REVISION TABLE
REVISION PAGE REVISION ATTACHMENT REVISION
PAGE
A A1 B A A1 B A A1 B
1 X X 31 X JSA X X X
2 32 X
3 33
4 34 X
5 35
6 X 36 X X
7 X X X 37 X
8 X X X 38 X
9 X X 39
10 40 X
11 X 41
12 X 42 X
13 X X 43 X
14 X 44 X
15 X 45
16 X X 46 X X
17 X 47 X
18 X 48 X
19 X 49 X
20 X 50
21 X X 51
22 X 52
23 X 53
24 54
25 X 55
26 X X 56
27 X
28 X
29 X
30 X
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 3 of 56
CONDENSER, AND SURGE TANK
Rev
Section Page Comment Implemented (Y/N) Explanation
No
Note: Cek lagi urutan
A1 Cover 1 kerja di JSA sesuai Y Implemented
prosedur
Tambahkan list untuk
dokumen lifting and
A1 5. Referensi 7 Y Implemented
rigging beserta no
dokumennya
List O. Tambahkan no
B. Pencegahan
A1 9 dokumen lifting dan Y Implemented
sumber bahaya
rigging
Kolom material Tambahkan list
A1 habis pakai 13 11. Demin Water dan Y Implemented
(consumable) Raw water
Penambahan Tambahkan Kolom
A1 42 Y Implemented
kolom baru baru E. Joint Inspeksi
Tambahkan list
2. Joint inspeksi, hasil
A1 A.Painting 44 Y Implemented
painting pengukuran
DFT
Tambahkan list
B.Instalasi Heat 2. Joint inspeksi untuk
A1 44 Y Implemented
Insulation pemasangan
insulation
Tambahkan list
A1 15. Attachment 46 E. Report hasil inspeksi Y Implemented
/ Berita acara inspeksi
Perbaiki kepanjangan
B 7 Y Implemented
5. Referensi TKO
7. Persyaratan Pastikan personil
B Y Implemented
Personel tersertifikasi
Sudah
8 ditambahkan
8. Alat Pelindung Gas Detector bukan
B Y pada judul poin 8.
Diri APD
Alat Pelindung
Diri & Safety Tool
B. Cleaning:
Poin 5 tambahkan
10.4 Prosedur
Supervisor
B Kerja untuk 16 Y Implemented
C. Inspeksi:
Glycol Reboiller
Poin 1 & 2 Tambahkan
Supervisor, PI
10.5 Prosedur B. Cleaning:
B Kerja untuk Flue 20 Poin 3 Tambahkan Y Implemented
Gas Stack Supervisor
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 4 of 56
CONDENSER, AND SURGE TANK
C. Inspeksi:
B 21 Poin 1 & 2 Tambahkan Y Implemented
10.5 Prosedur
Supervisor, PI
Kerja untuk Flue
E. Reinstal:
Gas Stack
B 22 Poin 10 Tambahkan Y Implemented
Supervisor
B. Cleaning:
Poin 3 Tambahkan
Supervisor
B 26
10.6 Prosedur C. Inspeksi:
Kerja untuk Fire Poin 1 & 2 Tambahkan Y Implemented
Tube Supervisor, PI
E. Reinstal:
B 30 Poin 14 Tambahkan
Supervisor
B. Cleaning:
Poin 4 Tambahkan
Supervisor
B 31
10.7 Prosedur C. Inspeksi:
Kerja untuk Poin 1 & 2 Tambahkan Y Implemented
Reflux Condenser Supervisor, PI
E. Reinstal:
B 36 Poin 10 Tambahkan
Supervisor
B. Cleaning:
Poin 6 Tambahkan
Supervisor
B 38
10.8 Prosedur C. Inspeksi:
Kerja untuk Still Poin 1 & 2 Tambahkan Y Implemented
Column Supervisor, PI
E. Reinstal:
B 40 Poin 10 Tambahkan
Supervisor
C. Inspeksi:
B 43 Poin 1 & 2 Tambahkan Y Implemented
10.9 Prosedur
Supervisor, PI
Kerja untuk
E. Reinstal:
Stripper Column
B 45 Poin 14 Tambahkan Y Implemented
Supervisor
A. Cleaning:
B 10.10 Prosedur 46 Poin 5 Tambahkan Y Implemented
Kerja untuk Surge Supervisor
Tank Poin 1 & 2 Tambahkan
B 47 Y Implemented
Supervisor, PI
10.11 Painting A. Painting:
B dan Instalasi Heat 48 Poin 2 Tambahkan Y Implemented
Insulation Supervisor
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 5 of 56
CONDENSER, AND SURGE TANK
B. Instalasi Heat
Insulation:
B Y Implemented
Poin 2 Tambahkan
10.11 Painting
Supervisor
dan Instalasi Heat 48
C. Reinstalasi Rail
Insulation
Guard:
B Y Implemented
Poin 3 Tambahkan
Supervisor
Seberapa bersih?
