MECHANICAL PROCEDURE

Total
Contract No. Document No. Rev.
Pages:
4710000183 DHUSB-20-C2-PR-009 B1
56 Pages

PERBAIKAN GAS DEHYDRATION UNIT DI SP SUBANG

PROCEDURE FOR CLEANING AND INSPECTION GLYCOL REBOILER (H301)


INCLUDING STILL COLUMN, STRIPPER COLUMN, REFLUX CONDENSER,
AND SURGE TANK

B1 07/03/2024 Re-Issued for Approval VJ ANK ES

B 21/02/2024 Issued for Approval VJ ANK ES

A1 29/01/2024 Re-issued for Review VJ ANK ES

A 19/12/2023 Issued for Review VJ ANK ES

Prepared Checked Approved Initial Approved


Rev Date Description
PT. MIPCON PRIMA INDUSTRI PT. PERTAMINA EP
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 2 of 56
CONDENSER, AND SURGE TANK

REVISION TABLE
REVISION PAGE REVISION ATTACHMENT REVISION
PAGE
A A1 B A A1 B A A1 B
1 X X 31 X JSA X X X
2 32 X
3 33
4 34 X
5 35
6 X 36 X X
7 X X X 37 X
8 X X X 38 X
9 X X 39
10 40 X
11 X 41
12 X 42 X
13 X X 43 X
14 X 44 X
15 X 45
16 X X 46 X X
17 X 47 X
18 X 48 X
19 X 49 X
20 X 50
21 X X 51
22 X 52
23 X 53
24 54
25 X 55
26 X X 56
27 X
28 X
29 X
30 X
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 3 of 56
CONDENSER, AND SURGE TANK

Rev
Section Page Comment Implemented (Y/N) Explanation
No
Note: Cek lagi urutan
A1 Cover 1 kerja di JSA sesuai Y Implemented
prosedur
Tambahkan list untuk
dokumen lifting and
A1 5. Referensi 7 Y Implemented
rigging beserta no
dokumennya
List O. Tambahkan no
B. Pencegahan
A1 9 dokumen lifting dan Y Implemented
sumber bahaya
rigging
Kolom material Tambahkan list
A1 habis pakai 13 11. Demin Water dan Y Implemented
(consumable) Raw water
Penambahan Tambahkan Kolom
A1 42 Y Implemented
kolom baru baru E. Joint Inspeksi
Tambahkan list
2. Joint inspeksi, hasil
A1 A.Painting 44 Y Implemented
painting pengukuran
DFT
Tambahkan list
B.Instalasi Heat 2. Joint inspeksi untuk
A1 44 Y Implemented
Insulation pemasangan
insulation
Tambahkan list
A1 15. Attachment 46 E. Report hasil inspeksi Y Implemented
/ Berita acara inspeksi
Perbaiki kepanjangan
B 7 Y Implemented
5. Referensi TKO
7. Persyaratan Pastikan personil
B Y Implemented
Personel tersertifikasi
Sudah
8 ditambahkan
8. Alat Pelindung Gas Detector bukan
B Y pada judul poin 8.
Diri APD
Alat Pelindung
Diri & Safety Tool
B. Cleaning:
Poin 5 tambahkan
10.4 Prosedur
Supervisor
B Kerja untuk 16 Y Implemented
C. Inspeksi:
Glycol Reboiller
Poin 1 & 2 Tambahkan
Supervisor, PI
10.5 Prosedur B. Cleaning:
B Kerja untuk Flue 20 Poin 3 Tambahkan Y Implemented
Gas Stack Supervisor
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 4 of 56
CONDENSER, AND SURGE TANK

C. Inspeksi:
B 21 Poin 1 & 2 Tambahkan Y Implemented
10.5 Prosedur
Supervisor, PI
Kerja untuk Flue
E. Reinstal:
Gas Stack
B 22 Poin 10 Tambahkan Y Implemented
Supervisor
B. Cleaning:
Poin 3 Tambahkan
Supervisor
B 26
10.6 Prosedur C. Inspeksi:
Kerja untuk Fire Poin 1 & 2 Tambahkan Y Implemented
Tube Supervisor, PI
E. Reinstal:
B 30 Poin 14 Tambahkan
Supervisor
B. Cleaning:
Poin 4 Tambahkan
Supervisor
B 31
10.7 Prosedur C. Inspeksi:
Kerja untuk Poin 1 & 2 Tambahkan Y Implemented
Reflux Condenser Supervisor, PI
E. Reinstal:
B 36 Poin 10 Tambahkan
Supervisor
B. Cleaning:
Poin 6 Tambahkan
Supervisor
B 38
10.8 Prosedur C. Inspeksi:
Kerja untuk Still Poin 1 & 2 Tambahkan Y Implemented
Column Supervisor, PI
E. Reinstal:
B 40 Poin 10 Tambahkan
Supervisor
C. Inspeksi:
B 43 Poin 1 & 2 Tambahkan Y Implemented
10.9 Prosedur
Supervisor, PI
Kerja untuk
E. Reinstal:
Stripper Column
B 45 Poin 14 Tambahkan Y Implemented
Supervisor
A. Cleaning:
B 10.10 Prosedur 46 Poin 5 Tambahkan Y Implemented
Kerja untuk Surge Supervisor
Tank Poin 1 & 2 Tambahkan
B 47 Y Implemented
Supervisor, PI
10.11 Painting A. Painting:
B dan Instalasi Heat 48 Poin 2 Tambahkan Y Implemented
Insulation Supervisor
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 5 of 56
CONDENSER, AND SURGE TANK

B. Instalasi Heat
Insulation:
B Y Implemented
Poin 2 Tambahkan
10.11 Painting
Supervisor
dan Instalasi Heat 48
C. Reinstalasi Rail
Insulation
Guard:
B Y Implemented
Poin 3 Tambahkan
Supervisor
Seberapa bersih?
11. Acceptance Jelaskan lebih lanjut
B 49 Y Implemented
Criteria kalua oil, karat akan
seperti apa?
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 6 of 56
CONDENSER, AND SURGE TANK

DAFTAR ISI

1. PENDAHULUAN ............................................................................................................. 7
2. RUANG LINGKUP........................................................................................................... 8
3. TUJUAN .......................................................................................................................... 8
4. ISTILAH .......................................................................................................................... 8
5. REFERENSI.................................................................................................................... 9
6. TENAGA KERJA ............................................................................................................. 9
7. PERSYARATAN PERSONEL ....................................................................................... 10
8. ALAT PELINDUNG DIRI & SAFETY TOOL ................................................................... 10
9. BAHAYA DAN RESIKO ................................................................................................. 10
10. ALUR KERJA ................................................................................................................ 12
10.1 GAMBARAN DAN CATATAN TEKNIS ................................................................. 12
10.2 LIST PERALATAN DAN EQUIPMENT PEKERJAAN ........................................... 13
10.3 PERSIAPAN KERJA ............................................................................................ 16
10.4 PROSEDUR KERJA UNTUK GLYCOL REBOILER ............................................. 18
10.5 PROSEDUR KERJA UNTUK FLUE GAS STACK ................................................ 20
10.6 PROSEDUR KERJA UNTUK FIRE TUBE ............................................................ 24
10.7 PROSEDUR KERJA UNTUK REFLUX CONDENSER ......................................... 33
10.8 PROSEDUR KERJA UNTUK STILL COLUMN ..................................................... 38
10.9 PROSEDUR KERJA UNTUK STRIPPER COLUMN ............................................. 42
10.10 PROSEDUR KERJA UNTUK SURGE TANK .................................................... 47
10.11 PAINTING DAN INSTALASI HEAT INSULATION ............................................. 50
10.12 HOUSEKEEPING ............................................................................................. 51
11. ACCEPTANCE CRITERIA ............................................................................................ 51
12. KESELAMATAN KERJA ............................................................................................... 51
13. HOUSEKEEPING ......................................................................................................... 51
14. REPORT ....................................................................................................................... 51
15. ATTACHMENT .............................................................................................................. 52
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 7 of 56
CONDENSER, AND SURGE TANK

1. PENDAHULUAN
Untuk menjaga kualitas gas maka Pertamina EP Zona 7 SP Subang melaksanakan
pekerjaan “Perbaikan Dehydration Unit di SP Subang, Subang Field”. Pekerjaan dilakukan
di wilayah Pertamina EP Zona 7 field Subang, Pelaksanaan Konstruksi akan dilaksanakan
bersamaan dengan kegiatan operasi dan produksi, maka strategi pekerjaan yang tepat perlu
dilaksanakan sehingga semua hambatan yang mungkin terjadi bisa di antisipasi. Dalam
pelaksanaan pekerjaan ini, salah satu pekerjaan yang akan dilakukan PT Mipcon Prima
Industri adalah melakukan Perbaikan Gas Dehydration Unit di SP Subang. Pada
pelaksanaannya, pekerja akan terlibat dalam aktivitas pekerjaan di ketinggian, pekerjaan
pengangkatan dan pekerjaan pembersihan sehingga memiliki resiko yang tinggi. Untuk
mendapatkan hasil pekerjaan yang baik dan menghindari terjadinya kecelakaan kerja, maka
perlu disusun sebuah prosedur yang menjadi acuan tim dalam proses eksekusi pekerjaan di
lapangan.

