Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

CONTENTS

1. Location Recce
2. Contingency Plan
3. Equipment List
4. Camera and Lighting Plan
5. Production Plan + Crew List
Charlie Light
Project Director

Steve Morano live session


Planning and Production Booklet

0
Location Recce
Type of room/area:
Music recording studio
Location Address:
Deanfield Ave., Henley-on-
Thames
Sat Nav details (Post code):
RG9 1UH
Nearest Train Station:
Henley-on-Thames Train
Station
Nearest Bus stop:
Deanfield Avenue

Site contact name and contact Availability

David Nicholas 3pm to 6pm Tuesday the 5th March


dnic@henleycol.ac.uk

Permissions
David Nicholas
Suitability / shots for production (scene numbers)

Plenty of space in the room for equipment and it looks a lot like a studio. The only problem is the
main lights in there are all tungsten and look terrible on camera. But I’ll be bring a bunch of my
own lights so it will look nice in there.

Lighting Information: Solutions:


Main lights are ugly fluorescent lights Bringing my own led panels and light bars
Sound Information: Solutions:
It’s a music studio so it naturally has some
sound deadening for ideal acoustics.

Power Information Solutions:


13amp power sockets all around the room

Hazards Solutions:
Plenty to trip on. A lot of lights around to knock High vis tape around the room
into.

1
Contingency Plan
Possible Problem Solution Faced Not Faced
Camera Failure Have a replacement on
standby
SD card Failure Keeps Spares
Crew member cancel Find another asap or
leave the camera static
Audio failure Have room noise from
multiple cameras from
shotgun mics
Forget batteries Have everything
plumed in with a
power supply so
batteries are not
needed.
Not getting the power Scope out the venue to
supply to the places I make sure I can get
need it power to different
places and keep
batteries on hand just
in case.
People getting in the Adjust camera if
way of the camera they’re permanently in
the way or cut to a
different camera if
they’re just temporarily
in the way
Camera losing power. Having an alterative
power source for each
camera e.g. batteries
Camera falling off Make sure cameras are
tripod securely attached to the
tripod
Blocking exits Make sure all fire exits
are not blocked by
cameras.
Vision mixer fails Have the cameras
recording so I can edit
in post instead.
Camera connection to Use other cameras live
vision mixer failure

Equipment List
Equipment IN OUT
Canon XA60
Canon XA60
Canon XA40
2
Sony FS7 Mark ii
HDMI to Mini HDMI
HDMI to Mini HDMI
HDMI to Mini HDMI
HDMI to HDMI
Tripod
Tripod
Tripod
Tripod
Vision mixer
Vision mixer desk
Vision mixer power
Vision mixer monitor
Vision mixer monitor power
Vision Mixer Keyboard and mouse
LED panel
LED panel
LED panel
LED Bar
LED Bar
LED Bar
SSD to write onto

3
Camera and Lighting plan

4
Production Schedule (Tuesday 5th March)
Time What’s Happening
8:45 – 9:15 Gather all the equipment in the TV studio where
I’ll be testing the equipment
9:15 – 10 Set up the vision mixer and cameras
troubleshooting any problems
10 – 11 Set up my lights according to my plan and make
any adjustments necessary to make it look as
nice as possible. As well as setting up a mic to
record a test shoot to watch back later and get
some last minute feedback for any changes I
need to make.
11 – 11:30 Record the test shoot
11:30 – 12:30 Show the test shoot to a few peers to get any
feedback
12:30 – 13:30 Lunch
13:30 – 14:00 Pack all the equipment up and bring to
classroom to do equipment checks
14:00 – 14:15 Equipment checks
14:15 – 14:30 Grab Toms car and bring to outside the
classroom
14:30 – 14:45 Load up the car and take it to the music studio
14:45 – 15:00 Unload equipment into the music studio
15:00 – 16:15 Set up vision mixer, cameras, sound equipment,
lights + rendezvous with Steve
16:15 – 16:35 Record Live Sessions with Steve Morano
16:35 – 17:00 Pack down and load back into car to be put
away in the morning on Wednesday

Crew List
Name Role When Needed
Tom Strong Camera Operator + Camera Tuesday 5th March 8:45 –
Loader 17:00 + Lunch Break
Charles Light Project Director + Vision Tuesday 5th March 8:45 –
Mixer 17:00 + Lunch Break

You might also like