United States Department of the Interior

National Park Service


Class A Construction Cost Estimate
BASIS OF ESTIMATE

PROJECT INFORMATION
Project: Project Name

Park: Park Name


Park Apha: Park Alpha Code
PMIS: TBD or PMIS number if known
Estimate Date: Estimate Date
Prepared By: Estimator Name
Company: Company
Address: Address
City, State Zip: City
Phone: Phone

BACKGROUND SUPPORTING MATERIAL (Scope of Work):


Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property
(GFP)

SOURCE OF COST DATA:


Document all sources of cost information used in the estimate. (Attach additional information if necessary)

ESTIMATE ASSUMPTIONS:
Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.

MAJOR CHANGES FROM PREVIOUS ESTIMATE:


Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.

Construction Cost Estimate Template.xls


Basis of Estimate Page 1 of 83 Print Date: 15-08-22
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate
BASIS OF ESTIMATE

PROJECT INFORMATION
Project: Project Name

Park: Park Name


Park Apha: Park Alpha Code
PMIS: TBD or PMIS number if known
Estimate Date: Estimate Date

DESCRIPTION OF MARK-UP & ADD-ONS:


Design Contingency: 0.00% Explain & Justify

Standard. General Conditions: 0.00% Explain & Justify

Government General Conditions: 0.00% Explain & Justify

Contractor Overhead: 0.00% Explain & Justify

Contractor Profit: 0.00% Explain & Justify

Contracting Method Adjustment: 0.00% Describe anticipated contract method and justify value used.

Annual Inflation Escalation Factor: 0.00% Projected annual inflation rate.

Time Until Project Midpoint (Months) 0 Number of months from estimate (or data) date until the projects
midpoint of construction.

OTHER COMMENTS:
Provide any additional information, qualifications, etc.

Construction Cost Estimate Template.xls


Basis of Estimate Page 2 of 83 Print Date: 15-08-22
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

PROJECT COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS Number: TBD or PMIS number if known Date:

General General Contracting Inflation


Total Total Direct Design General
Total Material Total Labor Contractor Contractor Method Escalation Bid Item
Bid Item No. Bid Item Description Equipment Construction Contingency Conditions
Cost Cost Overhead Profit Adjustment Month Total
Cost Costs APR
s
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0
Bid Item: 1 Asset / Project Element 1 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 1 Asset / Project Element 1 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 2 Asset / Project Element 2 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 2 Asset / Project Element 2 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 3 Asset / Project Element 3 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 3 Asset / Project Element 3 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 4 Asset / Project Element 4 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 4 Asset / Project Element 4 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 5 Asset / Project Element 5 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 5 Asset / Project Element 5 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Construction Cost Estimate Template.xls


Project Cost Summary Page 3 of 83 Print Date: 15-08-22, 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

PROJECT COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS Number: TBD or PMIS number if known Date:

General General Contracting Inflation


Total Total Direct Design General
Total Material Total Labor Contractor Contractor Method Escalation Bid Item
Bid Item No. Bid Item Description Equipment Construction Contingency Conditions
Cost Cost Overhead Profit Adjustment Month Total
Cost Costs APR
s
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0
Bid Item: 6 Asset / Project Element 6 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 6 Asset / Project Element 6 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 7 Asset / Project Element 7 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 7 Asset / Project Element 7 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 8 Asset / Project Element 8 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 8 Asset / Project Element 8 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 9 Asset / Project Element 9 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 9Asset / Project Element 9 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Bid Item: 10 Asset / Project Element 10 TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
WBS L2 WBS Description $ - $ - $ - $ -
Total - Bid Item 10 Asset / Project Element 10 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Total Bid Items 1-10 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Construction Cost Estimate Template.xls


Project Cost Summary Page 4 of 83 Print Date: 15-08-22, 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

BID ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS Number: TBD or PMIS number if known Date:

