Download as pdf
Download as pdf
You are on page 1of 1
USKT impact head p ‘ Note » i 6 i 4 A TORR Note 2 Flare, Note 3 me 0.5m, included with colulted lenath of need oe = ‘ PLAN SF trottic tow ® @ @ ® @ ® @ ® Type M SBGR 15m MASH Sequential kinking Terminal (WSKT) System length, Note 2 Note 5 eM alls, 4 5 " Type M rails, OPS 912.125 2858 0 cal eon 7855 + i CT Ef 4 G EIT som « 18300 & sam Vee a ZV shoulder x oo bP ‘assembly plate V20 posts. mith offset Strut \

You might also like