4.1 Thermal Treatment Step Two Temper SECTION NA

19.4.1.1Step Two Temper:

19.4.1.1.1 Furnace used:


Nadcap AC7102 Revision K - 74 -

19.4.1.1.2 Date hardware


was processed:

19.4.1.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

19.4.1.3Does the furnace meet the uniformity requirement? YES NO

19.4.1.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

19.4.1.5(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

19.4.1.6(EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate
Nadcap AC7102 Revision K - 75 -

19.4.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

19.4.2.1Step Two Age/PPT/Second Temper:

19.4.2.1.1 Furnace used:

19.4.2.1.2 Date hardware


was processed:

19.4.2.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

19.4.2.3Does the furnace meet the uniformity requirement? YES NO

19.4.2.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

19.4.2.5(EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

19.4.2.6(EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)
Nadcap AC7102 Revision K - 76 -

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

19.5 Testing for the abbreviated Job #5 SECTION NA

19.5.1 (EC) Testing requirements by Specification, P/O or Drawing:

19.5.2 (EC) Shop paper testing requirements:

19.5.3 (EC) Actual testing performed:

19.6 Job Acceptance

19.6.1 Is the operation signed off or data recorded only after completion? YES NO

19.6.2 Did the treatment of hardware conform to customer’s specified YES NO


requirements?
Nadcap AC7102 Revision K - 77 -

20. COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

20.1 (EC) Job #6 Identity: __________________________________

20.1.1 Purchase order number: (for Independent Heat Treaters Only)

20.1.2 Customer:

20.1.3 Subscriber:

20.1.4 Job number:

20.1.4.1(Info) Is the job a split job? YES NO

20.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

20.1.5 Part Number:

20.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

20.1.6 Hardware description:

20.1.7 Hardware size:

20.1.8 Maximum hardware thickness:

20.1.9 Quantity of hardware:

20.1.10 (EC) Material alloy:

20.1.11 (EC) Material condition/form:

20.1.11.1
(EC) Clad

20.1.11.2
(EC) Bare

20.1.12 (EC) Material specification (if


available):
Nadcap AC7102 Revision K - 78 -

20.1.13 (EC) Heat Treating specification:

20.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:

20.1.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.

20.1.16 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

20.1.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

20.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

20.1.19 (EC) Pre-heat treatment requirements on the shop paper:

20.1.20 (EC) Pre-heat treatment actually performed:

20.2 Does the job planning contain all of the applicable items described
below?

20.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

20.2.2 Soak times and tolerances? YES NO

20.2.3 Soak temperatures and tolerances? YES NO

20.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

20.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

20.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Instrumentation Type)?
Nadcap AC7102 Revision K - 79 -

20.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

20.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?

20.2.9 Place to record inspection status? YES NO

20.3 Thermal Treatment Step One SECTION NA

20.3.1 Step One:

20.3.1.1Furnace used:

20.3.1.2 Date hardware


was processed:

20.3.1.3Operator who ran the job:

20.3.1.4Simulated or Real job:

20.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

20.3.3 Does the furnace meet the uniformity requirement? YES NO

20.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

20.3.4.1(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

20.3.4.2(EC) Step One – Time


Nadcap AC7102 Revision K - 80 -

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

20.3.4.3(EC) Step One - Quench SECTION NA

20.3.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)
Quench delay

(EC) (EC) (EC)


Quench media %
Quenchant (EC) (EC) (EC)
Temperature Start
Quenchant (EC) (EC) (EC)
Temperature End
Quenchant (EC) (EC) (EC)
Temperature Rise
Quench gauge
calibration
(EC) (EC) (EC)
Delay to the next
operation

20.4 Thermal Treatment Step Two SECTION NA

20.4.1 Thermal Treatment Step Two Temper SECTION NA

20.4.1.1Step Two Temper:

20.4.1.1.1 Furnace used:


Nadcap AC7102 Revision K - 81 -

20.4.1.1.2 Date hardware


was processed:

20.4.1.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

20.4.1.3Does the furnace meet the uniformity requirement? YES NO

20.4.1.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

20.4.1.5(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

20.4.1.6(EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

20.4.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA


Nadcap AC7102 Revision K - 82 -

20.4.2.1Step Two Age/PPT/Second Temper:

20.4.2.1.1 Furnace used:

20.4.2.1.2 Date hardware


was processed:

20.4.2.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

20.4.2.3Does the furnace meet the uniformity requirement? YES NO

20.4.2.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

20.4.2.5(EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

20.4.2.6
(EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)


Nadcap AC7102 Revision K - 83 -

Cooling Target (EC) (EC) (EC)