Gambar 1. Lokasi SP Subang


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 8 of 56
CONDENSER, AND SURGE TANK

2. RUANG LINGKUP
Secara garis besar, ruang lingkup pekerjaan ini meliputi:
 Isolasi system gas line glycol reboiler
 Dismantling fire tube dan flue gas stack pada glycol reboiler, still column, stripper
column, dan reflux condenser
 Cleaning glycol reboiler (including fire tube dan flue gas stack), surge tank, still column,
stripper column, dan reflux condenser
 Inspeksi glycol reboiler (including fire tube dan flue gas stack), surge tank, still column,
stripper column, dan reflux condenser
 Penggantian mini ring pada stripper column dan still column
 Re-install fire tube dan flue gas stack pada glycol reboiler, still column, stripper column,
dan reflux condenser
 Penggantian gasket baru pada sistem glycol reboiler dan bolt tightening
 Repainting glycol reboiler (including fire tube dan flue gas stack), surge tank, still
column, stripper column, dan reflux condenser (refer to procedure DHUSB-00-Q3-PR-
001 Surface Preparation & Painting Procedure)
 Penggantian heat insulation pada glycol reboiler, surge tank, still column, stripper
column, dan reflux condenser (refer to procedure DHUSB-20-C2-PR-005 - Procedure
for Replacement Heat Insulation)
 Perbaikan apabila terdapat kerusakan akibat dismantling glycol reboiler (including fire
tube dan flue gas stack), surge tank, still column, stripper column, dan reflux condenser

3. TUJUAN
Tujuan dari prosedur ini adalah sebagai acuan untuk melakuan kegiatan cleaning glycol
reboiler, surge tank, still column, stripper column, dan reflux condenser.

4. ISTILAH
Dalam prosedur ini, kata-kata atau kalimat maupun istilah harus mempunyai arti
sebagaimana ditentukan di bawah ini, kecuali ditentukan atau disebut lain:
PERUSAHAAN : PERUSAHAAN yang dimaksud adalah PT. Pertamina EP
Zona 7 selaku Pemilik dan Pengguna Fasilitas akhir.
KONTRAKTOR : Pihak yang dipilih oleh PERUSAHAAN sebagai pelaksana
pekerjaan ini yaitu PT. Mipcon Prima Industri
PROYEK : PERBAIKAN GAS DEHYDRATION UNIT DI SP SUBANG
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 9 of 56
CONDENSER, AND SURGE TANK

VENDOR/MANUFACTURE : Pihak yang menyediakan/membuat material atau peralatan


sesuai dengan spesifikasi yang dipersyaratkan

5. REFERENSI
Dokumen dibawah ini merupakan referensi yang memuat informasi secara langsung atau
tidak langsung dengan dokumen prosedur ini:

Permenaker No. 5 tahun 2018 Keselamatan dan Kesehatan Kerja Lingkungan kerja
B-005/A3/EP0300/2020-S9 Tata Kerja Organisasi (TKO) Alat Pelindung Diri
B-007/A3/EP0300/2020-S9 Tata Kerja Organisasi (TKO) Surat Izin Kerja Aman
(SIKA) dan Kontrol Pekerjaan Berbahaya
B-014/A3/EP0300/2020-S9 TKO Job Safety Analysis (JSA)
PEP-00-NI-SP-0001 Painting Spesification for External Metal Surface
ASME B31.3 Process Piping
ASME B16.5 Pipe Flanges & Flanges Fittings
ASME PCC-1 Guidelines for Pressure Boundary Bolted Flange Joint
and Assembly
ASME PCC-2 Repair of Pressure Equipment and Piping
ASME B16.48 Line Blanks
ASME B31.1 Power Piping
ASME VIII Div. I Rule for Construction of Pressure Vessel
Rencana Kerja dan Syarat Syarat – Syarat Teknis dan Komersial “Perbaikan Gas
Dehydration Unit di SP Subang Field Subang”
DHUSB-00-C0-PR-002 Procedure for General Lifting dan Rigging
DHUSB-10-P1-LST-001 List Peralatan LOTO
DHUSB-10-P1-PID-001 P&ID Modification Dehydration System SP Subang
DHUSB-20-L0-DWG-002 Isometric Drawing
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
J:\756\300\H-301 Glycol Reboiler/SurgeTank/Stripper Col./Still Col.
DHUSB-00-C0-PR-002 Procedure for General Lifting and Rigging
6. TENAGA KERJA
a. Mechanical Supervisor : 1 Orang
b. HSSE Officer : 1 Orang
c. Mechanical tech. : 4 Orang
d. Helper : 2 Orang
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 10 of 56
CONDENSER, AND SURGE TANK

e. Scaffolder : 2 Orang
f. QA/QC : 1 orang

7. PERSYARATAN PERSONEL
a. Personil telah memiliki HSE Passpor dan SIM-L
b. Personil harus fit to work dan lulus fit to task.
c. Personil telah memiliki pengalaman kerja sesuai dengan pekerjaan.
d. Personil telah tersertifikasi.
e. Personil telah mengerti dan memahami dengan baik Prosedur & JSA.
f. Personil harus dilengkapi dengan alat pelindung diri sesuai dengan jenis pekerjaannya
g. Personil harus disiplin, taat pada peraturan dan prosedur, tidak ceroboh, tidak lalai,
tidak tergesa-gesa dan tidak mengambil resiko dalam melaksanakan pekerjaan.
h. Selalu melakukan pre-job safety meeting sebelum bekerja.

8. ALAT PELINDUNG DIRI & SAFETY TOOL


a. Coverall
b. Safety helmet
c. Safety glasses
d. Ear plug
e. Full body harness
f. High-impact hand gloves
g. Rubber shoes
h. Rain coat
i. Gas mask
j. Gas detector

9. BAHAYA DAN RESIKO


A. Sumber bahaya:
a. Manusia
i. Tidak sehat
ii. Tidak mengikuti prosedur
iii. Ceroboh / lalai
iv. Tidak menggunakan APD yang sesuai dengan pekerjaan
v. Tidak terlatih dan tidak berpengalaman
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 11 of 56
CONDENSER, AND SURGE TANK

b. Peralatan
i. Peralatan yang digunakan tidak sesuai dengan standar dan spesifikasi
ii. Peralatan yang digunakan tidak sesuai dengan fungsinya
iii. Peralatan yang digunakan tidak dilakukan inspeksi terlebih dahulu
c. Lingkungan
i. Kondisi cuaca yang buruk atau hujan
ii. Kondisi tempat kerja yang licin dan berantakan
iii. Kondisi gas berbahaya pada area kerja yang melebihi ambang batas aman
iv. Tekanan fluida dalam vessel
v. Tekanan fluida dalam peralatan cleaning
vi. Sisa fluida proses dalam vessel dan pipa
d. Lifting dan Rigging
i. Lifting tidak dilakukan sesuai prosedur
ii. Spesifikasi peralatan lifting tidak sesuai dengan kebutuhan pengangkatan
iii. Kondisi peralatan lifting kurang baik dan tidak bersertifikasi yang valid
B. Pencegahan sumber bahaya
a. Lakukan pemasangan LOTO sesuai otoritas dan kebutuhan
b. Pekerjaan wajib diawasi oleh supervisor
c. Gunakan alat komunikasi dua arah (walkie talkie)
d. Pastikan penggunaan APD yang sesuai dengan pekerjaan
e. Melakukan safety talk / toolbox meeting dan pembahasan JSA
f. Gunakan peralatan sesuai dengan standar, spesifikasi, dan kegunaannya
g. Lakukan kalibrasi pada alat ukur yang digunakan
h. Lakukan inspeksi pada peralatan yang akan digunakan
i. Hentikan pekerjaan ketika cuaca tidak aman untuk melakukan pekerjaan
j. Pastikan area kerja bersih dan rapi sebelum melakukan pekerjaan
k. Lakukan pemeriksaan kandungan gas berbahaya pada lingkungan kerja
l. Lakukan barikade pada area kerja dan area kerja hanya boleh dimasuki oleh
pekerja yang bertanggung jawab atas pekerjaan
m. Release dan pastikan tekanan di dalam vessel dan pipa hingga zero pressure
n. Pastikan semua koneksi hose dan fitting pada peralatan kencang dan diberi
pengaman seperti whip check
o. Lakukan lifting sesuai dengan prosedur lifting dan rigging DHUSB-00-C0-PR-002
p. Lakukan house keeping setelah pekerjaan selesai
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 12 of 56
CONDENSER, AND SURGE TANK

10. ALUR KERJA


10.1 GAMBARAN DAN CATATAN TEKNIS
Glycol reboiler berfungsi untuk meningkatkan temperatur rich glycol dari glycol contactor agar
air yang diserap oleh glycol menguap sehingga terpisah dari glycol; air terpisah dari glycol
pada rentang temperatur 370 ºF – 390 ºF. Komponen-komponen dari glycol reboiler
ditunjukkan pada Gambar 2 di bawah.