11. Acceptance Jelaskan lebih lanjut
B 49 Y Implemented
Criteria kalua oil, karat akan
seperti apa?
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 6 of 56
CONDENSER, AND SURGE TANK
DAFTAR ISI
1. PENDAHULUAN ............................................................................................................. 7
2. RUANG LINGKUP........................................................................................................... 8
3. TUJUAN .......................................................................................................................... 8
4. ISTILAH .......................................................................................................................... 8
5. REFERENSI.................................................................................................................... 9
6. TENAGA KERJA ............................................................................................................. 9
7. PERSYARATAN PERSONEL ....................................................................................... 10
8. ALAT PELINDUNG DIRI & SAFETY TOOL ................................................................... 10
9. BAHAYA DAN RESIKO ................................................................................................. 10
10. ALUR KERJA ................................................................................................................ 12
10.1 GAMBARAN DAN CATATAN TEKNIS ................................................................. 12
10.2 LIST PERALATAN DAN EQUIPMENT PEKERJAAN ........................................... 13
10.3 PERSIAPAN KERJA ............................................................................................ 16
10.4 PROSEDUR KERJA UNTUK GLYCOL REBOILER ............................................. 18
10.5 PROSEDUR KERJA UNTUK FLUE GAS STACK ................................................ 20
10.6 PROSEDUR KERJA UNTUK FIRE TUBE ............................................................ 24
10.7 PROSEDUR KERJA UNTUK REFLUX CONDENSER ......................................... 33
10.8 PROSEDUR KERJA UNTUK STILL COLUMN ..................................................... 38
10.9 PROSEDUR KERJA UNTUK STRIPPER COLUMN ............................................. 42
10.10 PROSEDUR KERJA UNTUK SURGE TANK .................................................... 47
10.11 PAINTING DAN INSTALASI HEAT INSULATION ............................................. 50
10.12 HOUSEKEEPING ............................................................................................. 51
11. ACCEPTANCE CRITERIA ............................................................................................ 51
12. KESELAMATAN KERJA ............................................................................................... 51
13. HOUSEKEEPING ......................................................................................................... 51
14. REPORT ....................................................................................................................... 51
15. ATTACHMENT .............................................................................................................. 52
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 7 of 56
CONDENSER, AND SURGE TANK
1. PENDAHULUAN
Untuk menjaga kualitas gas maka Pertamina EP Zona 7 SP Subang melaksanakan
pekerjaan “Perbaikan Dehydration Unit di SP Subang, Subang Field”. Pekerjaan dilakukan
di wilayah Pertamina EP Zona 7 field Subang, Pelaksanaan Konstruksi akan dilaksanakan
bersamaan dengan kegiatan operasi dan produksi, maka strategi pekerjaan yang tepat perlu
dilaksanakan sehingga semua hambatan yang mungkin terjadi bisa di antisipasi. Dalam
pelaksanaan pekerjaan ini, salah satu pekerjaan yang akan dilakukan PT Mipcon Prima
Industri adalah melakukan Perbaikan Gas Dehydration Unit di SP Subang. Pada
pelaksanaannya, pekerja akan terlibat dalam aktivitas pekerjaan di ketinggian, pekerjaan
pengangkatan dan pekerjaan pembersihan sehingga memiliki resiko yang tinggi. Untuk
mendapatkan hasil pekerjaan yang baik dan menghindari terjadinya kecelakaan kerja, maka
perlu disusun sebuah prosedur yang menjadi acuan tim dalam proses eksekusi pekerjaan di
lapangan.