Cooling Rate

20.5 Testing for the abbreviated Job #6 SECTION NA

20.5.1 (EC) Testing requirements by Specification, P/O or Drawing:

20.5.2 (EC) Shop paper testing requirements:

20.5.3 (EC) Actual testing performed:

20.6 Job Acceptance

20.6.1 Is the operation signed off or data recorded only after completion? YES NO

20.6.2 Did the treatment of hardware conform to customer’s specified YES NO


requirements?
Nadcap AC7102 Revision K - 84 -

21. COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

21.1 (EC) Job #7 Identity:

21.1.1 Purchase order number: (for Independent Heat Treaters Only)

21.1.2 Customer:

21.1.3 Subscriber:

21.1.4 Job number:

21.1.4.1(Info) Is the job a split job? YES NO

21.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

21.1.5 Part Number:

21.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

21.1.6 Hardware description:

21.1.7 Hardware size:

21.1.8 Maximum hardware thickness:

21.1.9 Quantity of hardware:

21.1.10 (EC) Material alloy:

21.1.11 (EC) Material condition/form:

21.1.11.1
(EC) Clad

21.1.11.2
(EC) Bare

21.1.12 (EC) Material specification (if


available):
Nadcap AC7102 Revision K - 85 -

21.1.13 (EC) Heat Treating specification:

21.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:

21.1.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.

21.1.16 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

21.1.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

21.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

(EC) Pre-heat treatment requirements on the shop paper:

(EC) Pre-heat treatment actually performed:

Does the job planning contain all of the applicable items described
below?

Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

Soak times and tolerances? YES NO

Soak temperatures and tolerances? YES NO

Quench media and Quench temperatures (as applicable)? YES NO NA

Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Instrumentation Type)?
Nadcap AC7102 Revision K - 86 -

Test samples (Type and Quantity) identification (as applicable)? YES NO NA

Any changes, additions, and deletions are made by authorized YES NO


personnel?

Place to record inspection status? YES NO

Thermal Treatment Step One SECTION NA

Step One:

Furnace used:

Date hardware was

processed:

Operator who ran the job:

Simulated or Real job:

Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

Does the furnace meet the uniformity requirement? YES NO

Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

21.3.4.2(EC) Step One – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)
Nadcap AC7102 Revision K - 87 -

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

21.3.4.3(EC) Step One - Quench SECTION NA

21.3.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)
Quench delay

(EC) (EC) (EC)


Quench media %
Quenchant (EC) (EC) (EC)
Temperature Start
Quenchant (EC) (EC) (EC)
Temperature End
Quenchant (EC) (EC) (EC)
Temperature Rise
Quench gauge
calibration
(EC) (EC) (EC)
Delay to the next
operation

21.4 Thermal Treatment Step Two SECTION NA

21.4.1 Thermal Treatment Step Two Temper SECTION NA

21.4.1.1Step Two Temper:

21.4.1.1.1 Furnace used:

21.4.1.1.2 Date hardware


was processed:

21.4.1.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?
Nadcap AC7102 Revision K - 88 -

21.4.1.3Does the furnace meet the uniformity requirement? YES NO

21.4.1.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

21.4.1.5(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

21.4.1.6(EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

21.4.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

21.4.2.1Step Two Age/PPT/Second Temper:

21.4.2.1.1 Furnace used:


Nadcap AC7102 Revision K - 89 -

21.4.2.1.2 Date hardware


was processed:

21.4.2.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

21.4.2.3Does the furnace meet the uniformity requirement? YES NO

21.4.2.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

21.4.2.5(EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

21.4.2.6
(EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate
Nadcap AC7102 Revision K - 90 -

21.5 Testing for the abbreviated Job #7 SECTION NA

21.5.1 (EC) Testing requirements by Specification, P/O or Drawing:

21.5.2 (EC) Shop paper testing requirements:

21.5.3 (EC) Actual testing performed:

21.6 Job Acceptance

21.6.1 Is the operation signed off or data recorded only after completion? YES NO

21.6.2 Did the treatment of hardware conform to customer’s specified YES NO


requirements?
Nadcap AC7102 Revision K - 91 -

22. COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

22.1 (EC) Job #8 Identity:

22.1.1 Purchase order number: (for Independent Heat Treaters Only)

22.1.2 Customer:

22.1.3 Subscriber:

22.1.4 Job number:

22.1.4.1(Info) Is the job a split job? YES NO

22.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

22.1.5 Part Number:

22.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

22.1.6 Hardware description:

22.1.7 Hardware size:

22.1.8 Maximum hardware thickness:

22.1.9 Quantity of hardware:

22.1.10 (EC) Material alloy:

22.1.11 (EC) Material condition/form:

22.1.11.1
(EC) Clad

22.1.11.2
(EC) Bare

22.1.12 (EC) Material specification (if


available):
Nadcap AC7102 Revision K - 92 -

22.1.13 (EC) Heat Treating specification:

22.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:

22.1.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.