Gambar 2. Foto Glycol Reboiler H-201


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 13 of 56
CONDENSER, AND SURGE TANK

10.2 LIST PERALATAN DAN EQUIPMENT PEKERJAAN

No Nama Item Ukuran Jumlah Unit

1 Gas detector 2 ea

2 Generator set 7 kW 1 Ea

3 Air compressor 340 cfm, 10 bar 1 ea

4 Air hose c.w. coupling 50 m (tentative) 2 roll

5 Ventilator fan, explosion proof 14" 1 ea

6 Ventilator fan ducting 14" OD x 10 m 1 ea

7 Water jet pump c.w. nozzle gun & hoses 100 bar 6 L/min 2 set

8 Water tank 1000 liter 1 ea

9 Water pump Sanyo 3 ea

10 Water hose 3/4" x 50 m (tentative) 7 roll

11 Water hose 2" x 50 m (tentative) 3 roll

12 IBC tank 1000 liter 1 lot

13 Bucket, plastic 20 liter 2 set

14 Wire brush, long stick, brass 1-1/4" OD x 3 m long, 10 set


flexible stick

15 Wire brush, brass 10 set

16 Scraper, brass 5 ea

17 Webbing sling 3 ton 5 ea

18 Wire sling 3 ton 5 ea

19 Chain block 3 ton 2 ea

20 Shackle 3 ton 5 ea

21 Manila rope 12 mm x 30 m 1 roll

22 Katrol 1 ton 1 ea
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 14 of 56
CONDENSER, AND SURGE TANK

23 Wooden miniet 1 lot

24 Channel beam 2 m long 1 ea

25 Scaffolding 1 lot

26 Angle Grinder 4" 2 ea

27 Slip blind 1/2" 150# 1 ea

28 Pipe wrench 12" 2 ea

29 Pipe wrench 24" 2 ea

30 Combination wrench 8-32 mm 2 set

31 Combination wrench 36 mm 2 ea

32 Combination wrench 46 mm 2 set

33 Socket wrench 8-32 mm 2 set

34 Sledge hammer, brass 3 kg 4 set

35 Adjustable wrench 8" 2 set

36 Adjustable wrench 14" 2 set

37 Hammer wrench 22 mm 2 set

38 Hammer wrench 27 mm 4 set

39 Hammer wrench 32 mm 2 ea

40 Hammer wrench 36 mm 2 ea

41 Hammer wrench 46 mm 2 set

42 Torque wrench c.w. socket adapter 600 Nm 1 ea

43 Cutter gasket 1 ea

Material Permanen

1 Grafoil 3 mm 3 m x 3 m 1 Roll

2 Grafoil 3 mm 3 m x 3 m 1 Roll

3 Gasket 2” 300# RF SPWD 2 Ea


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 15 of 56
CONDENSER, AND SURGE TANK

4 Gasket 1-1/2” 150# RF SPWD 3 Ea

5 Gasket 1” 150# RF SPWD 3 Ea

6 Gasket 12” 150# RF SPWD 1 Ea

7 Stud bolt 5/8” x 90 mm 16 Ea

8 Stud bolt 1/2” x 70 mm 12 Ea

9 Stud bolt 1/2” x 65 mm 12 Ea

10 Stud bolt 7/8” x 120 mm 12 Ea

Material Habis Pakai (consumables)

1 Molykote 1kg, #1000 10 ea

2 Jumbo plastic bag 25 kg 1 lot

3 Kain Majun 1 lot

4 Wooden slab 1 lot

Klingerit 1000# 3 mm x 1.5 m x 5 ea


5
1.5 m

6 Tarpauline 5mx5m 1 lot

7 Barricade Kuning-hitam 1 roll

8 Solar 1 liter 1 ea

9 Masking tape 2 in width 1 roll

10 WD-40 5 can

11 Air Raw water 5000 Liter

12 Air Demineralized water 2500 Liter


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 16 of 56
CONDENSER, AND SURGE TANK

10.3 PERSIAPAN KERJA

No Item Pekerjaan Pelaksana

A Persiapan

1 Pastikan Surat Izin Kerja Aman (SIKA) telah ditandatangani


dan telah diterbitkan oleh pihak yang berwenang

2 Pastikan Job Safety Analysis (JSA) telah dipahami oleh


pekerja dan ditandatangani oleh pihak yang berwenang

3 Pastikan peralatan kerja yang akan digunakan telah


disiapkan, sudah diinspeksi oleh HSE dan dinyatakan aman
untuk digunakan

4 Pastikan lingkungan kerja aman dan sesuai untuk melakukan


pekerjaan (contoh: tidak terdapat bahaya gas beracun dan HSE, Supervisor
mudah terbakar, cuaca bagus, tidak licin dan lainnya) dan
pastikan tekanan telah zero pressure serta pastikan line
glycol sudah terisolate dengan memasang LOTO pada valve
insulasi

5 Apabila terjadi pekerjaan bersamaan (simultaneous


operation), masing-masing lead harus menjalin komunikasi
untuk mencegah pekerja terpapar bahaya yang ditimbulkan
dari pekerjaan lain dan mengatur schedule pekerjaan untuk
meminimalisasi simop.

6 Lakukan pre-job safety meeting sebelum melakukan


pekerjaan HSE, Supervisor

7 Pasang barikade di sekeliling area kerja

8 Pasang scaffolding pada area Gambar 3 berikut Scaffolder


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 17 of 56
CONDENSER, AND SURGE TANK

Gambar 3. Pemasangan scaffolding pada glycol reboiler

9 Lakukan dismantling existing insulation pada equipment

10 Siapkan IBC tank yang sudah terhubung semua hosenya


pada area glycol reboiler dan surge tank

11 Siapkan tempat penyimpanan material existing seperti


Supervisor
bolting, washer, cover, dll.

12 Persiapkan Self-contained Breathing Apparatus

13 Untuk pekerjaan yang dilakukan pada workshop, siapkan


temporary pond untuk menampung limbah hasil cleaning

B Pengamanan Proses Sistem Glycol Reboiler

1 Untuk detail isolasi sistem, refer to attachment C isolation


sheet

2 Pastikan manual valve pada header line fuel gas inlet burner
tube heater telah ditutup rapat dan dipasang tag sesuai
dengan LOTO list

3 Pastikan manual valve pada header line fuel gas outlet Supervisor
burner tube heater telah ditutup rapat dan dipasang tag
sesuai dengan LOTO list

4 Pastikan manual valve pada line stripping gas inlet telah


ditutup rapat dan dipasang tag sesuai dengan LOTO list

5 Pasang slip blind 1” 300# pada line header fuel gas inlet
reboiler skid dengan mengacu pada Gambar 3.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 18 of 56
CONDENSER, AND SURGE TANK

6 Pastikan pressure di dalam vessel zero pressure

7 Pastikan sisa-sisa rich/lean glycol di dalam vessel telah Supervisor

didrain ke tempat yang telah ditentukan.

10.4 PROSEDUR KERJA UNTUK GLYCOL REBOILER

A Dismantling

1 Lakukan dismantling flue gas stack sesuai sub bab 10.5

2 Lakukan dismantling fire tube sesuai sub bab 10.6

3 Lakukan dismantling reflux condenser sesuai sub bab 0 Supervisor

4 Lakukan dismantling still column sesuai sub bab 0

5 Lakukan dismantling stripper column sesuai sub bab 0

B Cleaning

1 Lakukan dismantling flue gas stack dan fire tube terlebih dahulu
untuk mengakses sisi dalam vessel glycol reboiler

2 Pasang exhaust fan 14” dan lakukan sirkulasi udara selama


minimum 24 jam sebelum melakukan kerja sebagai mitigasi
pekerjaan confined space Supervisor
3 Lakukan gas test pada area kerja setelah proses sirkulasi udara
dan lakukan sirkulasi udara kembali apabila level gas masih
belum aman (di bawah LEL 5%)

4 Dismantle existing heat insulation pada dinding luar reboiler

5 Lakukan inspeksi awal pada dinding vessel sebelum melakukan


QA/QC, Supervisor
pekerjaan

6 Bersihkan limbah padat di dalam vessel secara manual


menggunakan hand scrapper dan brush, kemudian masukkan
limbah ke dalam kantung plastik yang telah disediakan Supervisor
7 Pasang selang PVC 2” pada nozzle drain bottom shell reboiler
dan alirkan menuju IBC tank yang berfungsi sebagai
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 19 of 56
CONDENSER, AND SURGE TANK

penampungan limbah cair dari dalam reboiler sesuai dengan


Gambar 4

Gambar 4. Skematik cleaning shell reboiler beserta parts internal

8 Bersihkan dinding dalam dan luar vessel dan internal parts nya
menggunakan water jet (raw water) dan lakukan penggosokan
pada dinding dalam dan luar dengan wire brush hingga bersih
dan bilas dengan demineralized water

9 Keringkan sisi dalam reboiler hingga kering menggunakan air


compressor

C Inspeksi

1 Lakukan inspeksi pada vessel untuk memeriksa kebersihan dan


QA/QC,
kondisi vessel seperti korosi, retak, atau cat terkelupas.
Supervisor, PI
2 Lakukan pengukuran ketebalan shell

3 Bersihkan internal vessel setelah melakukan inspeksi Supervisor

D Reinstall

1 Reinstall fire tube sesuai sub bab 10.6

2 Reinstall flue gas stack sesuai sub bab 10.5

3 Reinstall stripper column sesuai sub bab 0 Supervisor

4 Reinstall still column sesuai sub bab 0

5 Reinstall reflux condenser sesuai sub bab 0


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 20 of 56
CONDENSER, AND SURGE TANK

E Cleaning Area

1 Lakukan housekeeping sesuai dengan sub bab 10.12 Supervisor

10.5 PROSEDUR KERJA UNTUK FLUE GAS STACK

A Dismantling

1 Pastikan scaffolding di area flue gas stack telah terpasang seperti


Supervisor
pada Gambar 3 untuk mengakses shell flange

2 Posisikan dan set up crane untuk dismantling dan laydown 2 unit


flue gas fire stack sesuai dengan prosedur lifting.
Supervisor,
Rigger
Dokumen referensi:
DHUSB-00-C0-PR-002 Procedure for General Lifting dan Rigging

3 Siapkan forklift untuk membantu proses laydown unit yang Supervisor,


diangkat crane Rigger

4 Siapkan susunan balok kayu untuk bantalan laydown flue gas


stack
Supervisor
5 Pastikan sling telah terpasang pada flue gas stack dan crane
sebelum melepas bolting flange shell flue gas stack

6 Lepas bolting dari flange shell flue gas stack (flange A pada
Supervisor
Gambar 5) yang akan diangkat
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 21 of 56
CONDENSER, AND SURGE TANK

7 Angkat dan letakkan flue gas stack pada area laydown seperti
Gambar 5

(a)

Rigger

(b)
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 22 of 56
CONDENSER, AND SURGE TANK

Rigger

(c)
Gambar 5. Skematik pelepasan flue gas stack glycol reboiler

8 Pindahkan flue gas stack ke area cleaning di workshop


menggunakan TMC

B Cleaning

1 Siapkan temporary pond dari scaffolding dan tarpauline untuk


Supervisor
menampung limbah cleaning

2 Posisikan flue gas stack pada temporary pond yang sudah


Supervisor
disiapkan

3 Lakukan inspeksi awal pada sisi dalam flue gas stack QA/QC,
Supervisor

4 Bersihkan sisi dalam flue gas stack menggunakan water jet (raw
water) dan gosok menggunakan wire brush dengan long rod Supervisor
hingga bersih. Bilas dengan demineralized water
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 23 of 56
CONDENSER, AND SURGE TANK

5 Keringkan sisi dalam flue gas stack menggunakan air compressor


hingga kering
Supervisor
6 Bersihkan bolting dari flange shell dan nozzle menggunakan
brush. Aplikasikan molykote #1000 setelah pembersihan.