Bid Item Number Asset / Project Element / Description Size/Count Units


BID ITEM 1 Asset / Project Element / Description 0 Unit

Item Material Total Material Equipment Total Equipment Direct Total Direct
WBS Description Labor Cost/Unit Total Labor Cost NET Cost/Unit Total NET Costs
No. Cost/Unit Cost Cost/Unit Cost Cost/Unit Costs
1 A10 Foundations #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
2 A20 Basement Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
3 B10 Superstructure #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
4 B20 Exterior Enclosure #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
5 B30 Roofing #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
6 C10 Interior Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
7 C20 Stairs #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
8 C30 Interior Finishes #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
9 D10 Conveying Systems #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
10 D20 Plumbing Systems #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
11 D30 HVAC #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
12 D40 Fire Protection #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
13 D50 Electrical #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
14 E10 Equipment #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
15 E20 Furnishings #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
16 F10 Special Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
17 F20 Selective Building Demolition #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
18 G10 Site Preparation #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
19 G20 Site Improvements #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
20 G30 Site Mechanical Utilities #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
21 G40 Site Electrical Utilities #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
22 G50 Other Site Construction #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
23 XX Special Use - 1 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
24 XX Special Use - 2 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
25 XX Special Use - 3 #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! #DIV/0!
Subtotal Direct Construction Costs #DIV/0! $ - #DIV/0! $ - #DIV/0! $ - #DIV/0! $0 #DIV/0! #DIV/0!
Total Value of Government Furnished Property (GFP) Inc. in Direct Cost . $0.00 $ - $ - $ - $0 In most cases GFP is normally zero -
Direct Cost Subtotal without GFP . $ - $ - $ - $0 see footnote-
Design Contingency 0.00% $0
Total Direct Construction Costs $0
Standard General Conditions 0.00% Applied to Total Direct Construction Cost less GFP $0
Government General Conditions 0.00% Applied to Total Direct Construction Cost less GFP $0
Subtotal NET Construction Cost $0
Overhead 0.00% $0
Profit 0.00% $0
Estimated NET Construction Cost $0
Contracting Method Adjustment 0.00% $0
Inflation Escalation 0 Months Annual Rate = 0.00% Inc. Bonds & CMA $0
Total Estimated NET Cost of Construction $0

GFP costs only apply when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other
adjustment factors or O&P markup have been applied.

Construction Cost Estimate Template.xls


Bid Item 1 Summary Page 5 of 83 Print Date: 15-08-22, 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: A10 Foundations Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
A1010 STANDARD FOUNDATIONS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STANDARD FOUNDATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
A1020 SPECIAL FOUNDATIONS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL FOUNDATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1 - A10 - Foundations 6 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: A10 Foundations Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
A1030 SLAB ON GRADE
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SLAB ON GRADE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1 - A10 - Foundations 7 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: A10 Foundations Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: A10 Foundations


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

A10 Foundations 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1 - A10 - Foundations 8 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: A20 Basement Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
A2010 BASEMENT EXCAVATION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASEMENT EXCAVATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
A2020 BASEMENT WALLS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASEMENT WALLS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-A20 Basement 9 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: A20 Basement Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-A20 Basement 10 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: A20 Basement Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: A20 Basement Construction


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

A20 Basement Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-A20 Basement 11 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: B10 Superstructure Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
B1010 FLOOR CONSTRUCTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FLOOR CONSTRUCTION 1000 Unit $ - $0 $ - $0 $ - $0 $ - $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
B1020 ROOF CONSTRUCTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B10 Superstructure 12 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: B10 Superstructure Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B10 Superstructure 13 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: B10 Superstructure Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: B10 Superstructure


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

B10 Superstructure 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B10 Superstructure 14 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:
OP
Summary Item: B20 Exterior Enclosure Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
B2010 EXTERIOR WALLS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR WALLS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
B2020 EXTERIOR WINDOWS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR WINDOWS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B20 Exterior Enclosure 15 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:
OP
Summary Item: B20 Exterior Enclosure Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
B2030 EXTERIOR DOORS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL EXTERIOR DOORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B20 Exterior Enclosure 16 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:
OP
Summary Item: B20 Exterior Enclosure Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: B20 Exterior Enclosure