22.1.16 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

22.1.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

22.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

22.1.19 (EC) Pre-heat treatment requirements on the shop paper:

22.1.20 (EC) Pre-heat treatment actually performed:

22.2 Does the job planning contain all of the applicable items described
below?

22.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

22.2.2 Soak times and tolerances? YES NO

22.2.3 Soak temperatures and tolerances? YES NO

22.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

22.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

22.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Instrumentation Type)?
Nadcap AC7102 Revision K - 93 -

22.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

22.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?

22.2.9 Place to record inspection status? YES NO

22.3 Thermal Treatment Step One SECTION NA

22.3.1 Step One:

22.3.1.1Furnace used:

22.3.1.2 Date hardware was

processed:

22.3.1.3Operator who ran the job:

22.3.1.4Simulated or Real job:

22.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

22.3.3 Does the furnace meet the uniformity requirement? YES NO

22.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

22.3.4.1(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

22.3.4.2(EC) Step One – Time


Nadcap AC7102 Revision K - 94 -

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

22.3.4.3(EC) Step One - Quench SECTION NA

22.3.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)
Quench delay

(EC) (EC) (EC)


Quench media %
Quenchant (EC) (EC) (EC)
Temperature Start
Quenchant (EC) (EC) (EC)
Temperature End
Quenchant (EC) (EC) (EC)
Temperature Rise
Quench gauge
calibration
(EC) (EC) (EC)
Delay to the next
operation

22.4 Thermal Treatment Step Two SECTION NA

22.4.1 Thermal Treatment Step Two Temper SECTION NA

22.4.1.1Step Two Temper:

22.4.1.1.1 Furnace used:


Nadcap AC7102 Revision K - 95 -

22.4.1.1.2 Date hardware


was processed:

22.4.1.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

22.4.1.3Does the furnace meet the uniformity requirement? YES NO

22.4.1.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

22.4.1.5(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

22.4.1.6(EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

22.4.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA


Nadcap AC7102 Revision K - 96 -

22.4.2.1Step Two Age/PPT/Second Temper:

22.4.2.1.1 Furnace used:

22.4.2.1.2 Date hardware


was processed:

22.4.2.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

22.4.2.3Does the furnace meet the uniformity requirement? YES NO

22.4.2.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

22.4.2.5(EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
(EC) (EC (EC)
Temperature
)
Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

22.4.2.6(EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)


Nadcap AC7102 Revision K - 97 -

Cooling Target (EC) (EC) (EC)


Cooling Rate

22.5 Testing for the abbreviated Job #8 SECTION NA

22.5.1 (EC) Testing requirements by Specification, P/O or Drawing:

22.5.2 (EC) Shop paper testing requirements:

22.5.3 (EC) Actual testing performed:

22.6 Job Acceptance

22.6.1 Is the operation signed off or data recorded only after completion? YES NO

22.6.2 Did the treatment of hardware conform to customer’s specified YES NO


requirements?
Nadcap AC7102 Revision K - 98 -

23. COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

23.1 (EC) Job #9 Identity:

23.1.1 Purchase order number: (for Independent Heat Treaters Only)

23.1.2 Customer:

23.1.3 Subscriber:

23.1.4 Job number:

23.1.4.1(Info) Is the job a split job? YES NO

23.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

23.1.5 Part Number:

23.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

23.1.6 Hardware description:

23.1.7 Hardware size:

23.1.8 Maximum hardware thickness:

23.1.9 Quantity of hardware:

23.1.10 (EC) Material alloy:

23.1.11 (EC) Material condition/form:

23.1.11.1
(EC) Clad

23.1.11.2
(EC) Bare

23.1.12 (EC) Material specification (if


available):
Nadcap AC7102 Revision K - 99 -

23.1.13 (EC) Heat Treating specification:

23.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:

23.1.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs.

23.1.16 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

23.1.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

23.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

23.1.19 (EC) Pre-heat treatment requirements on the shop paper:

23.1.20 (EC) Pre-heat treatment actually performed:

23.2 Does the job planning contain all of the applicable items described
below?

23.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

23.2.2 Soak times and tolerances? YES NO

23.2.3 Soak temperatures and tolerances? YES NO

23.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

23.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

23.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Instrumentation Type)?
Nadcap AC7102 Revision K - 100 -

23.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

23.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?