C Inspeksi

1 Periksa sisi dalam vessel apabila dinding sudah bersih, tidak


tampak ada kotoran
QA/QC,
2 Periksa sisi dalam vessel apabila terdapat kerusakan seperti
Supervisor, PI
korosi, retak, cat terkelupas, maka dilakukan perbaikan (poin D).

3 Lakukan pengukuran thickness

D Perbaikan

1 Lakukan initial inspection

2 Lakukan perbaikan jika terdapat kerusakan Supervisor

3 Lakukan final inspection setelah perbaikan

E Reinstall

1 Pastikan semua pekerjaan dan inspeksi final pada flue gas stack Supervisor,
telah dilakukan sebelum melakukan reinstalasi. QC/QC

2 Siapkan gasket grafoil permanen untuk flange flue gas stack


sesuai pada lampiran A

3 Siapkan bolting flange flue gas stack

4 Angkat flue gas stack dari workshop menuju area reinstalasi


menggunakan TMC
Supervisor
5 Posisikan TMC pada lokasi reinstalasi flue gas stack

6 Setup lifting gear pada flue gas stack

7 Pasang gasket grafoil dan bolting pada flange flue gas stack

8 Angkat dan posisikan flue gas stack ke posisi semula


menggunakan crane
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 24 of 56
CONDENSER, AND SURGE TANK

9 Kencangkan bolting pada flange flue gas stack sesuai dengan


prosedur bolt tightening
Supervisor
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
10 Lakukan final inspection setelah reinstalasi QA/QC,
Supervisor

E Cleaning Area

1 Lakukan housekeeping sesuai dengan sub bab 10.12 Supervisor

10.6 PROSEDUR KERJA UNTUK FIRE TUBE

A Dismantling

1 Lakukan dismantling unit burner 1 dan 2 beserta arrester,


instrumentasi, dan aksesoris lainnya seperti pada Gambar 6

Supervisor

Gambar 6. Lepas instrumentasi pada fire tube


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 25 of 56
CONDENSER, AND SURGE TANK

2 Potong rail guard di depan fire tube menggunakan cold cutter


sehingga fire tube dapat dikeluarkan seperti yang ditunjukkan
oleh Gambar 7

Supervisor

Gambar 7. Potong rail di depan fire tube

3 Lepas bolting pada front cover shell reboiler. Supervisor

4 Posisikan crane untuk menarik front cover shell reboiler sesuai


dengan prosedur lifting

Dokumen referensi:
Rigger
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging

5 Pasang pulling lug front cover dengan lifting wire rope

6 Tarik fire tube keluar sekitar 1 m dari flange reboiler


Rigger, Supervisor
menggunakan forklift
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 26 of 56
CONDENSER, AND SURGE TANK

7 Pasang salah satu wire sling dari rangkaian 2 set wire sling
dan 1 unit chain block 3 ton pada lifting hook crane dengan
lifting lug di unit fire tube. Lihat Gambar 8 untuk skematik
rangkaian set wire sling dan chain block.

Rigger, Supervisor

Gambar 8. Skematik rangkaian webbing sling dan chain block


yang dipasang pada hook crane

8 Tarik unit fire tube keluar sejauh sekitar 3 m menggunakan


forklift dibantu dengan temporary gantry dan chain block.
Penarikan dilakukan beriringan dengan pengangkatan fire tube
untuk menyeimbangkan fire tube.
Rigger, Supervisor
9 Pasang wire sling dari rangkaian dengan fire tube di area
mitered pipe bend seperti pada Gambar 9.

10 Lakukan pengawasan pada saat fire tube akan dikeluarkan


dan pastikan fire tube dapat dikeluarkan
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 27 of 56
CONDENSER, AND SURGE TANK

11 Tarik, angkat dan letakkan unit fire tube menggunakan crane


menuju area laydown pada Gambar 10.

Gambar 9. Skematik pengeluaran fire tube menggunakan


Rigger
crane

Gambar 10. Skematik laydown fire tube

12 Pindahkan fire tube ke area cleaning di workshop


Rigger
menggunakan TMC
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 28 of 56
CONDENSER, AND SURGE TANK

B Cleaning

1 Siapkan temporary pond penampungan limbah cleaning dari


Supervisor
scaffolding dan tarpauline di daerah inlet/outlet fire tube

2 Posisikan fire tube pada temporary pond yang sudah


Supervisor
disiapkan

3 Lakukan inspeksi awal pada kondisi fire tube sebelum


QA/QC, Supervisor
melakukan cleaning

4 Bersihkan fire tube di dalam temporary pond menggunakan


water jet (raw water) dan gosok menggunakan wire brush
hingga bersih tidak terdapat kotoran. Bilas dengan
demineralized water
Supervisor
5 Keringkan fire tube menggunakan air compressor

6 Bersihkan bolting dari flange shell dan nozzle menggunakan


brush. Aplikasikan molykote #1000 setelah pembersihan.

C Inspeksi

1 Lakukan inspeksi pada fire tube untuk memerika apabila


terjadi korosi, retak atau kerusakan permukaan, maka QA/QC, Supervisor
dilakukan perbaikan (poin D).

2 Lakukan pengukuran ketebalan QA/QC, Supervisor,


PI

D Perbaikan

1 Lakukan intial inspection

2 Lakukan perbaikan jika terdapat kerusakan Supervisor

3 Lakukan final inspection setelah perbaikan

E Reinstall

1 Pastikan semua pekerjaan dan inspeksi pada fire tube telah


Supervisor, QA/QC
dilakukan sebelum melakukan reinstalasi.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 29 of 56
CONDENSER, AND SURGE TANK

2 Siapkan gasket grafoil permanen cover reboiler dengan sesuai


Supervisor
dengan lampiran A

3 Angkat fire tube dari workshop menuju area reinstalasi


Rigger
menggunakan TMC

4 Posisikan crane dan forklift untuk reinstall fire tube Rigger, Supervisor

5 Pasang alat bantu seperti stopper pada sisi back cover


reboiler untuk menjadi tumpuan penarikan fire tube ke dalam
shell reboiler seperti pada Gambar 11.

Supervisor

Gambar 11. Dimensi alat bantu stopper

Gambar 12. Skematika peletakan stopper pada reboiler


6 Pasang gasket grafoil pada cover front fire tube Supervisor
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 30 of 56
CONDENSER, AND SURGE TANK

7 Angkat dan posisikan fire tube terhadap support dalam reboiler


seperti Gambar 13 menggunakan crane

Gambar 13. Skematika reinstalasi fire tube

8 Atur posisi fire tube setelah posisi fire tube di atas support
Rigger, Supervisor
menggunakan chain block yang terpasang pada rangkaian
webbing sling untuk melepas posisi webbling sling di sisi
mitering bend sesuai dengan Gambar 14.

(a)
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 31 of 56
CONDENSER, AND SURGE TANK

Rigger, Supervisor

(b)
Gambar 14. Skematik reinstalasi fire tube setelah diatas
support

9 Rangkai stopper di end cover dengan dua buah block


chain/lever block di sisi kanan dan kiri, kemudian sambungkan
Supervisor
webbing chain dengan wire sling

10 Sambungkan webbing sling dengan pulling lug fire tube

11 Tarik fire tube ke arah back cover menggunakan lever


block/chain block dan webbing sling disertai dengan Rigger, Supervisor
pengimbangan oleh crane
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 32 of 56
CONDENSER, AND SURGE TANK

12 Posisikan gasket terhadap gasket seat shell flange dan


pasang bolting pada flange front cover reboiler sesuai dengan
Gambar 15.

Supervisor
Gambar 15. Skematik fire tube setelah reinstalasi

12 Lepas semua alat bantu reinstalasi seperti stopper dan


webbing sling

13 Kencangkan semua bolting pada blind end shell reboiler


sesuai dengan prosedur tightening.

Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening

14 Lakukan joint inspection setelah reinstalasi QA/QC, Supervisor

E Cleaning Area

1 Lakukan housekeeping sesuai dengan sub bab 10.12 Supervisor


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 33 of 56
CONDENSER, AND SURGE TANK

10.7 PROSEDUR KERJA UNTUK REFLUX CONDENSER

A Dismantling

1 Dismantle spool piping pada venting di sisi atas, di inlet dan di


outlet shell reflux condenser seperti yang ditunjukkan oleh
Gambar 16.