2. RUANG LINGKUP
Secara garis besar, ruang lingkup pekerjaan ini meliputi:
Isolasi system gas line glycol reboiler
Dismantling fire tube dan flue gas stack pada glycol reboiler, still column, stripper
column, dan reflux condenser
Cleaning glycol reboiler (including fire tube dan flue gas stack), surge tank, still column,
stripper column, dan reflux condenser
Inspeksi glycol reboiler (including fire tube dan flue gas stack), surge tank, still column,
stripper column, dan reflux condenser
Penggantian mini ring pada stripper column dan still column
Re-install fire tube dan flue gas stack pada glycol reboiler, still column, stripper column,
dan reflux condenser
Penggantian gasket baru pada sistem glycol reboiler dan bolt tightening
Repainting glycol reboiler (including fire tube dan flue gas stack), surge tank, still
column, stripper column, dan reflux condenser (refer to procedure DHUSB-00-Q3-PR-
001 Surface Preparation & Painting Procedure)
Penggantian heat insulation pada glycol reboiler, surge tank, still column, stripper
column, dan reflux condenser (refer to procedure DHUSB-20-C2-PR-005 - Procedure
for Replacement Heat Insulation)
Perbaikan apabila terdapat kerusakan akibat dismantling glycol reboiler (including fire
tube dan flue gas stack), surge tank, still column, stripper column, dan reflux condenser
3. TUJUAN
Tujuan dari prosedur ini adalah sebagai acuan untuk melakuan kegiatan cleaning glycol
reboiler, surge tank, still column, stripper column, dan reflux condenser.
4. ISTILAH
Dalam prosedur ini, kata-kata atau kalimat maupun istilah harus mempunyai arti
sebagaimana ditentukan di bawah ini, kecuali ditentukan atau disebut lain:
PERUSAHAAN : PERUSAHAAN yang dimaksud adalah PT. Pertamina EP
Zona 7 selaku Pemilik dan Pengguna Fasilitas akhir.
KONTRAKTOR : Pihak yang dipilih oleh PERUSAHAAN sebagai pelaksana
pekerjaan ini yaitu PT. Mipcon Prima Industri
PROYEK : PERBAIKAN GAS DEHYDRATION UNIT DI SP SUBANG
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 9 of 56
CONDENSER, AND SURGE TANK
5. REFERENSI
Dokumen dibawah ini merupakan referensi yang memuat informasi secara langsung atau
tidak langsung dengan dokumen prosedur ini:
Permenaker No. 5 tahun 2018 Keselamatan dan Kesehatan Kerja Lingkungan kerja
B-005/A3/EP0300/2020-S9 Tata Kerja Organisasi (TKO) Alat Pelindung Diri
B-007/A3/EP0300/2020-S9 Tata Kerja Organisasi (TKO) Surat Izin Kerja Aman
(SIKA) dan Kontrol Pekerjaan Berbahaya
B-014/A3/EP0300/2020-S9 TKO Job Safety Analysis (JSA)
PEP-00-NI-SP-0001 Painting Spesification for External Metal Surface
ASME B31.3 Process Piping
ASME B16.5 Pipe Flanges & Flanges Fittings
ASME PCC-1 Guidelines for Pressure Boundary Bolted Flange Joint
and Assembly
ASME PCC-2 Repair of Pressure Equipment and Piping
ASME B16.48 Line Blanks
ASME B31.1 Power Piping
ASME VIII Div. I Rule for Construction of Pressure Vessel
Rencana Kerja dan Syarat Syarat – Syarat Teknis dan Komersial “Perbaikan Gas
Dehydration Unit di SP Subang Field Subang”
DHUSB-00-C0-PR-002 Procedure for General Lifting dan Rigging
DHUSB-10-P1-LST-001 List Peralatan LOTO
DHUSB-10-P1-PID-001 P&ID Modification Dehydration System SP Subang
DHUSB-20-L0-DWG-002 Isometric Drawing
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
J:\756\300\H-301 Glycol Reboiler/SurgeTank/Stripper Col./Still Col.