23.2.9 Place to record inspection status? YES NO

23.3 Thermal Treatment Step One SECTION NA

23.3.1 Step One:

23.3.1.1Furnace used:

23.3.1.2 Date hardware


was processed:

23.3.1.3Operator who ran the job:

23.3.1.4Simulated or Real job:

23.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

23.3.3 Does the furnace meet the uniformity requirement? YES NO

23.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

23.3.4.1(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

23.3.4.2(EC) Step One – Time


Nadcap AC7102 Revision K - 101 -

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

23.3.4.3(EC) Step One - Quench SECTION NA

23.3.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)
Quench delay

(EC) (EC) (EC)


Quench media %
Quenchant (EC) (EC) (EC)
Temperature Start
Quenchant (EC) (EC) (EC)
Temperature End
Quenchant (EC) (EC) (EC)
Temperature Rise
Quench gauge
calibration
(EC) (EC) (EC)
Delay to the next
operation

23.4 Thermal Treatment Step Two SECTION NA

23.4.1 Thermal Treatment Step Two Temper SECTION NA

23.4.1.1Step Two Temper:

23.4.1.1.1 Furnace used:

23.4.1.1.2 Date hardware


Nadcap AC7102 Revision K - 102 -

was processed:

23.4.1.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

23.4.1.3Does the furnace meet the uniformity requirement? YES NO

23.4.1.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

23.4.1.5(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

23.4.1.6(EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

23.4.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA


Nadcap AC7102 Revision K - 103 -

23.4.2.1Step Two Age/PPT/Second Temper:

23.4.2.1.1 Furnace used:

23.4.2.1.2 Date hardware was


processed:

23.4.2.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

23.4.2.3Does the furnace meet the uniformity requirement? YES NO

23.4.2.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

23.4.2.5(EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

23.4.2.6(EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and (EC) (EC) (EC)


Tolerance
Time loaded into
furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)


Nadcap AC7102 Revision K - 104 -

Cooling Target (EC) (EC) (EC)


Cooling Rate

23.5 Testing for the abbreviated Job #9 SECTION NA

23.5.1 (EC) Testing requirements by Specification, P/O or Drawing:

23.5.2 (EC) Shop paper testing requirements:

23.5.3 (EC) Actual testing performed:

23.6 Job Acceptance

23.6.1 Is the operation signed off or data recorded only after completion? YES NO

23.6.2 Did the treatment of hardware conform to customer’s specified YES NO


requirements?
Nadcap AC7102 Revision K - 105 -

24. COMPLIANCE AUDIT OF ABBREVIATED HEAT TREATING JOB SECTION NA

24.1 (EC) Job #10 Identity:

24.1.1 Purchase order number: (for Independent Heat Treaters Only)

24.1.2 Customer:

24.1.3 Subscriber:

24.1.4 Job number:

24.1.4.1(Info) Is the job a split job? YES NO

24.1.4.2If the job is a split job, were all required tests performed for each split YES NO NA
job?

24.1.5 Part Number:

24.1.5.1(Info) Is the hardware controlled under U.S. Export Control Regulation YES NO
as declared by the Auditee?

Guidance: If the hardware being audited is controlled under U.S. Export


Control Regulations, questions in the Job Audit marked ‘EC’ cannot be
answered as the information may be considered restricted. Simply
record ‘EC’ in the comment box for these questions.

24.1.6 Hardware description:

24.1.7 Hardware size:

24.1.8 Maximum hardware thickness:

24.1.9 Quantity of hardware:

24.1.10 (EC) Material alloy:

24.1.11 (EC) Material condition/form:

24.1.11.1
(EC) Clad

24.1.11.2
(EC) Bare

24.1.12 (EC) Material specification (if


available):
Nadcap AC7102 Revision K - 106 -

24.1.13 (EC) Heat Treating specification:

24.1.14 (EC) Heat treat and other process and test requirements specified by
customer specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 6:

24.1.15 (EC) Process:

Guidance: Summarize Process Name (e.g. Solution, Anneal, Age, etc.)


only for non-EC jobs,

24.1.16 When a Nadcap Subscriber is identified, is there documentation which YES NO NA


demonstrates that the Auditee is approved?

24.1.17 (EC) Pre-heat treatment requirements (cleaning, racking, normalizing,


plating, stress relieving, etc.):

24.1.18 When the heat treat specification has cleaning requirements prior to or YES NO NA
after heat treatment, are they properly flowed to the job planning
including the cleaning specification?