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

B20 Exterior Enclosure 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B20 Exterior Enclosure 17 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: B30 Roofing Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
B3010 ROOF COVERINGS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF COVERINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
B3020 ROOF OPENINGS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROOF OPENINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B30 Roofing 18 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: B30 Roofing Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B30 Roofing 19 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: B30 Roofing Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: B30 Roofing


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

B30 Roofing 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-B30 Roofing 20 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C10 Interior Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C1010 INTERIOR PARTITIONS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INTERIOR PARTITIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C1020 INTERIOR DOORS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INTERIOR DOORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C10 Interior Construct. 21 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C10 Interior Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C1030 FITTINGS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FITTINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C10 Interior Construct. 22 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C10 Interior Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: C10 Interior Construction


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

C10 Interior Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C10 Interior Construct. 23 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C20 Stairs Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C2010 STAIR CONSTRUCTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STAIR CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C2020 STAIR FINISHES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STAIR FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C20 Stairs 24 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C20 Stairs Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C20 Stairs 25 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C20 Stairs Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: C20 Stairs


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

C20 Stairs 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C20 Stairs 26 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C30 Interior Finishes Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C3010 WALL FINISHES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL WALL FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C3020 FLOOR FINISHES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FLOOR FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C30 Interior Finishes 27 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C30 Interior Finishes Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
C3030 CEILING FINISHES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL CEILING FINISHES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C30 Interior Finishes 28 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: C30 Interior Finishes Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: C30 Interior Finishes


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

C30 Interior Finishes 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-C30 Interior Finishes 29 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D10 Conveying Systems Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D1010 ELEVATORS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ELEVATORS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D1020 ESCALATORS & MOVING WALKS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ESCALATORS & MOVING WALKS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D10 Conveying Systems 30 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D10 Conveying Systems Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D1030 MATERIAL HANDLING SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL MATERIAL HANDLING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D1090 OTHER CONVEYING SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER CONVEYING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D10 Conveying Systems 31 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D10 Conveying Systems Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: D10 Conveying Systems


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

D10 Conveying Systems 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D10 Conveying Systems 32 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D20 Plumbing Systems Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D2010 PLUMBING FIXTURES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL PLUMBING FIXTURES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D2020 DOMESTIC WATER DISTRIBUTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL DOMESTIC WATER DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D20 Plumbing 33 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D20 Plumbing Systems Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D2030 SANITARY WASTE
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SANITARY WASTE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D2040 RAIN WATER DRAINAGE
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL RAIN WATER DRAINAGE 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D20 Plumbing 34 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D20 Plumbing Systems Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D2050 SPECIAL PLUMBING SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL PLUMBING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D2090 OTHER PLUMBING SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER PLUMBING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: D20 Plumbing Systems


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

D20 Plumbing Systems 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D20 Plumbing 35 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D30 HVAC Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D3010 ENERGY SUPPLY
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ENERGY SUPPLY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D3020 HEAT GENERATING SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL HEAT GENERATING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D30 HVAC 36 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D30 HVAC Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D3030 COOLING GENERATING SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COOLING GENERATING SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D3040 DISTRIBUTION SYSTEMS (HVAC)
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL DISTRIBUTION SYSTEMS (HVAC) 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D30 HVAC 37 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D30 HVAC Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D3050 TERMINAL & PACKAGE UNITS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL TERMINAL & PACKAGE UNITS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3060 CONTROLS & INSTRUMENTATION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL CONTROLS & INSTRUMENTATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D30 HVAC 38 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D30 HVAC Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3070 SPECIAL HVAC SYSTEMS & EQUIPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3080 SYSTEM TESTING & BALANCING
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SYSTEM TESTING & BALANCING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D30 HVAC 39 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D30 HVAC Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3090 OTHER HVAC SYSTEMS & EQUIPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER HVAC SYSTEMS & EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: D30 HVAC


