LOCATIONAL GUIDELINES OF

CERTAIN PROJECTS
POULTRY AND PIGGERY

Poultry Farm – a parcel of land devoted to the raising of


domesticated fowls which serves as sources of eggs and
meat for human consumption as well as breeding of
gamecocks
POULTRY AND PIGGERY

Piggery Farm – a parcel of land devoted to the raising or


breeding, depasturing, feeding or watering of pigs/swine
POULTRY AND PIGGERY DHSUD ISSUANCES
HLURB MC 2017-03: Mandatory Consultation with Stakeholders or Landowners Affected by
Rezoning or Agricultural Land Reclassification.
HLURB BR 2002-729: Approving the Deletion of DAR Exemption Clearance From the List of
Documentary Requirements Prescribed in the Rules and Regulations To Govern The Processing
of Applications For Locational Clearance For Poultry And Piggery Projects, Markets and the
Implementing Rules and Regulations For Memorial Parks and Cemeteries.
HLURB BR 2000-674: Approving The Amendments To The Implementing Rules And Regulations
Governing The Applications For Locational Clearance Of Poultry And Piggery.
HLURB BR 1984-181: Approving The Rules And Regulations Of Sawmill, Rice And Corn Mill, Poultry
And Piggery, Funeral Parlors/ Memorial Chapels/Mortuaries, Cockpits, Public Market And
Industrial Subdivisions.
HLURB BR 1981-039: Approving Design Standards And Guidelines For Rice Mill, Cockpit, Piggery And
Land Use Planning For Areas For Priority Development
BASIC REQUIREMENTS(per BR 2000-674)
✓ Vicinity Map. Drawn to scale of 1:10,000 and all existing adjacent land
uses/establishments w/n 500-meter radius from the proposed site and
access road leading to it. Signed by a duly licensed geodetic engineer.
(include XY Coordinates)
✓ Site Dev. Plan. 1:200 indicating lot property boundaries, circulation road
network, buildable area/building site, parking and future expansion…
✓ Certified true copy of TCT/Deed of Sale/Lease Agreement
✓ ECC/CNC from EMB
✓ CO from DAR if agricultural zone (Amended by BR 2002-729)
✓ Site Clearance from the local health officer/veterinarian on the suitability
of the location pursuant to Chapter IX of PD 856’s IRR
SITE INSPECTION CONSIDERATIONS

• conformity with the CLUP


• suitability of the land
• suitability of site climate/weather
• accessibility
• presence or ability to provide utilities
POULTRY AND PIGGERY CLASSIFICATION
POULTRY PIGGERY
CLASSIFICATION
BACK YARD
Max. of 500 heads 1 sow and 10 heads
SMALL
501-5,000 heads -
MEDIUM
Over 5,000 heads but less than 10,000 2 sows and 11-20 heads
heads
LARGE
Over 10,000 heads More than 2 sows & more than 20
heads
POULTRY FARM MINIMUM DISTANCE REQUIREMENTS
POULTRY FARM MINIMUM DISTANCE REQUIREMENTS
CLASSIFI- DISTANCE FRM
SOURCE OF
DISTANCE
FROM BUILT-
DISTANCE
FRM MJ
DISTANCE
BETWEEN
CATION GRND H2O UP RD/HIGHWAY POULTRY
FARMS

Backyard 25 M N/A N/A N/A

Small 25 M 500 m 200 M 500 M

Medium 25 M 1,000 M 200 M 1,000 M

Large 25 M 1,000 M 200 M 1,000 M


PIGGERY FARM MINIMUM DISTANCE REQUIREMENTS
PIGGERY FARM MINIMUM DISTANCE REQUIREMENTS

CLASSIFI- DISTANCE
FRM SOURCE
DISTANCE DISTANCE
FROM BUILT- FRM MAJ
DISTANCE
BETWEEN
CATION OF GRND H2O UP RD/HIWAY PIGGERY
FARMS

