BUS1099 Assignment 2 Rubric - Project Management Plan - Group 7
BUS1099 Assignment 2 Rubric - Project Management Plan - Group 7
50 65 85 100
Expectations Not Met Approaching Expectations Meets Expectations Exceeds Expectations Possible
Grading Criteria Marks Level Notes
(Level 1) (Level 2) (Level 3) (Level 4) Points
Assignment does not demonstrate Assignment demonstrates a minimal or Assignment demonstrates a thorough
Assignment demonstrates the necessary
Development approaches understanding of Development
approaches
basic understanding of Development
approaches
understanding of Development approaches
understanding of Development approaches and
includes insightful information & ideas
4 4.00 Level 4
Assignment does not demonstrate Assignment demonstrates a minimal or Assignment demonstrates a thorough
Assignment demonstrates the necessary Did not adeqately define the variance threshold for
Scope variance threshold understanding of Scope variance
threshold
basic understanding of Scope variance
threshold
understanding of Scope variance threshold
understanding of Scope variance threshold and
includes insightful information & ideas
1 0.65 Level 2 scope.
Assignment does not demonstrate Assignment demonstrates a minimal or Assignment demonstrates a thorough
Assignment demonstrates the necessary Does not define specifically how scope baseline will
Scope baseline management understanding of Scope baseline
management
basic understanding of Scope baseline
management
understanding of Scope baseline management
understanding of Scope baseline management and
includes insightful information & ideas
1 0.50 Level 1 be managed
Assignment does not demonstrate Assignment demonstrates a minimal or Assignment demonstrates a thorough
Assignment demonstrates the necessary Did not adeqately define the variance threshold for
Schedule variance threshold understanding of Schedule variance
threshold
basic understanding of Schedule variance
threshold
understanding of Schedule variance threshold
understanding of Schedule variance threshold and
includes insightful information & ideas
1 0.65 Level 2 schedule.
Assignment does not demonstrate Assignment demonstrates a minimal or Assignment demonstrates the necessary Assignment demonstrates a thorough
Does not define specifically how schedule baseline
Schedule baseline management understanding of Schedule baseline
management
basic understanding of Schedule baseline understanding of Schedule baseline
management management
understanding of Schedule baseline management
and includes insightful information & ideas
1 0.50 Level 1 will be managed
Assignment does not demonstrate Assignment demonstrates a minimal or Assignment demonstrates a thorough
Assignment demonstrates the necessary Does not adequately define what the cost variance
Cost variance threshold understanding of Cost variance
threshold
basic understanding of Cost variance
threshold
understanding of Cost variance threshold
understanding of Cost variance threshold and
includes insightful information & ideas
1 0.65 Level 2 threshold amount is
Assignment does not demonstrate Assignment demonstrates a minimal or Assignment demonstrates a thorough
Assignment demonstrates the necessary
Cost baseline management understanding of Cost baseline
management
basic understanding of Cost baseline
understanding of Cost baseline management
understanding of Cost baseline management and 1 0.50 Level 1 Basic description of how costs are managed
management includes insightful information & ideas
7 or more spelling and grammar issues 5-7 spelling and grammar issues found in 0-2 spelling and grammar issues found in the report
2-5 spelling and grammar issues found in the
Submission Quality: Spelling/Grammar found in the report that resulted in the report that resulted in diminished that resulted in diminished clarify. The report was
and Overall Readability/Understanding diminished clarity. Report was clarify. Report was difficult to
report that resulted in diminished clarify.
Report was clear and understandable.
eloquently written for enhanced readability and 3 2.55 Level 3
unclear/difficult to understand. understand in places. understanding.
Page 1 of 2
2021-06-14
BUS1099: Assignment # 2 Rubric – Project Management Plan (10%) Team 7
Assignment Due Date: May 28th @ 11:59PM Late Penalty: 2 points per day late to maximum of 50% of assignment grade.
Content to be marked was not properly The deliverable quality was of high quality that
Some formatting inconsistencies made Minor formatting inconsistencies made the
Submission Quality consolidated and improper formatting
made difficult to read.
the document difficult to read document difficult to read in some places.
could be distributed to a third party without any
refinements.
2 1.70 Level 3
The deliverable quality is well below The deliverable quality is below the
The deliverable quality is almost of the quality
Overall Deliverable Quality the acceptable quality to be distributed acceptable quality to be distributed to a
to a third party. third party.
to be distributed to a third party.
(This means you did an exceptional job). 3 2.55 Level 3
1 - BoF: The Project Manager’s Book of forms TOTAL (/41) 41 34.25 83.5%