DHUSB-00-C0-PR-002 Procedure for General Lifting and Rigging
6. TENAGA KERJA
a. Mechanical Supervisor : 1 Orang
b. HSSE Officer : 1 Orang
c. Mechanical tech. : 4 Orang
d. Helper : 2 Orang
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 10 of 56
CONDENSER, AND SURGE TANK
e. Scaffolder : 2 Orang
f. QA/QC : 1 orang
7. PERSYARATAN PERSONEL
a. Personil telah memiliki HSE Passpor dan SIM-L
b. Personil harus fit to work dan lulus fit to task.
c. Personil telah memiliki pengalaman kerja sesuai dengan pekerjaan.
d. Personil telah tersertifikasi.
e. Personil telah mengerti dan memahami dengan baik Prosedur & JSA.
f. Personil harus dilengkapi dengan alat pelindung diri sesuai dengan jenis pekerjaannya
g. Personil harus disiplin, taat pada peraturan dan prosedur, tidak ceroboh, tidak lalai,
tidak tergesa-gesa dan tidak mengambil resiko dalam melaksanakan pekerjaan.
h. Selalu melakukan pre-job safety meeting sebelum bekerja.
b. Peralatan
i. Peralatan yang digunakan tidak sesuai dengan standar dan spesifikasi
ii. Peralatan yang digunakan tidak sesuai dengan fungsinya
iii. Peralatan yang digunakan tidak dilakukan inspeksi terlebih dahulu
c. Lingkungan
i. Kondisi cuaca yang buruk atau hujan
ii. Kondisi tempat kerja yang licin dan berantakan
iii. Kondisi gas berbahaya pada area kerja yang melebihi ambang batas aman
iv. Tekanan fluida dalam vessel
v. Tekanan fluida dalam peralatan cleaning
vi. Sisa fluida proses dalam vessel dan pipa
d. Lifting dan Rigging
i. Lifting tidak dilakukan sesuai prosedur
ii. Spesifikasi peralatan lifting tidak sesuai dengan kebutuhan pengangkatan
iii. Kondisi peralatan lifting kurang baik dan tidak bersertifikasi yang valid
B. Pencegahan sumber bahaya
a. Lakukan pemasangan LOTO sesuai otoritas dan kebutuhan
b. Pekerjaan wajib diawasi oleh supervisor
c. Gunakan alat komunikasi dua arah (walkie talkie)
d. Pastikan penggunaan APD yang sesuai dengan pekerjaan
e. Melakukan safety talk / toolbox meeting dan pembahasan JSA
f. Gunakan peralatan sesuai dengan standar, spesifikasi, dan kegunaannya
g. Lakukan kalibrasi pada alat ukur yang digunakan
h. Lakukan inspeksi pada peralatan yang akan digunakan
i. Hentikan pekerjaan ketika cuaca tidak aman untuk melakukan pekerjaan
j. Pastikan area kerja bersih dan rapi sebelum melakukan pekerjaan
k. Lakukan pemeriksaan kandungan gas berbahaya pada lingkungan kerja
l. Lakukan barikade pada area kerja dan area kerja hanya boleh dimasuki oleh
pekerja yang bertanggung jawab atas pekerjaan
m. Release dan pastikan tekanan di dalam vessel dan pipa hingga zero pressure
n. Pastikan semua koneksi hose dan fitting pada peralatan kencang dan diberi
pengaman seperti whip check
o. Lakukan lifting sesuai dengan prosedur lifting dan rigging DHUSB-00-C0-PR-002
p. Lakukan house keeping setelah pekerjaan selesai
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 12 of 56
CONDENSER, AND SURGE TANK
1 Gas detector 2 ea
2 Generator set 7 kW 1 Ea
7 Water jet pump c.w. nozzle gun & hoses 100 bar 6 L/min 2 set
16 Scraper, brass 5 ea
20 Shackle 3 ton 5 ea
