This document is a bid evaluation report for the construction of paver blocks in Village Pandhi Hingoro. It provides details of the bidding process such as the procuring agency, tender reference number, description of work, procurement method, bids received and financial bid opening date. It also includes a table that ranks and evaluates the two bids received based on cost, showing that M/s. H S L submitted the lowest bid that was within the estimated cost and is recommended for acceptance.
This document is a bid evaluation report for the construction of paver blocks in Village Pandhi Hingoro. It provides details of the bidding process such as the procuring agency, tender reference number, description of work, procurement method, bids received and financial bid opening date. It also includes a table that ranks and evaluates the two bids received based on cost, showing that M/s. H S L submitted the lowest bid that was within the estimated cost and is recommended for acceptance.
This document is a bid evaluation report for the construction of paver blocks in Village Pandhi Hingoro. It provides details of the bidding process such as the procuring agency, tender reference number, description of work, procurement method, bids received and financial bid opening date. It also includes a table that ranks and evaluates the two bids received based on cost, showing that M/s. H S L submitted the lowest bid that was within the estimated cost and is recommended for acceptance.
SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME (SAP) 2022-23 3 Tender description / Name of work / item: Construction of Paver Block @ Village Pandhi Hingoro
4 Method of Procurement: Single stage – one envelope procedure.
5 Tender Published: SPPRA Sr. No. T00615-22-0005
6 Total Bid documents Sold: (02)
7 Total Bids Received: (02)
Technical Bid Opening date: (if
8 applicable) Not applicable (Provide details in separate form)
No. of Bid technically qualified (if
9 Not applicable applicable): 10 Bid (s) Rejected: NIL 11 Financial Bid Opening date 24-05-2023 12 Bid Evaluation Report: Ranking Comparison Reasons for Sr. Cost offered by the Name of Firm or Bidder in terms with acceptance / Remarks. No. bidder of cost Estimated cost rejection 1 2 3 4 5 6 7 Within M/s. H S L 15,89,489 1st 1 Estimated 1st Lowest Accepted lowest cost M/s. Mohammad Yaseen Kaka 16,23,710 2 2nd Highest