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

D30 HVAC 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D30 HVAC 40 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D40 Fire Protection Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D4010 FIRE PROTECTION SPRINKLERS SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D4020 STANDPIPE & HOSE SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STANDPIPE & HOSE SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D40 Fire Protection 41 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D40 Fire Protection Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D4030 FIRE PROTECTION SPECIALTIES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FIRE PROTECTION SPECIALTIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D4090 OTHER FIRE PROTECTION SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER FIRE PROTECTION SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D40 Fire Protection 42 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D40 Fire Protection Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: D40 Fire Protection


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

D40 Fire Protection 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D40 Fire Protection 43 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D50 Electrical Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D5010 ELECTRICAL SERVICE & DISTRIBUTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ELECTRICAL SERVICE & DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D5020 LIGHTING & BRANCH WIRING
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL LIGHTING & BRANCH WIRING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D50 Electrical 44 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D50 Electrical Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D5030 COMMUNICATIONS & SECURITY
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COMMUNICATIONS & SECURITY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D5040 SPECIAL ELECTRICAL SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL ELECTRICAL SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D50 Electrical 45 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: D50 Electrical Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
D5090 OTHER ELECTRICAL SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER ELECTRICAL SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: D50 Electrical


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

D50 Electrical 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-D50 Electrical 46 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: E10 Equipment Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
E1010 COMMERCIAL EQUIPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COMMERCIAL EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
E1020 INSTITUTIONAL EQUIPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INSTITUTIONAL EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-E10 Equipment 47 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: E10 Equipment Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
E1030 VEHICULAR EQUIPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL VEHICULAR EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
E1090 OTHER EQUIPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-E10 Equipment 48 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: E10 Equipment Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: E10 Equipment


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

E10 Equipment 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-E10 Equipment 49 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: E20 Furnishings Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
E2010 FIXED FURNISHINGS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FIXED FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
E2020 MOVABLE FURNISHINGS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL MOVABLE FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-E20 Furnishings 50 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: E20 Furnishings Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
E2090 OTHER FURNISHINGS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-E20 Furnishings 51 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: E20 Furnishings Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: E20 Furnishings


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

E20 Furnishings 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-E20 Furnishings 52 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: F10 Special Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
F1010 SPECIAL STRUCTURES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL STRUCTURES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
F1020 INTEGRATED CONSTRUCTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INTEGRATED CONSTRUCTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-F10 Special Construction 53 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: F10 Special Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
F1030 SPECIAL CONSTRUCTION SYSTEMS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL CONSTRUCTION SYSTEMS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
F1040 SPECIAL FACILITIES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SPECIAL FACILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-F10 Special Construction 54 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: F10 Special Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
F1050 SPECIAL CONTROLS & INSTRUMENTATION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL INSTRUMENTATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: F10 Special Construction


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

F10 Special Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-F10 Special Construction 55 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: F20 Selective Building Demolition Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
F2010 BUILDING ELEMENTS DEMOLITION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BUILDING ELEMENTS DEMOLITION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
F2020 HAZARDOUS COMPONENTS ABATEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ABATEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-F20 Selective Demo. 56 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: F20 Selective Building Demolition Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-F20 Selective Demo. 57 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: F20 Selective Building Demolition Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: F20 Selective Building Demolition


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

F20 Selective Building Demolition 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-F20 Selective Demo. 58 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G10 Site Preparation Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G1010 SITE CLEARING
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE CLEARING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G1020 SITE DEMOLITION & RELOCATIONS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE DEMOLITION & RELOCATIONS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G10 Site Preparation 59 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G10 Site Preparation Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G1030 SITE EARTHWORK
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE EARTHWORK 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G1040 HAZARDOUS WASTE REMEDIATION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL HAZARDOUS WASTE REMEDIATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G10 Site Preparation 60 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G10 Site Preparation Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G1090 OTHER SITE PREPARATION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE PREPARATION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: G10 Site Preparation


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

G10 Site Preparation 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G10 Site Preparation 61 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G20 Site Improvements Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G2010 ROADWAYS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ROADWAYS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G2020 PARKING LOTS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL PARKING LOTS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G20 Site Improvements 62 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G20 Site Improvements Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G2030 PEDESTRIAN PAVING
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL PEDESTRIAN PAVING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G2040 SITE DEVELOPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE DEVELOPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G20 Site Improvements 63 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G20 Site Improvements Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G2050 LANDSCAPING
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL LANDSCAPING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G2060 SITE FURNISHINGS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE FURNISHINGS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: G20 Site Improvements