22 Katrol 1 ton 1 ea
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 14 of 56
CONDENSER, AND SURGE TANK
25 Scaffolding 1 lot
31 Combination wrench 36 mm 2 ea
39 Hammer wrench 32 mm 2 ea
40 Hammer wrench 36 mm 2 ea
43 Cutter gasket 1 ea
Material Permanen
1 Grafoil 3 mm 3 m x 3 m 1 Roll
2 Grafoil 3 mm 3 m x 3 m 1 Roll
8 Solar 1 liter 1 ea
10 WD-40 5 can
A Persiapan
2 Pastikan manual valve pada header line fuel gas inlet burner
tube heater telah ditutup rapat dan dipasang tag sesuai
dengan LOTO list
3 Pastikan manual valve pada header line fuel gas outlet Supervisor
burner tube heater telah ditutup rapat dan dipasang tag
sesuai dengan LOTO list
5 Pasang slip blind 1” 300# pada line header fuel gas inlet
reboiler skid dengan mengacu pada Gambar 3.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 18 of 56
CONDENSER, AND SURGE TANK
A Dismantling
B Cleaning
1 Lakukan dismantling flue gas stack dan fire tube terlebih dahulu
untuk mengakses sisi dalam vessel glycol reboiler
8 Bersihkan dinding dalam dan luar vessel dan internal parts nya
menggunakan water jet (raw water) dan lakukan penggosokan
pada dinding dalam dan luar dengan wire brush hingga bersih
dan bilas dengan demineralized water
C Inspeksi
D Reinstall
E Cleaning Area
A Dismantling
6 Lepas bolting dari flange shell flue gas stack (flange A pada
Supervisor
Gambar 5) yang akan diangkat
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 21 of 56
CONDENSER, AND SURGE TANK
7 Angkat dan letakkan flue gas stack pada area laydown seperti
Gambar 5
(a)
Rigger
(b)
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 22 of 56
CONDENSER, AND SURGE TANK
Rigger
(c)
Gambar 5. Skematik pelepasan flue gas stack glycol reboiler
B Cleaning
3 Lakukan inspeksi awal pada sisi dalam flue gas stack QA/QC,
Supervisor
4 Bersihkan sisi dalam flue gas stack menggunakan water jet (raw
water) dan gosok menggunakan wire brush dengan long rod Supervisor
hingga bersih. Bilas dengan demineralized water
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 23 of 56
CONDENSER, AND SURGE TANK
C Inspeksi
D Perbaikan
E Reinstall
1 Pastikan semua pekerjaan dan inspeksi final pada flue gas stack Supervisor,
telah dilakukan sebelum melakukan reinstalasi. QC/QC
7 Pasang gasket grafoil dan bolting pada flange flue gas stack
E Cleaning Area
A Dismantling
Supervisor
Supervisor
Dokumen referensi:
Rigger
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging
7 Pasang salah satu wire sling dari rangkaian 2 set wire sling
dan 1 unit chain block 3 ton pada lifting hook crane dengan
lifting lug di unit fire tube. Lihat Gambar 8 untuk skematik
rangkaian set wire sling dan chain block.
Rigger, Supervisor
B Cleaning
C Inspeksi
D Perbaikan
E Reinstall
4 Posisikan crane dan forklift untuk reinstall fire tube Rigger, Supervisor
Supervisor
8 Atur posisi fire tube setelah posisi fire tube di atas support
Rigger, Supervisor
menggunakan chain block yang terpasang pada rangkaian
webbing sling untuk melepas posisi webbling sling di sisi
mitering bend sesuai dengan Gambar 14.