24.1.19 (EC) Pre-heat treatment requirements on the shop paper:

24.1.20 (EC) Pre-heat treatment actually performed:

24.2 Does the job planning contain all of the applicable items described
below?

24.2.1 Specification required parameters for the complete heat treatment cycle YES NO
listed on the specific job planning for the Part Number, or is referenced
in a controlled system traceable to the Part Number?

24.2.2 Soak times and tolerances? YES NO

24.2.3 Soak temperatures and tolerances? YES NO

24.2.4 Quench media and Quench temperatures (as applicable)? YES NO NA

24.2.5 Atmosphere (including air) or vacuum requirements? YES NO NA

Guidance: NA is for when only air atmosphere is used in all furnaces.

24.2.6 Furnace identification or method to determine which furnaces are YES NO


acceptable for the specific heat treatment (e.g., Furnace Class and
Nadcap AC7102 Revision K - 107 -

Instrumentation Type)?

24.2.7 Test samples (Type and Quantity) identification (as applicable)? YES NO NA

24.2.8 Any changes, additions, and deletions are made by authorized YES NO
personnel?

24.2.9 Place to record inspection status? YES NO

24.3 Thermal Treatment Step One SECTION NA

24.3.1 Step One:

24.3.1.1Furnace used:

24.3.1.2 Date hardware


was processed:

24.3.1.3Operator who ran the job:

24.3.1.4Simulated or Real job:

24.3.2 Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

24.3.3 Does the furnace meet the uniformity requirement? YES NO

24.3.4 Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

24.3.4.1(EC) Step One – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

24.3.4.2(EC) Step One – Time


Nadcap AC7102 Revision K - 108 -

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

24.3.4.3(EC) Step One - Quench SECTION NA

24.3.4.3.1 (EC) Step One - Quench

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
(EC) (EC) (EC)
Quench delay

(EC) (EC) (EC)


Quench media %
Quenchant (EC) (EC) (EC)
Temperature Start
Quenchant (EC) (EC) (EC)
Temperature End
Quenchant (EC) (EC) (EC)
Temperature Rise
Quench gauge
calibration
(EC) (EC) (EC)
Delay to the next
operation

24.4 Thermal Treatment Step Two SECTION NA

24.4.1 Thermal Treatment Step Two Temper SECTION NA

24.4.1.1Step Two Temper:


Nadcap AC7102 Revision K - 109 -

24.4.1.1.1 Furnace used:

24.4.1.1.2 Date hardware


was processed:

24.4.1.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

24.4.1.3Does the furnace meet the uniformity requirement? YES NO

24.4.1.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

24.4.1.5(EC) Step Two Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

24.4.1.6(EC) Step Two Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and Tolerance (EC) (EC) (EC)

Time loaded into


furnace
Time start of soak (EC)

Time end of soak (EC)

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate
Nadcap AC7102 Revision K - 110 -

24.4.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

24.4.2.1Step Two Age/PPT/Second Temper:

24.4.2.1.1 Furnace used:

24.4.2.1.2 Date hardware


was processed:

24.4.2.2Does the furnace possess the control and recording instrumentation YES NO
required by the governing specification for this heat treatment?

24.4.2.3Does the furnace meet the uniformity requirement? YES NO

24.4.2.4Is hardware loaded in the furnace within the qualified work zone as YES NO
defined by the Auditee's most recent uniformity survey?

24.4.2.5(EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMENT SHOP PAPER SET ACTUAL


REQUIREMENT TEMPERATURE TEMPERATURES
Temperature (EC) (EC) (EC)

Check if used

Control (EC)

Recorder (EC)

High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples

24.4.2.6(EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT SHOP PAPER ACTUAL


REQUIREMENT
Atmosphere (EC) (EC) (EC)

Heat-up Rate (EC) (EC) (EC)

Time and (EC) (EC) (EC)


Tolerance
Time loaded into
furnace
Time start of soak (EC)

Time end of soak (EC)


Nadcap AC7102 Revision K - 111 -

Media for Cooling (EC) (EC) (EC)

Cooling Target (EC) (EC) (EC)


Cooling Rate

24.5 Testing for the abbreviated Job #10 SECTION NA

24.5.1 (EC) Testing requirements by Specification, P/O or Drawing:

24.5.2 (EC) Shop paper testing requirements:

24.5.3 (EC) Actual testing performed:

24.6 Job Acceptance

24.6.1 Is the operation signed off or data recorded only after completion? YES NO

24.6.2 Did the treatment of hardware conform to customer’s specified YES NO


requirements?