Backyard 25 M N/A N/A N/A

Medium 25 M 1,000 M 500 M 1,000 M

Large 25 M 1,000 M 500 M 1,000 M


ZONING: PIGGERY AND POULTRY

NOT ALLOWED IN URBAN AREAS


Only 30% of lot area in rural areas shall be
allowed for backyard poultry and piggery
AGRICULTURAL ZONE
BASE STATION/CELLULAR
MOBILE TELEPHONE,PAGING,
TRUNKING, WIRELESS LOCAL
LOOP, & OTHER WIRELESS
COMMUNICATION SERVICES
BASE STATION/CELLULAR MOBILE TELEPHONE,PAGING, TRUNKING, WIRELESS
LOCAL LOOP, & OTHER WIRELESS COMMUNICATION SERVICES
ARTA JMC 2023-001: The IRR of OP EO 32 otherwise known as “Streamlining the permitting
process for the construction of telecommunications and internet infrastructure”
OP EO 2023-32: Streamlining the permitting process for the construction of telecommunications
and internet infrastructure
ARTA JMC 2021-001: Revising and expanding JMC 1, s. 2020 or the “Streamlined guidelines for
the issuance of permits, licenses, and certificates for the construction of shared passive
telecommunications tower infrastructures (PTTIs)”
ARTA JMC 2020-001: Streamlined guidelines for the issuance of permits, licenses, & certificates
for the construction of shared passive telecommunications tower
DHSUD DO 2020-009: Revised Locational Guidelines for Base Stations & Other Infra. For Cellular
Mobile Telephone service, Paging Service, Trunking Service, Wireless Communication
Services
HLURB BR 2005-779: Amending HLURB BR 1998-626, by Treating DAR conversion order as a
post requirement in the issuance of Locational Clearance for base stations of Cellular
Mobile Telephone Service, Paging Service, trunking Service, Wireless Loop Service and
other Communication Services.
HLURB BR 1998-626: Approving The Locational Guidelines For Base Stations Of Cellular Mobile
Telephone Service, Paging Service, Trunking Service, Wireless Local Loop Service And Other
Wireless Communication Services
ARTA JMC 2023-001- IRR of OP EO 32
Coverage

1. Construction, installation, repair, operation, and maintenance


of Passive Telecommunications Tower Infrastructure (PTTIs)
2. Erection of poles, installation of aerial and underground
cables and facilities, underground fiber ducts, ground
terminals and other transmission or similar
telecommunications and internet infrastructure and facilities,
and other Passive Telecommunications Tower Infrastructure,
including Distribution Utility Facilities relating to its power
requirements.
ARTA JMC 2023-001- IRR of OP EO 32
Applicability

1. Public Telecommunication Entities (PTEs), which are holders of Certificates of


Public Convenience and Necessity or Provisional Authorities granted by the
NTC;
2. Cable TV (CATV) Operators, which are registered as Value-Added Service
(VAS) Providers and authorized to offer internet access service
3. VAS Providers, which are registered with NTC to offer internet access service
and contracted by the DICT under the Free Public Internet Access Program in
Public Places;
4. ICT Technology Providers or Physical Infrastructure Contractors, which are
contracted by PTEs or CATV Operators to roll out or construct, install, and/or
establish their infrastructure;
5. Independent Tower Companies (ITCs), which are registered with the DICT
6. Distribution Utility Owners, which are covered by a duly-issued franchise;
7. All authorized contractors of the foregoing entities.
ARTA JMC 2023-001- IRR of OP EO 32
RULE III – STREAMLINED REQUIREMENTS FOR THE CONSTRUCTION, INSTALLATION &
REPAIR OF PASSIVE TELECOMMUNICATIONS TOWER INFRASTRUCTURE (PTTIs)