Tutup flange joint yang terbuka menggunakan blue sheet

Supervisor

Gambar 16. Flange yang didismantling untuk melepas reflux


condenser
2 Set up crane untuk mengangkat dan laydown piping spool dan
reflux condenser sesuai dengan prosedur lifting

Rigger
Dokumen referensi:
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging

3 Siapkan balok kayu untuk bantalan laydown piping spool Supervisor

4 Pasang lifting lug di body column dengan wire rope Rigger

5 Angkat piping spool menggunakan crane dan letakkan pada


Operator Crane
laydown area

6 Lepas bolting pada botton shell flange reflux condenser. Supervisor


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 34 of 56
CONDENSER, AND SURGE TANK

7 Angkat reflux condenser dan piping spool menggunakan crane


dan bawa menuju workshop cleaning menggunakan TMC
seperti pada Gambar 17.

Rigger
(a)

(b)
Gambar 17. Skematik dismantling dan laydown unit reflux
condenser
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 35 of 56
CONDENSER, AND SURGE TANK

B Cleaning

1 Siapkan temporary pond penampungan limbah dari scaffolding


dan tarpauline pada area shell cover

2 Posisikan reflux condenser pada temporary pond yang sudah


disiapkan

3 Buka cover channel reflux condenser seperti pada Gambar


1816.
Supervisor

Gambar 1816. Skematik pelepasan channel cover reflux


condenser

4 Lakukan inspeksi awal pada kondisi reflux condenser sebelum


QA/QC, Supervisor
melakukan pekerjaan cleaning

5 Bersihkan sisi dalam tube reflux condenser di dalam temporary


pond dengan wire brush kuningan seperti pada Gambar 20.

Gambar 19. Skematik brushing tube reflux condenser


Supervisor

Gambar 170. Dimensi stainless steel wire brush


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 36 of 56
CONDENSER, AND SURGE TANK

6 Bersihkan sisi dalam tube reflux condenser di dalam temporary


pond dengan water jet (raw water) hingga bersih seperti pada
Gambar 21.

Supervisor
Gambar 21. Skematik cleaning sisi dalam tube reflux condenser

7 Bersihkan sisi dalam shell di dalam temporary pond dengan


water jet (raw water) hingga bersih. Bilas dengan demineralized
water

8 Keringkan inside tube reflux condenser dengan meniupkan udara


dari kompresor ke dalam tube

9 Bersihkan bolting dari flange shell dan nozzle menggunakan


brush. Aplikasikan molykote #1000 setelah pembersihan.

C Inspeksi

1 Lakukan inspeksi pada reflux condenser apakah terdapat


korosi, retak, atau kerusakan permukaan lainnya menggunakan
boroscope. Apabila ada kerusakan maka dilakukan perbaikan QA/QC,
(poin D). Supervisor, PI

2 Lakukan pengukuran ketebalan pada reflux condenser (shell


dan tube)

3 Lakukan pengujian eddy current pada tube bundle reflux


condenser (disediakan oleh PERUSAHAAN)

NDT Personnel
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 37 of 56
CONDENSER, AND SURGE TANK

D Perbaikan

1 Lakukan initial inspection

2 Lakukan perbaikan jika terdapat kerusakan Supervisor

3 Lakukan final inspection setelah perbaikan

E Reinstall

1 Pastikan semua pekerjaan dan inspeksi pada reflux condenser


Supervisor, QA/QC
telah dilakukan sebelum melakukan reinstalasi.

2 Pastikan still column telah terpasang pada reboiler


Supervisor
3 Pasang top cover reflux condenser menggunakan gasket baru

4 Angkat reflux condenser dari workshop menuju area reinstalasi


menggunakan TMC

5 Set up crane untuk mengangkat piping spool dan reflux


condenser sesuai dengan prosedur lifting Operator Crane

Dokumen referensi:
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging

6 Pasang reflux condenser pada lifting gear dan crane untuk


mengangkat dan memasang condenser dengan flange top shell Rigger
still column.

7 Angkat reflux condenser menggunakan crane dan pasang


kembali flange bottom nozzle reflux condenser dengan flange
top nozzle still column menggunakan gasket baru.

Kencangkan semua bolting sesuai dengan prosedur bolt Rigger, Supervisor

tightening

Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
8 Pasang kembali flange joint piping dan shell nozzle
Supervisor
menggunakan gasket baru.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 38 of 56
CONDENSER, AND SURGE TANK

9 Kencangkan semua bolting sesuai dengan prosedur bolt


tightening
Supervisor
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening

10 Lakukan final inspection setelah reinstalasi QA/QC, Supervisor

F Cleaning Area

1 Lakukan housekeeping sesuai dengan sub bab 10.12 Supervisor

10.8 PROSEDUR KERJA UNTUK STILL COLUMN

A Dismantling

1 Pastikan reflux condenser beserta piping yang terhubung telah


Supervisor
didismantle sebelum dismantling still column

2 Set up crane untuk dismantling still column sesuai dengan


prosedur lifting
Dokumen referensi:
DHUSB-00-C0-PR-002 Procedure for General Lifting dan Rigger
Rigging

3 Pasang lifting lug di top flange pada still column dengan wire
rope pada crane
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 39 of 56
CONDENSER, AND SURGE TANK

4 Lepas bolting bottom shell flange still column dan top shell
flange glycol reboiler, dan lepas flange joint pipa N17 yang
tersambung pada still column

Supervisor

Gambar 22. Skematik Flange Joint pipa N17

5 Angkat still column dan letakkan di TMC kemudian pindahkan


ke area cleaning di workshop

B Cleaning

1 Siapkan temporary pond penampungan mini ring dan limbah


cleaning dari scaffolding dan tarpauline pada area shell cover

2 Posisikan still column pada temporary pond yang sudah


disiapkan

3 Angkat still column dan letakkan pada laydown scaffolding yang


telah disiapkan sesuai dengan Gambar 23 (berada dalam
temporary pond)
Supervisor

Gambar 23. Skematik posisi vessel


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 40 of 56
CONDENSER, AND SURGE TANK

4 Lakukan marking ketinggian pall ring pada vessel still column

5 Keluarkan pall ring dan tempatkan pada jumbo bag seperti pada
gambar 24

Supervisor

Gambar 24. Skematik penampungan mini ring

6 Lakukan inspeksi awal pada still column QA/QC, Supervisor

7 Bersihkan internal vessel dan parts nya di dalam temporary


pond dengan water jet (raw water) dan lakukan penggosokan
dengan wire brush hingga bersih. Bilas dengan demineralized
Supervisor
water

8 Bersihkan bolting dari flange shell dan nozzle menggunakan


brush. Aplikasikan molykote #1000 setelah pembersihan.

C Inspeksi

1 Lakukan inspeksi akhir pada still column apabila terdapat korosi,


retak atau kerusakan permukaan, maka dilakukan perbaikan QA/QC,
(poin D). Supervisor, PI
2 Lakukan pengukuran ketebalan shell.

D Perbaikan

1 Lakukan initial inspection

2 Lakukan perbaikan jika terdapat kerusakan Supervisor

3 Lakukan final inspection setelah perbaikan

E Reinstall

1 Pastikan semua pekerjaan dan inspeksi pada still column telah


QA/QC, Supervisor
dilakukan sebelum melakukan reinstalasi.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 41 of 56
CONDENSER, AND SURGE TANK

2 Angkat still column dari workshop menuju area reinstalasi


menggunakan TMC

3 Set up crane untuk dismantling still column sesuai dengan


prosedur lifting
Dokumen referensi:
Operator Crane
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging

4 Siapkan lifting gear dan crane untuk mengangkat dan


memposisikan still column menyambungkan dengan flange
reboiler.

5 Pasang gasket pada flange still column dan flange reboiler Supervisor

6 Angkat still column menggunakan crane dan pasang kembali Operator Crane,
flange shell still column dengan flange shell reboiler. Supervisor

7 Pasang kembali flange joint pada nozzle N17

Supervisor
Gambar 25. Skematik Flange Joint pipa N17
8 Kencangkan semua bolting sesuai dengan prosedur bolt
tightening

Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening

9 Masukkan mini ring ke dalam vessel sesuai dengan ketinggian


marking yang sudah dibuat saat dismantle
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 42 of 56
CONDENSER, AND SURGE TANK

10 Lakukan final inspeksi terhadap volume dan ketinggian level dari


mini ring sesuai dengan ketinggian marking yang sudah dibuat
QA/QC, Supervisor
saat dismantle

F Cleaning Area

1 Lakukan housekeeping sesuai dengan sub bab 10.12 Supervisor

10.9 PROSEDUR KERJA UNTUK STRIPPER COLUMN

A Dismantling

1 Set up crane untuk dismantling stripping column sesuai dengan


prosedur lifting
Dokumen referensi:
Rigger
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging

2 Pasang lifting webbing sling dengan flange cover shell atas

3 Dismantle flange joint piping nozzle N12, N13, N14 dan N15
pada stripping column.

Supervisor

Gambar 26. Skematik Nozzle N12, N13, N14, N15


4 Lepas bolting clip / bracket support pada shell rear cover
reboiler diiringi dengan penyeimbangan beban stripping column Rigger, Supervisor
oleh crane.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 43 of 56
CONDENSER, AND SURGE TANK

5 Dismantle/angkat stripping column dan letakkan pada area


workshop cleaning menggunakan TMC sesuai dengan Gambar
27.

Rigger

(a)

Rigger
(b)
Gambar 27. Skematik dismantling Still Column
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 44 of 56
CONDENSER, AND SURGE TANK

B Cleaning

1 Siapkan temporary pond penampungan limbah dari scaffolding


dan tarpauline pada area shell cover

2 Siapkan dan letakkan penampungan mini ring seperti pada


gambar 28.

