Unit B3 – Risk Assessment – Exercise

Using the template below, create an FLRA for one chosen trade:
‐ Bricklayer
‐ Carpenter
‐ Concrete Finisher
‐ Electrician
‐ Industrial Mechanic
‐ Ironworker (rebar)
‐ Plumber
‐ Roofer
‐ Welder
Task Hazards Control Risk Level
Each FLRA should include:
1) 8 Tasks
2) 6 Hazards for each task
3) Control measure for each hazard
4) One Risk Level rating for each task

Use the following matrix to determine risk level:

High Risk ‐ Immediate risk control required. Apply Standards, Safe operating procedures,
H
Practices, Job hazard assessments and Field level Risk assessment processes

Medium Risk ‐ Risk Controls must be considered. Appropriate risk controls shall be applied for
M repetitive occurrences. Apply standards, safe operating practices, Job hazard assessments field
level risk assessment processes

Low Risk ‐ Risk reduction controls may be required. Apply safe operating practices and field
L
level hazard assessment processes.

Severity Severity
C: Major Incident/Fatality
C M H H
B: medical Aid/Lost time
A: First Aid
B L M H

Probability
A L L M
3: Very Likely
2: Possible/Likely
1 2 3 Probability
1: Unlikely
Welding
Chosen Trade: ___________________________

Task Hazards Control Risk Level

Task Hazards Control Risk Level

Task Hazards Control Risk Level

Task Hazards Control Risk Level


Task Hazards Control Risk Level

Task Hazards Control Risk Level

Task Hazards Control Risk Level

Task Hazards Control Risk Level