TIME LINE GENERATOR

Engine C15
FEB. 2024
No. Description Target Progres Remaks
23 24 25 26 27 28 29 30 31

1 RADIATOR 100% 0% 0%

2 GENERATOR 100% 0% 0%

3 COVER CLEP 100% 0% 0%

4 INJECTION PUMP 100% 0% 0%

5 BOLT HEAD 100% 0% 0%

6 CELINDER HED 100% 0% 0%

7 FRONT GEAR COVER 100% 0% 0%

8 BOLT CROWN SHAFT 100% 0% 0%

9 MOVE ENGINE FORM SKID 100% 0% 0%

10 CONITING ROOT 100% 0% 0%

11 CROWN SHAFT 100% 0% 0%

12 LINNER 100% 0% 0%

13 LIFTER 100% 0% 0%

14 SITTING CLEP 100% 0% 0%


Total Progress 0% 0%

TIME LINE SHALE HAKER


TYPE DERICK - SCREEN MOOGOOSE

Page 1 of 2
TENTATIVE TIMELINE GLOBAL FOR PREPARE ROTARY TABLE RIG APS # 3519
CONTRACT NO : CW1053717

= Saturday, Sunday

NO. DESCRIPTION PIC PROGRESS


Dec-19 REMARKS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 REQUIREMENT MANPOWER
2 PREPARING TECHNICAL & MAN
POWER DOCUMENTS

3 RIG EQUIPMENTS & ACCESSORIES

4 INSPECTION AND CLOSING


INTERNAL INSPECTION

5 CLOSING FINDING
6 MOVE TO NEW LOCATION
7 FINAL INSPECTION AT LOCATION

Duri, 1 Desember 2019

PREPARED BY, ACKNOWLEGGE BY

Ismail Salmi M. Mussadad


Reliability Engineer Area Manager