(a)
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 31 of 56
CONDENSER, AND SURGE TANK
Rigger, Supervisor
(b)
Gambar 14. Skematik reinstalasi fire tube setelah diatas
support
Supervisor
Gambar 15. Skematik fire tube setelah reinstalasi
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
E Cleaning Area
A Dismantling
Supervisor
Rigger
Dokumen referensi:
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging
Rigger
(a)
(b)
Gambar 17. Skematik dismantling dan laydown unit reflux
condenser
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 35 of 56
CONDENSER, AND SURGE TANK
B Cleaning
Supervisor
Gambar 21. Skematik cleaning sisi dalam tube reflux condenser
C Inspeksi
NDT Personnel
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 37 of 56
CONDENSER, AND SURGE TANK
D Perbaikan
E Reinstall
Dokumen referensi:
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging
tightening
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
8 Pasang kembali flange joint piping dan shell nozzle
Supervisor
menggunakan gasket baru.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 38 of 56
CONDENSER, AND SURGE TANK
F Cleaning Area
A Dismantling
3 Pasang lifting lug di top flange pada still column dengan wire
rope pada crane
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 39 of 56
CONDENSER, AND SURGE TANK
4 Lepas bolting bottom shell flange still column dan top shell
flange glycol reboiler, dan lepas flange joint pipa N17 yang
tersambung pada still column
Supervisor
B Cleaning
5 Keluarkan pall ring dan tempatkan pada jumbo bag seperti pada
gambar 24
Supervisor
C Inspeksi
D Perbaikan
E Reinstall
5 Pasang gasket pada flange still column dan flange reboiler Supervisor
6 Angkat still column menggunakan crane dan pasang kembali Operator Crane,
flange shell still column dengan flange shell reboiler. Supervisor
Supervisor
Gambar 25. Skematik Flange Joint pipa N17
8 Kencangkan semua bolting sesuai dengan prosedur bolt
tightening
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
F Cleaning Area
A Dismantling
3 Dismantle flange joint piping nozzle N12, N13, N14 dan N15
pada stripping column.
Supervisor
Rigger
(a)
Rigger
(b)
Gambar 27. Skematik dismantling Still Column
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 44 of 56
CONDENSER, AND SURGE TANK
B Cleaning
3 Angkat still column dan letakkan pada laydown scaffolding yang Rigger, Supervisor
telah disiapkan sesuai dengan gambar 29 (berada dalam
temporary pond)
Rigger, Supervisor
C Inspeksi
D Perbaikan
E Reinstall
8 Install flange joint piping nozzle N12, N13, N14 dan N15 pada
stripping column.
Supervisor
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
E Cleaning Area
A Cleaning
Supervisor
Supervisor
7 Bersihkan internal vessel dan parts nya dengan water jet (raw
water) dan lakukan penggosokan dengan steel wire brush
hingga bersih. Bilas dengan demineralized water.
C Inspeksi
D Perbaikan
E Reinstall
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
F Cleaning Area
A Painting
Supervisor
Dokumen referensi:
DHUSB-00-Q3-PR-001 Surface Preparation & Painting
Procedure
10.12 HOUSEKEEPING
A Housekeeping
13. HOUSEKEEPING
Setiap pekerjaan selesai dilaksanakan, semua pekerja harus melakukan general
houskeeping. HSE dan supervisor wajib memastikan lingkungan area kerja harus
ditinggalkan dalam kondisi bersih.