Gambar 2818. Skema penampungan mini ring

3 Angkat still column dan letakkan pada laydown scaffolding yang Rigger, Supervisor
telah disiapkan sesuai dengan gambar 29 (berada dalam
temporary pond)

Rigger, Supervisor

Gambar 29. Skematik Posisi Stripping Column

4 Buka top stripping column


Supervisor
5 Lakukan marking ketinggian pall ring pada vessel still column
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 45 of 56
CONDENSER, AND SURGE TANK

6 Posisikan shell dengan mengangkat salah satu sisi shell flange


dan buka bottom stripping column untuk mengeluarkan mini ring
dari stripping column ke bak penampung mini ring
sepertigambar 30.
Rigger

Gambar 30. Skema pengeluaran mini ring dari stripping column

7 Lakukan inspeksi awal pada stripping column Supervisor

8 Bersihkan internal vessel dan parts nya di dalam temporary


pond dengan water jet (raw water) dan lakukan penggosokan
Supervisor, Helper
dengan steel wire brush hingga bersih. Bilas dengan
demineralized water

9 Bersihkan bolting dari flange shell dan nozzle menggunakan


Supervisor, Helper
brush. Aplikasikan molykote #1000 setelah pembersihan.

C Inspeksi

1 Lakukan inspeksi pada shell stripping column apabila terdapat


korosi, retak atau cacat permukaan, maka dilakukan perbaikan QA/QC,
(poin D). Supervisor, PI

2 Lakukan pengukuran ketebalan shell

D Perbaikan

1 Lakukan initial inspection

2 Lakukan perbaikan jika terdapat kerusakan Supervisor

3 Lakukan final inspection setelah perbaikan

E Reinstall

1 Pastikan tidak ada pekerjaan dan inspeksi yang tersisa pada


Supervisor, QA/QC
stripper column sebelum melakukan reinstalasi.

2 Install bottom cover stripper column Supervisor


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 46 of 56
CONDENSER, AND SURGE TANK

3 Angkat still column dari workshop menuju area reinstalasi


menggunakan TMC

4 Set up crane untuk dismantling stripping column sesuai dengan


Operator TMC,
prosedur lifting
Supervisor
Dokumen referensi:
DHUSB-00-C0-PR-002 Procedure for General Lifting dan
Rigging

5 Siapkan lifting gear dan crane untuk mengangkat dan


memposisikan stripping column ke tempat semula. Rigger

6 Angkat stripping column ke tempat semula.

7 Pasang support clip / bracket shell stripping column pada shell


cover reboiler

8 Install flange joint piping nozzle N12, N13, N14 dan N15 pada
stripping column.

Supervisor

Gambar 31. Skema Nozzle N12, N13, N14, N15

9 Masukkan mini ring ke dalam vessel sesuai dengan ketinggian


marking yang sudah dibuat saat dismantle
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 47 of 56
CONDENSER, AND SURGE TANK

10 Lakukan inspeksi terhadap volume dan ketinggian level dari


mini ring sesuai dengan ketinggian marking yang sudah dibuat
saat dismantle

11 Install top cover stripper column

12 Kencangkan semua bolting clip/ bracket sesuai dengan


prosedur tightening
Supervisor
Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening
13 Kencangkan semua bolting sesuai dengan prosedur bolt
tightening

Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening

14 Lakukan final inspeksi setelah instalasi QA/QC, Supervisor

E Cleaning Area

1 Lakukan housekeeping sesuai dengan sub bab 10.12 Supervisor

10.10 PROSEDUR KERJA UNTUK SURGE TANK

A Cleaning

1 Periksa kondisi gas di dalam glycol surge tank sebelum


Supervisor, HSE
melakukan pekerjaan.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 48 of 56
CONDENSER, AND SURGE TANK

2 Pasang pipa PVC 2” ke nozzle drain bottom shell glycol surge


tank dan alirkan menuju ICB tank untuk penampungan limbah
cair dari dalam surge tank sesuai dengan Gambar 32.

Supervisor

Gambar 32. Skematik cleaning glycol surge tank beserta


internal parts

3 Kosongkan glycol di dalam glycol surge tank ke ICB tank.

4 Buka bolting cover end surge tank.

Supervisor

Gambar 33 End Cover Surge Tank

5 Lakukan inspeksi awal pada surge tank QA/QC, Supervisor

6 Bersihkan sisa endapan glycol di dalam vessel ke dalam


Supervisor
kantung plastik 25 kg menggunakan skop dan wire brush.
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 49 of 56
CONDENSER, AND SURGE TANK

7 Bersihkan internal vessel dan parts nya dengan water jet (raw
water) dan lakukan penggosokan dengan steel wire brush
hingga bersih. Bilas dengan demineralized water.

8 Keringkan sisi dalam surge tank hingga kering menggunakan Supervisor


air compressor

9 Bersihkan bolting dari flange shell dan nozzle menggunakan


brush. Aplikasikan molykote #1000 setelah pembersihan.

C Inspeksi

1 Lakukan inspeksi pada surge tank apabila terdapat kerusakan


permukaan, korosi, atau retak, maka dilakukan perbaikan QA/QC,
(poin D) Supervisor, PI
2 Lakukan pengukuran ketebalan shell

D Perbaikan

1 Lakukan initial inspection

2 Lakukan perbaikan jika terdapat kerusakan


Supervisor
3 Lakukan final inspection setelah perbaikan

E Reinstall

1 Lepas pipa PVC 2” ke nozzle drain bottom shell glycol surge


tank

2 Tutup cover end surge tank dan lakukan pengencangan bolting


sesuai dengan prosedur bolt tightening Supervisor

Dokumen referensi:
DHUSB-00-C0-PR-003 Procedure for General Bolt Tightening

F Cleaning Area

1 Lakukan housekeeping sesuai dengan sub bab 10.12 Supervisor


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 50 of 56
CONDENSER, AND SURGE TANK

10.11 PAINTING DAN INSTALASI HEAT INSULATION

A Painting

1 Lakukan painting pada semua peralatan sesuai dengan


prosedur painting

Supervisor
Dokumen referensi:
DHUSB-00-Q3-PR-001 Surface Preparation & Painting
Procedure

2 Lakukan final inspeksi setelah painting pada hasil


QA/QC, Supervisor
pengukuran DFT

B Instalasi Heat Insulation

1 Lakukan instalasi heat insulation pada semua peralatan


sesuai dengan prosedur instalasi heat insulation
Dokumen referensi: Supervisor
DHUSB-20-C2-PR-005 Procedure for Replacement Heat
Insulation Mechanical Equipment and Piping

2 Lakukan final inspeksi setelah instalasi heat insulation QA/QC, Supervisor

C Reinstalasi Rail Guard

1 Pasang welding habitat di area platform glycol reboiler


Supervisor
2 Lakukan pengelasan pada rail guard yang dipotong

3 Lakukan inspeksi terhadap hasil pengelasan QA/QC, Supervisor

4 Lakukan painting pada rail guard Supervisor


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 51 of 56
CONDENSER, AND SURGE TANK

10.12 HOUSEKEEPING

A Housekeeping

1 Rapikan semua peralatan kerja


Supervisor
2 Bersihkan area kerja setiap selesai pekerjaan

11. ACCEPTANCE CRITERIA

Acceptance criteria dari prosedur ini adalah:


 Vessel dan filter dalam kondisi bersih, untuk mengetahui tingkat kebersihannya dapat
dilakukan dengan cara mengelap vessel dan filter dengan kain warna putih dan tidak
ditemukan kotoran pada kain tersebut
 Internal parts glycol reboiller telah dipasang yang baru
 Tidak terdapat kerusakan pada vessel
 Bolt tightening telah dilakukan sesuai dengan prosedur

12. KESELAMATAN KERJA


Pekerjaan ini meliputi pekerjaan di ketinggian, pekerjaan pengangkatan, dan pekerjaan
cleaning. Kontaktor harus menyediakan tenaga kerja rigger, operator crane, dan teknisi yang
berpengalaman. HSE akan memastikan bahwa alat pelindung diri memenuhi persyaratan
yang dibutuhkan.

13. HOUSEKEEPING
Setiap pekerjaan selesai dilaksanakan, semua pekerja harus melakukan general
houskeeping. HSE dan supervisor wajib memastikan lingkungan area kerja harus
ditinggalkan dalam kondisi bersih.
Limbah sisa dari pekerjaan cleaning wajib dibuang ke tempat yang telah ditentukan dan wajib
dikoordinasikan dengan pihak yang berwenang terkait material handling-nya

14. REPORT
Hasil dari pekerjaan ini akan dituangkan dalam bentuk laporan pekerjaan yang berupa:
- Cleaning report
- Inspection report
- Weekly report
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 52 of 56
CONDENSER, AND SURGE TANK

15. ATTACHMENT

a. General Arrangement Drawing dan Data Teknis


b. JSA
c. Isolation Sheet
d. Layout Cleaning
PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 53 of 56
CONDENSER, AND SURGE TANK

Lampiran A – General Arrangement Drawing dan Data Teknis


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 54 of 56
CONDENSER, AND SURGE TANK

Lampiran B – JSA
No. Formulir
PT. PERTAMINA EP Revisi
T.M.T
DHU PERTAMINA ZONA 7 EP SUBANG Halaman 1 dari 3
JOB SAFETY ANALYSIS

TANGGAL / No. JSA 14 Desember 2023 / DHUSB-20-C2-PRO-008 PELAKSANA PEKERJAAN PT. MIPCON PRIMA INDUSTRI
Cleaning Glycol Contactor. PENGAWAS PEKERJAAN PERTAMINA EP ZONA 7
PEKERJAAN
Item No. V301 & V401 LOKASI SP SUBANG

