Professional Documents
Culture Documents
Question Bank-Ut2rbe
Question Bank-Ut2rbe
Q.10. Give points Tobe observed during pre-monsoon and post-monsoon inspection.
Q.2 Describe the Factors which influence the shape and size of Tunnel.
Q.4 Draw Tunnel cross section for single line Broad Gauge railway track.
Q.7 Explain in brief various operations carried out for the construction of Shaft.
Q.8. List method of tunneling in soft rock . and explain any one with sketch.