Limbah sisa dari pekerjaan cleaning wajib dibuang ke tempat yang telah ditentukan dan wajib
dikoordinasikan dengan pihak yang berwenang terkait material handling-nya
14. REPORT
Hasil dari pekerjaan ini akan dituangkan dalam bentuk laporan pekerjaan yang berupa:
- Cleaning report
- Inspection report
- Weekly report
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 52 of 56
CONDENSER, AND SURGE TANK
15. ATTACHMENT
Lampiran B – JSA
No. Formulir
PT. PERTAMINA EP Revisi
T.M.T
DHU PERTAMINA ZONA 7 EP SUBANG Halaman 1 dari 3
JOB SAFETY ANALYSIS
TANGGAL / No. JSA 14 Desember 2023 / DHUSB-20-C2-PRO-008 PELAKSANA PEKERJAAN PT. MIPCON PRIMA INDUSTRI
Cleaning Glycol Contactor. PENGAWAS PEKERJAAN PERTAMINA EP ZONA 7
PEKERJAAN
Item No. V301 & V401 LOKASI SP SUBANG
PROTECTIVE EQUIPMENT REQUIRED TO PERFORM THIS JOB (ALAT PELINDUNG YANG DIPERLUKAN UNTUK MELAKSANAKAN PEKERJAAN)
√ SAFETY HELMET √ EAR PLUG/EAR MUFF RUBBER GLOVES FIRE EXTINGUISHER
√ SAFETY SHOES RUBBER BOOT √ FULL BODY √ LOCK OUT/TAG OUT
√ SAFETY GLASSES FACE SHIELD HARNES
CHEMICAL COAT OIL SPILL KIT
COTTON GLOVES APRON RESPIRATOR/SCB √ WORK PERMITT REQUIRED
LEATHER GLOVES √ DUST / GAS MASK √ A
GOOGLES √ OTHER :
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
TDK
ADA N/A
ADA
Pastikan peralatan kerja sudah sesuai dengan jenis HSE, SPV
pekerjaan dan dalam kondisi baik. Pastikan peralatan
Jenis peralatan kerja tidak sesuai dengan kerja sudah diinspeksi dan peralatan kerja standard/
a R
jenis pekerjaan atau alat kerja rusak. tidak hasil hand made atau hasil modifikasi
1 Persiapan Pekerjaan Pastikan alat pelindung diri sudah memenuhi dengan HSE, SPV
Alat pelindung diri tidak sesuai dengan persyaratan safety dan gunakan APD yang sesuai
b R
persyaratan keselamatan dengan jenis pekerjaan
Pastikan area kerja cukup dan aman untuk pekerjaan HSE, SPV
c Area bekerja tidak aman R yang akan dilakukan. Lakukan last minute risk
assesment
Pastikan Permit sudah dibuat dan sudah sesuai HSE, SPV
Permit belum dibuat dan tidak sesuai dengan jenis pekerjaan
2 Permit to Work (SIKA) a R
dengan pekerjaan yang dilakukan
Dismantling Equipment
Gunakan APD Mandatory dan gunakan APD tambahan HSE, SPV
Masker Vapour Organic masker untuk mengurangi
dampak paparan fluida berbahaya dan gunakan face
a Terpapar fluida berbahaya M shield. Gas Detector selalu standby di area kerja yang
berisiko ada paparan gas/ paparan fluida berbahaya
SIKA dan JSA sudah dibuat sebelum bekerja. Daily HSE, SPV
Check-up (DCU) sudah dilakukan sebelum bekerja.
Pastikan personil yang bekerja diketinggian sudah
Buka manhole, pasang fan blower,
mendapatkan training bekerja diketinggian .Pasang
5 dan periksa kandungan oksigen
Safety sign bekerja diketinggian dan drop object.
dalam vessel b Jatuh dari ketinggian H
Barricade system harus diterapkan di area kerja.
Gunakan platform kerja yang aman saat bekerja di
ketinggian. Gunakan full body harness saat bekerja di
ketinggian dan 100% Tie Off
Inspeksi Equipment
'Pastikan pekerja sudah melakukan Daily Checkup dan HSE, SPV
pekerja sudah mendapatkan training bekerja di
Lakukan inspeksi visual pada
ketinggian. Pemasangan safety sign di area kerja
10 vessel glycol contactor beserta a Jatuh dari ketinggian H
Menggunakan full body harness dan 100% Tie Off
komponen internalnya
Memasang safety sign di area kerja
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
Reinstatement Equipment HSE, SPV
Ada Signalman ada diarea kerja saat alat berat HSE, SPV
beroperasi. Pasang barricade diarea pekerjaan
pengangkatan dan pasang juga safety sign di area
Siapkan material reinstatement kerja.Sosialisasikan di briefing pagi mengenai line of
11 a Pekerja tertabrak alat berat H
dan posisikan crane fire dan safe zone position bekerja dengan alat berat.