RULE IV - STREAMLINED REQUIREMENTS FOR ERECTION OF POLES AND


CONSTRUCTION OF UNDERGROUND FIBER DUCTS

RULE V - STREAMLINED REQUIREMENTS FOR LAYING OF CABLES ON EXISTING POLES,


UNDERGROUND FIBER DUCTS, AND OTHER PHYSICAL INFRASTRUCTURE

RULE VI- STREAMLINED REQUIREMENTS FOR OPERATION, REPAIR AND MAINTENANCE


OF PASSIVE TELECOMMMUNICATIONS TOWER INFRASTRUCTURE (PTTIs)
INCLUDING DISTRIBUTION UTILITY FACILITIES

RULE VII- CLEARANCES FROM OTHER GOVERNMENT AGENCIES

RULE VIII - ADOPTION AND IMPLEMENTION OF EXECUTIVE ORDER NO. 32 BY THE LOCAL
GOVERMENT UNITS

RULE IX- ACTION ON THE APPLICATION


ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS
1. UNIFIED FORM
2. PROPERTY DOCUMENTS
3. TECHNICAL DOCUMENTS
a. If the PTTI will be built directly on the ground
b. If the PTTI is to be installed on existing buildings, walls, rooftops, or other edifices
4. ANCILLARY PERMITS
a. Architectural Permit;
b. Civil/Structural Permit;
c. Electrical Permit;
d. Mechanical Permit;
e. Plumbing Permit; and
f. Electronics Permit.
5. ACCESSORY PERMITS
a. Ground Preparation & Excavation;
b. Encroachment of Foundation to Public Area;
c. Fencing, for fence not exceeding 1.8 meters high;
d. Sidewalk construction;
e. Temporary sidewalk enclosure & occupancy;
f. Erection of Scaffolding; and
g. Erection, Repair, Removal of Sign & Demolition
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

Locational Clearance. The representative from the Zoning


Office/Planning Development Office of the LGU detailed at
the OSCP shall be responsible for the verification/ issuance
of locational clearance as part of the OSCP backroom
operation. The representative shall provide a copy of the
said clearance to the OBO as a documentary requirement
to the building permit application. The applicant shall not be
required to submit a separate application directly to the
Zoning Office/Planning Development Office in order to
secure a locational clearance prior to the submission of the
application for building permit.
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

Processing Time. Building permit applications with


complete documentary requirements shall be acted upon
by the different offices at the OSCP, functioning as one unit,
within a non-extendible period of seven (7) working days
from the date the application was received. The OSCP shall
release the Building Permit, together with the Locational
Clearance, other ancillary permits and the FSEC, after
payment of appropriate fees and charges.
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

HOA CLEARANCE/CERTIFICATE OF NO OBJECTION.


In case where the proposed PTTI is to be constructed
within a residential community with a current and duly
registered HOA, the applicant shall submit any of the
following:

• HOA Clearance, or Certificate of No Objection, or other


form of clearances. LGUs may refer to the list of duly
registered Homeowner’s Association ted in the DHSUD
website, if deemed necessary ( Processing time: 10
working days; non-extendible period of 30 working days )
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

NO DULY REGISTERED HOA. the applicant shall only be


required to submit a Certification by the owner of the
property that there is no existing duly registered
homeowner’s association in the proposed project site. The
applicant shall also submit an Undertaking that they will
conduct social preparation or will endeavor to educate the
affected homeowners, households or families as to their
health and safety protocol…
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

CLEARANCE FROM OTHER GOVERNMENT AGENCIES


(WHENEVER APPLCIABLE).
A. ECC if the proposed project site is within ECA;
B. Special Use Agreement in Protected Areas, if the site is
a protected area;
C. FPIC, if the site is within an ancestral domain;
D. Land use conversion from DAR Central office, if the site
requires conversion of agri. Land of more than 5 Has.,
or from DAR regional office, if the said land is 5 Has. &
below.
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

CLEARANCE NOT REQUIRED FROM OTHER GOVERNMENT


AGENCIES (BP, BRGY CLEARANCE, FIRE SAFETY EVAL.
CLEARANCE, LC
A. Sangguniang Panlungsod / Bayan Resolution;
B. Sangguniang Barangay Resolution;
C. ECC or CNC, if the proposed site of construction is outside an
environmentally critical area;
D. Certificate of Safety Evaluation from the Department of Health
and the Food and Drug Administration; and
E. CTC of NTC Provisional Authority or Certificate of Public
Convenience and Necessity or Certificate of Registration to
Provide Telecommunication Services.
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