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

G20 Site Improvements 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G20 Site Improvements 64 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G30 Site Mechanical Utilities Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3010 WATER SUPPLY
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL WATER SUPPLY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3020 SANITARY SEWER
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SANITARY SEWER 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G30 Site Mechanical 65 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G30 Site Mechanical Utilities Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3030 STORM SEWER
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL STORM SEWER 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3040 HEATING DISTRIBUTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL HEATING DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G30 Site Mechanical 66 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G30 Site Mechanical Utilities Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3050 COOLING DISTRIBUTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL COOLING DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3060 FUEL DISTRIBUTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL FUEL DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G30 Site Mechanical 67 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY

Project: Project Name Estimate By: Estimator Name


Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G30 Site Mechanical Utilities Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G3090 OTHER SITE MECHANICAL UTILITIES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE MECHANICAL UTILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: G30 Site Mechanical Utilities


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

G30 Site Mechanical Utilities 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G30 Site Mechanical 68 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G40 Site Electrical Utilities Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G4010 ELECTRICAL DISTRIBUTION
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL ELECTRICAL DISTRIBUTION 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G4020 SITE LIGHTING
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE LIGHTING 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G40 Site Electrical 69 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G40 Site Electrical Utilities Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G4030 SITE COMMUNICATIONS & SECURITY
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SITE COMMUNICATIONS & SECURITY 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G4090 OTHER SITE ELECTRICAL UTILITIES
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE ELECTRICAL UTILITIES 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G40 Site Electrical 70 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G40 Site Electrical Utilities Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: G40 Site Electrical Utilities


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

G40 Site Electrical Utilities 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G40 Site Electrical 71 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G50 Other Site Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G5010 SERVICE & PEDESTRIAN TUNNELS
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL SERVICE & PEDESTRIAN TUNNELS 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
G5090 OTHER SITE SYSTEMS & EQUIPMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL OTHER SITE SYSTEMS & EQUIPMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G50 Other Site Const. 72 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G50 Other Site Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G50 Other Site Const. 73 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: G50 Other Site Construction Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: G50 Other Site Construction


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

G50 Other Site Construction 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-G50 Other Site Const. 74 of 83 15-08-22 12:50 PM
United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 1 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-Special Use 1 75 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 1 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-Special Use 1 76 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 1 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: XX Special Use - 1


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

XX Special Use - 1 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-Special Use 1 77 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 2 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-Special Use 2 78 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 2 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-Special Use 2 79 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 2 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: XX Special Use - 2


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

XX Special Use - 2 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1-Special Use 2 80 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 3 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1 -Special Use 3 81 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 3 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1 -Special Use 3 82 of 83 15-08-22 12:50 PM


United States Department of the Interior
National Park Service
Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Project Name Estimate By: Estimator Name
Park: Park Name Date: Estimate Date
Park Alpha: Park Alpha Code Reviewed By:
PMIS: TBD or PMIS number if known Date:

Summary Item: XX Special Use - 3 Total Cost: $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

MATERIAL LABOR EQUIPMENT TOTALS


Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost
BASE CODE BASE ELEMENT
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
MF-2004 Code Description 0 Unit $ - $0 $ - $0 $ - $0 $ - $0
SUBTOTAL BASE ELEMENT 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Summary Item: XX Special Use - 3


MATERIAL LABOR EQUIPMENT TOTALS
Uniformat II WBS Total
Description Quantity Unit Material Total Material Labor Total Labor Equipment Total
Code Equipment Total Cost
Cost/Unit Cost Cost/Unit Cost Cost/Unit Cost/Unit
Cost

XX Special Use - 3 0 Unit #DIV/0! $0 #DIV/0! $0 #DIV/0! $0 #DIV/0! $0

Construction Cost Estimate Template.xls, Item 1 -Special Use 3 83 of 83 15-08-22 12:50 PM