SIKA dan Lifting plan sudah tersedia. SOP bekerja
dengan aman sudah disosialisasikan pada saat safety
briefing
'Pastikan pekerja sudah melakukan Daily Checkup dan HSE, SPV
pekerja sudah mendapatkan training bekerja di
a Jatuh dari ketinggian H ketinggian. Pemasangan safety sign di area kerja
Menggunakan full body harness dan 100% Tie Off
Memasang safety sign di area kerja
Reinstall liquid distributor, dimister Pastikan pengikatan dilakukan sesuai dengan SOP dan HSE, SPV
12 pengikatan dilakukan oleh rigger bersertifikat
top dan bottom column
valid.Pastikat alat bantu pengangkatan sudah
c diinspeksi dan dalam keadaan baik saat digunakan.
Komponen glycol kontaktor terjatuh M
Gunakan dan tentukan sling sesuai dengan maksimal
kapasitas beban yang akan diangkat dan sesuai
dengan lifting plan
Ada Signalman ada diarea kerja saat alat berat HSE, SPV
beroperasi. Pasang barricade diarea pekerjaan
pengangkatan dan pasang juga safety sign di area
kerja.Sosialisasikan di briefing pagi mengenai line of
d Pekerja tertabrak alat berat H
fire dan safe zone position bekerja dengan alat berat.
SIKA dan Lifting plan sudah tersedia. SOP bekerja
dengan aman sudah disosialisasikan pada saat safety
briefing
Finishing
13. Dismantling Scafolding Hindari titik jepit (Pinch Point) saat memegang Clamp. HSE, SPV
a Jari tangan terjepit clamp scaffolding. R
Gunakan sarung tangan Heavy Duty
Tidak berdiri dibawah pemasangan clamp dan pipa HSE, SPV
b Tertimpa clamp dan pipa scaffolding. H scaffolding. Barricade system dan safety sign dipasang
di area kerja
Bekerja dengan berhati-hati, tidak berada dibawah HSE, SPV
c Terjepit Asiba R pemasangan scaffolding, ikat dengan proper saat
pemasangan asiba
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
Pemasangan scaffolding hanya dilakukan oleh HSE, SPV
d Scaffolding Roboh H scaffolder yang bersertifikat dan SIO masih aktif
SIKA dan JSA sudah dibuat sebelum bekerja. Daily HSE, SPV
Check-up (DCU) sudah dilakukan sebelum bekerja.
Pastikan personil yang bekerja diketinggian sudah
mendapatkan training bekerja diketinggian .Pasang
Safety sign bekerja diketinggian dan drop object.
e Jatuh dari ketinggian H Barricade system harus diterapkan di area kerja.
Gunakan platform kerja yang aman saat bekerja di
ketinggian. Gunakan full body harness saat bekerja di
ketinggian dan 100% Tie Off
14. House Keeping Area Kerja kotor , material dan peralatan Lakukan housekeeping sebelum dan sudah selesai
berceceran bekerja. Lakukan penataan materian dengan baik.
Masukkan dan pilah sampah sesuai jenisnya di tempat
sampah. Sosialisasikan secara berkelanjutan mengenai
R HSE, SPV
pentingnya menjaga kebersihan di area kerja. Gunakan
APD mandatory dan gunakan sarung tangan saat
melakukan house keeping
Cleaning glycol
reboiler, surge tank
& Flash tank
JB
Cleaning Glycol
Air
contactor
comp
Pompa
dab
Raw water
Water truck
Pompa
Legend Pompa air
dab