PROTECTIVE EQUIPMENT REQUIRED TO PERFORM THIS JOB (ALAT PELINDUNG YANG DIPERLUKAN UNTUK MELAKSANAKAN PEKERJAAN)
√ SAFETY HELMET √ EAR PLUG/EAR MUFF RUBBER GLOVES FIRE EXTINGUISHER
√ SAFETY SHOES RUBBER BOOT √ FULL BODY √ LOCK OUT/TAG OUT
√ SAFETY GLASSES FACE SHIELD HARNES
CHEMICAL COAT OIL SPILL KIT
COTTON GLOVES APRON RESPIRATOR/SCB √ WORK PERMITT REQUIRED
LEATHER GLOVES √ DUST / GAS MASK √ A
GOOGLES √ OTHER :

STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
TDK
ADA N/A
ADA
Pastikan peralatan kerja sudah sesuai dengan jenis HSE, SPV
pekerjaan dan dalam kondisi baik. Pastikan peralatan
Jenis peralatan kerja tidak sesuai dengan kerja sudah diinspeksi dan peralatan kerja standard/
a R
jenis pekerjaan atau alat kerja rusak. tidak hasil hand made atau hasil modifikasi

1 Persiapan Pekerjaan Pastikan alat pelindung diri sudah memenuhi dengan HSE, SPV
Alat pelindung diri tidak sesuai dengan persyaratan safety dan gunakan APD yang sesuai
b R
persyaratan keselamatan dengan jenis pekerjaan
Pastikan area kerja cukup dan aman untuk pekerjaan HSE, SPV
c Area bekerja tidak aman R yang akan dilakukan. Lakukan last minute risk
assesment
Pastikan Permit sudah dibuat dan sudah sesuai HSE, SPV
Permit belum dibuat dan tidak sesuai dengan jenis pekerjaan
2 Permit to Work (SIKA) a R
dengan pekerjaan yang dilakukan

Berikan pengertian penggunaan APD sesuai dengan HSE, SPV


Materi Toolbox meeting kurang dipahami jenis pekerjaan yang akan dilakukan, sosialisasikan
3 Toolbox Meeting a R SOP dan analisa kerja aman saat TBM
oleh pekerja.
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
Hindari titik jepit (Pinch Point) saat memegang Clamp. HSE, SPV
a Jari tangan terjepit clamp scaffolding. R Gunakan sarung tangan Heavy Duty
Tidak berdiri dibawah pemasangan clamp dan pipa HSE, SPV
b Tertimpa clamp dan pipa scaffolding. R scaffolding. Barricade system dan safety sign dipasang
di area kerja
Bekerja dengan berhati-hati, tidak berada dibawah HSE, SPV
c Terjepit Asiba R pemasangan scaffolding, ikat dengan proper saat
pemasangan asiba
Pemasangan scaffolding hanya dilakukan oleh HSE, SPV
d Scaffolding Roboh H scaffolder yang bersertifikat dan SIO masih aktif
4 Pemasangan Scaffolding
SIKA dan JSA sudah dibuat sebelum bekerja. Daily HSE, SPV
Check-up (DCU) sudah dilakukan sebelum bekerja.
Pastikan personil yang bekerja diketinggian sudah
mendapatkan training bekerja diketinggian .Pasang
Safety sign bekerja diketinggian dan drop object.
e Jatuh dari ketinggian H Barricade system harus diterapkan di area kerja.
Gunakan platform kerja yang aman saat bekerja di
ketinggian. Gunakan full body harness saat bekerja di
ketinggian dan 100% Tie Off

Dismantling Equipment
Gunakan APD Mandatory dan gunakan APD tambahan HSE, SPV
Masker Vapour Organic masker untuk mengurangi
dampak paparan fluida berbahaya dan gunakan face
a Terpapar fluida berbahaya M shield. Gas Detector selalu standby di area kerja yang
berisiko ada paparan gas/ paparan fluida berbahaya

SIKA dan JSA sudah dibuat sebelum bekerja. Daily HSE, SPV
Check-up (DCU) sudah dilakukan sebelum bekerja.
Pastikan personil yang bekerja diketinggian sudah
Buka manhole, pasang fan blower,
mendapatkan training bekerja diketinggian .Pasang
5 dan periksa kandungan oksigen
Safety sign bekerja diketinggian dan drop object.
dalam vessel b Jatuh dari ketinggian H
Barricade system harus diterapkan di area kerja.
Gunakan platform kerja yang aman saat bekerja di
ketinggian. Gunakan full body harness saat bekerja di
ketinggian dan 100% Tie Off

Pastikan area berlubang diberi cover dan ditutup HSE, SPV


Peralatan dan material masuk kedalam dengan baik untuk antisipasi peralatan / material masuk
c R kedalam vessel dan gunakan bag peralatan untuk
vessel
menempatkan material kecil
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
Ada Signalman ada diarea kerja saat alat berat HSE, SPV
beroperasi. Pasang barricade diarea pekerjaan
pengangkatan dan pasang juga safety sign di area
a Pekerja tertabrak pesawat angkat M kerja.Sosialisasikan di briefing pagi mengenai line of
fire dan safe zone position bekerja dengan alat berat.
SOP bekerja dengan aman sudah disosialisasikan
pada saat safety briefing
Pastikan pengikatan dilakukan sesuai dengan SOP dan HSE, SPV
pengikatan dilakukan oleh rigger bersertifikat valid.
Pastikat alat bantu pengangkatan sudah diinspeksi dan
b Komponen contactor terjatuh M dalam keadaan baik saat digunakan. Gunakan dan
tentukan sling sesuai dengan maksimal kapasitas
beban yang akan diangkat dan sesuai dengan lifting
plan
'Pastikan pekerja sudah melakukan Daily Checkup dan HSE, SPV
pekerja sudah mendapatkan training bekerja di
c Jatuh dari ketinggian H ketinggian. Pemasangan safety sign di area kerja
Menggunakan full body harness dan 100% Tie Off
Memasang safety sign di area kerja
'Pastikan area berlubang diberi cover dan ditutup HSE, SPV
dengan baik untuk antisipasi peralatan / material masuk
Peralatan dan material masuk kedalam
d M kedalam vessel dan gunakan bag peralatan untuk
Lepas demister, liquid distributorm vessel
menempatkan material kecil
6 dan manway tray kemudian
letakkan pada area laydown
Pastikan pengikatan dilakukan sesuai dengan SOP dan HSE, SPV
pengikatan dilakukan oleh rigger bersertifikat
valid.Pastikat alat bantu pengangkatan sudah
e Peralatan terjatuh M diinspeksi dan dalam keadaan baik saat digunakan.
Gunakan dan tentukan sling sesuai dengan maksimal
kapasitas beban yang akan diangkat dan sesuai
dengan lifting plan
SIKA dan JSA sudah dibuat sebelum bekerja. Lakukan HSE, SPV
pengujian kadar gas dan berbahaya dan lakukan
pencatatan monitoringnya. Pastikan gas detector yang
digunakan kalibrasi aktif. Pastikan ada watchman/
standbyman yang mencatat keluar masuk personil di
manhole, dan melakukan pencatatan monitoring gas
secara berkala. Personil didalam ruang terbatas
f maksimal 1 jam harus keluar dari ruang terbatas untuk
Bekerja dalam ruang terbatas H
menghirup udara segar. Stop pekerjaan jika kandungan
gas/ fluida berbahaya dan beracun diluar ambang batas
yang diperbolehkan untuk bekerja. Pekerja sudah
melakukan fit to task sebelum bekerja. Pastikan sistem
ventilasi sudah berjalan dengan baik. Terpasang blower
in our disetiap manhole
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
Cleaning Equipment
'Pastikan pekerja sudah melakukan Daily Checkup dan HSE, SPV
pekerja sudah mendapatkan training bekerja di
a Jatuh dari ketinggian H ketinggian. Pemasangan safety sign di area kerja
Menggunakan full body harness dan 100% Tie Off
Memasang safety sign di area kerja
Pastikan pengikatan dilakukan sesuai dengan SOP dan HSE, SPV
Pasang flange pada nozzle rich pengikatan dilakukan oleh rigger bersertifikat
7 glycol outlet contactor dan spiral valid.Pastikat alat bantu pengangkatan sudah
hose b Peralatan terjatuh M diinspeksi dan dalam keadaan baik saat digunakan.
Gunakan dan tentukan sling sesuai dengan maksimal
kapasitas beban yang akan diangkat dan sesuai
dengan lifting plan
'Perhatikan ergonomi tubuh. Gunakan APD mandatory HSE, SPV
c Tangan terpukul hammer R dan gunakan sarung tangan mekanikal/ heavy duty.

'Pastikan pekerja sudah melakukan Daily Checkup dan HSE, SPV


pekerja sudah mendapatkan training bekerja di
a Jatuh dari ketinggian H ketinggian. Pemasangan safety sign di area kerja
Menggunakan full body harness dan 100% Tie Off
Memasang safety sign di area kerja

'Pastikan area berlubang diberi cover dan ditutup HSE, SPV


dengan baik untuk antisipasi peralatan / material masuk
Peralatan dan material masuk kedalam
b M kedalam vessel dan gunakan bag peralatan untuk
vessel
menempatkan material kecil

Pastikan pengikatan dilakukan sesuai dengan SOP dan HSE, SPV


pengikatan dilakukan oleh rigger bersertifikat
valid.Pastikat alat bantu pengangkatan sudah
c Peralatan dan material terjatuh diinspeksi dan dalam keadaan baik saat digunakan.
Gunakan dan tentukan sling sesuai dengan maksimal
kapasitas beban yang akan diangkat dan sesuai
dengan lifting plan
Gunakan APD Mandatory dan gunakan APD tambahan HSE, SPV
Masker Vapour Organic masker untuk mengurangi
dampak paparan fluida berbahaya dan gunakan face
d Terpapar fluida berbahaya M
shield. Gas Detector selalu standby di area kerja yang
berisiko ada paparan gas/ paparan fluida berbahaya

Memastikan setiap sambungan hose sudah terpasang HSE, SPV


Lakukan cleaning dari top head dengan baik dan memastikan kondisi hose yang layak
8 column sampai bottom head (tidak cacat). Pastikan sudah terpasang whip lock
Hose jet hand gun terlepas dan tidak
column dan keringkan e M
terkontrol disemua sambungan hose. Pemasangan barricade dan
safety sign diarea kerja

Lakukan safety briefing sebelum memulai pekerjaan HSE, SPV


dan sosialisasikan analisa kerja aman. Memastikan
komunikasi antara operator hydrant dan pekerjaan
f Terpapar air bertekanan tinggi M (tekanan dan aba-aba lainnya). Hanya personil yang
berkepentingan yang diperbolehkan memasuki area
kerja. Memasang safety sign di area kerja
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
SIKA dan JSA sudah dibuat sebelum bekerja. Lakukan HSE, SPV
pengujian kadar gas dan berbahaya dan lakukan
pencatatan monitoringnya. Pastikan gas detector yang
digunakan kalibrasi aktif. Pastikan ada watchman/
standbyman yang mencatat keluar masuk personil di
manhole, dan melakukan pencatatan monitoring gas
secara berkala. Personil didalam ruang terbatas
g Bekerja dalam ruang terbatas H maksimal 1 jam harus keluar dari ruang terbatas untuk
menghirup udara segar. Stop pekerjaan jika kandungan
gas/ fluida berbahaya dan beracun diluar ambang batas
yang diperbolehkan untuk bekerja. Pekerja sudah
melakukan fit to task sebelum bekerja. Pastikan sistem
ventilasi sudah berjalan dengan baik. Terpasang blower
in our disetiap manhole

Gunakan APD Mandatory dan gunakan APD tambahan HSE, SPV


Masker Vapour Organic masker untuk mengurangi
dampak paparan fluida berbahaya dan gunakan face
a Terpapar fluida berbahaya M shield. Gas Detector selalu standby di area kerja yang
berisiko ada paparan gas/ paparan fluida berbahaya

Memastikan setiap sambungan hose sudah terpasang HSE, SPV


dengan baik dan memastikan kondisi hose yang layak
Lakukan cleaning pada komponen Hose jet hand gun terlepas dan tidak (tidak cacat). Pastikan sudah terpasang whip lock
glycol contactor (i.e. demister, b M
9 terkontrol disemua sambungan hose. Pemasangan barricade dan
liquid distributor) dan aplikasikan safety sign diarea kerja
molykote pada stud bolts
Lakukan safety briefing sebelum memulai pekerjaan HSE, SPV
dan sosialisasikan analisa kerja aman. Memastikan
komunikasi antara operator hydrant dan pekerjaan
c Terpapar air bertekanan tinggi (tekanan dan aba-aba lainnya). Hanya personil yang
M
berkepentingan yang diperbolehkan memasuki area
kerja. Memasang safety sign di area kerja

Inspeksi Equipment
'Pastikan pekerja sudah melakukan Daily Checkup dan HSE, SPV
pekerja sudah mendapatkan training bekerja di
Lakukan inspeksi visual pada
ketinggian. Pemasangan safety sign di area kerja
10 vessel glycol contactor beserta a Jatuh dari ketinggian H
Menggunakan full body harness dan 100% Tie Off
komponen internalnya
Memasang safety sign di area kerja
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
Reinstatement Equipment HSE, SPV
Ada Signalman ada diarea kerja saat alat berat HSE, SPV
beroperasi. Pasang barricade diarea pekerjaan
pengangkatan dan pasang juga safety sign di area
Siapkan material reinstatement kerja.Sosialisasikan di briefing pagi mengenai line of
11 a Pekerja tertabrak alat berat H
dan posisikan crane fire dan safe zone position bekerja dengan alat berat.
SIKA dan Lifting plan sudah tersedia. SOP bekerja
dengan aman sudah disosialisasikan pada saat safety
briefing
'Pastikan pekerja sudah melakukan Daily Checkup dan HSE, SPV
pekerja sudah mendapatkan training bekerja di
a Jatuh dari ketinggian H ketinggian. Pemasangan safety sign di area kerja
Menggunakan full body harness dan 100% Tie Off
Memasang safety sign di area kerja

Pastikan pengikatan dilakukan sesuai dengan SOP dan HSE, SPV


pengikatan dilakukan oleh rigger bersertifikat
valid.Pastikat alat bantu pengangkatan sudah
b Peralatan dan material terjatuh M diinspeksi dan dalam keadaan baik saat digunakan.
Gunakan dan tentukan sling sesuai dengan maksimal
kapasitas beban yang akan diangkat dan sesuai
dengan lifting plan

Reinstall liquid distributor, dimister Pastikan pengikatan dilakukan sesuai dengan SOP dan HSE, SPV
12 pengikatan dilakukan oleh rigger bersertifikat
top dan bottom column
valid.Pastikat alat bantu pengangkatan sudah
c diinspeksi dan dalam keadaan baik saat digunakan.
Komponen glycol kontaktor terjatuh M
Gunakan dan tentukan sling sesuai dengan maksimal
kapasitas beban yang akan diangkat dan sesuai
dengan lifting plan

Ada Signalman ada diarea kerja saat alat berat HSE, SPV
beroperasi. Pasang barricade diarea pekerjaan
pengangkatan dan pasang juga safety sign di area
kerja.Sosialisasikan di briefing pagi mengenai line of
d Pekerja tertabrak alat berat H
fire dan safe zone position bekerja dengan alat berat.
SIKA dan Lifting plan sudah tersedia. SOP bekerja
dengan aman sudah disosialisasikan pada saat safety
briefing
Finishing
13. Dismantling Scafolding Hindari titik jepit (Pinch Point) saat memegang Clamp. HSE, SPV
a Jari tangan terjepit clamp scaffolding. R
Gunakan sarung tangan Heavy Duty
Tidak berdiri dibawah pemasangan clamp dan pipa HSE, SPV
b Tertimpa clamp dan pipa scaffolding. H scaffolding. Barricade system dan safety sign dipasang
di area kerja
Bekerja dengan berhati-hati, tidak berada dibawah HSE, SPV
c Terjepit Asiba R pemasangan scaffolding, ikat dengan proper saat
pemasangan asiba
STATUS
URUTAN LANGKAH DASAR TINGKAT KETERSEDIAAN
POTENSI DAPAT TERJADI KECELAKAAN REKOMENDASI PROSEDUR KERJA SECARA AMAN PENANGGUNG JAWAB
PEKERJAAN RESIKO
Pemasangan scaffolding hanya dilakukan oleh HSE, SPV
d Scaffolding Roboh H scaffolder yang bersertifikat dan SIO masih aktif

SIKA dan JSA sudah dibuat sebelum bekerja. Daily HSE, SPV
Check-up (DCU) sudah dilakukan sebelum bekerja.
Pastikan personil yang bekerja diketinggian sudah
mendapatkan training bekerja diketinggian .Pasang
Safety sign bekerja diketinggian dan drop object.
e Jatuh dari ketinggian H Barricade system harus diterapkan di area kerja.
Gunakan platform kerja yang aman saat bekerja di
ketinggian. Gunakan full body harness saat bekerja di
ketinggian dan 100% Tie Off

14. House Keeping Area Kerja kotor , material dan peralatan Lakukan housekeeping sebelum dan sudah selesai
berceceran bekerja. Lakukan penataan materian dengan baik.
Masukkan dan pilah sampah sesuai jenisnya di tempat
sampah. Sosialisasikan secara berkelanjutan mengenai
R HSE, SPV
pentingnya menjaga kebersihan di area kerja. Gunakan
APD mandatory dan gunakan sarung tangan saat
melakukan house keeping

HSE PELAKSANA PEKERJAAN PENGAWAS PEKERJAAN PEMBERI IJIN


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 55 of 56
CONDENSER, AND SURGE TANK

Lampiran C – Isolation Sheet


PERBAIKAN GAS DEHYDRATION
UNIT DI SP SUBANG
PROCEDURE FOR CLEANING AND
Date:07/03/2024
INSPECTION GLYCOL REBOILER
DHUSB-20-C2-PR-009 Rev. B1 (H301) INCLUDING STILL COLUMN,
STRIPPER COLUMN, REFLUX Hal 56 of 56
CONDENSER, AND SURGE TANK

Lampiran D – Layout Cleaning


Genset

Cleaning glycol
reboiler, surge tank
& Flash tank

JB

Cleaning Glycol
Air
contactor
comp

Demin water dari


CO2 removal plan

Pompa
dab

Raw water
Water truck

Pompa
Legend Pompa air
dab

Tandon Raw water kap 5 m3 Manifold raw water

Manifold demin water


iso tank Demin water kap 20 m3

Hose ¾” raw water Air


Air comp mobile
comp
Hose ¾” demin water
Hose ¾” high press

JB JB Distribusi mobile Pintu


Kabel Power 50 mm gerbang
genset ke JB utama
Genset Genset 25 KVA
Kabel Power 6 mm JB ke
mesin las/equipment