CLEARANCE NOT REQUIRED FROM OTHER GOVERNMENT


AGENCIES (FOR EXCAVATION CLEARANCE)
A. Business or Mayor’s Permit
B. Consent from Adjacent Lot owners

CLEARANCE NOT REQUIRED FROM OTHER GOVERNMENT


AGENCIES (FOR LAYING OF CABLES…)
A. Building Permit
B. Business or Mayor’s Permit
C. HOA clearance, Consent from Adjacent Lot owners
ARTA JMC 2023-001- DOCUMENTARY REQUIREMENTS

CLEARANCE NOT REQUIRED FROM OTHER GOVERNMENT


AGENCIES (FOR OPERATION & MAINTENANCE)
A. Proof of payment of LGU-imposed Construction Bond
B. Copy of Occupancy Permit
C. Proof of Payment of Contractor’s Tax
D. All other requirements not mentioned in Section 18 under the
IRR.
MINIMUM LOCATIONAL GUIDELINES (PER DHSUD DO 2020-009)
RICE AND CORNMILL
RICE AND CORN MILLS
HLURB MC 2017-03: Mandatory Consultation with Stakeholders or Landowners
Affected by Rezoning or Agricultural Land Reclassification.
HLURB BR 1984-181: Approving The Rules And Regulations Of Sawmill, Rice And
Corn Mill, Poultry And Piggery, Funeral Parlors/ Memorial Chapels/Mortuaries,
Cockpits, Public Market And Industrial Subdivisions.
HLURB BR 1981-039: Approving Design Standards And Guidelines For Rice Mill,
Cockpit, Piggery And Land Use Planning For Areas For Priority Development.
CORN MILL

CLASSIFICATION:
1. Single Pass Corn Mill
- Capacity 125 to 1,500 Kgs. Per hour &
62 % milling recovery
- TYPES: Roller and Grinder Corn Mill
2. Multi Pass Corn Mill
- Capacity of 2,000n Kg. To 6,000
Kg./hour w/ 63 % milling recovery
- TYPES: Roller and Grinder Corn Mill
RICE MILL
CLASSIFICATION:
1. Single Pass Rice Mill
- Capacity ranges from 200 to 2,000
kgs. With 60 to 63 % milling recovery
- TYPES: Kiskisan, small & portable
rubber roller, small & centrifugal type
2. Multi Pass Corn Mill
- Capacity of 2,500 to 10,000 kgs.
Per hour with 63 to 67 % milling
recovery
- TYPES: Cone type, rubber roller,
centrifugal/impact type rice mill
LOCATIONAL GUIDELINES FOR BOTH MILLS

SITE Ideal slope of 5%. not subject to flooding and soil foundation
must be able to support machineries & building
LOCATION availability & accessibility of roads, rivers, railways
space for parking loading/unloading and maneuver area
SETBACK 30M along major roads
25M secondary roads
10M tertiary roads
ZONE Agri-industrial/Agricultural
LOCATIONAL GUIDELINES FOR BOTH MILLS

AREA Single pass mills – at least 220 square


meters
Multi pass mills – at least 300 square
meters
25 to 35% for open space
SAW MILL
SAWMILL
HLURB MC 2017-03: Mandatory Consultation with Stakeholders or Landowners
Affected by Rezoning or Agricultural Land Reclassification.
HLURB BR 1984-181: Approving The Rules And Regulations Of Sawmill, Rice And
Corn Mill, Poultry And Piggery, Funeral Parlors/ Memorial Chapels/Mortuaries,
Cockpits, Public Market And Industrial Subdivisions.
HLURB BR 1982-051: Ratifying Resolution No. 36, S. 1982, Of The Executive
Committee, Approving Design Standards And Guidelines For Sawmill, Public
Market, Funeral Parlor, Industrial Estate, Memorial Park/Cemetery, Commercial
Center, And Procedure On Area For Priority Development (APD) Site Planning.
SAWMILL

SITE CRITERIA DESIGN REQUIREMENTS:


✓ Ideal slope 5% ✓ Minimum Area – 5,000 sq.m.
✓ Located in Industrial zone (0.5 Has.)
✓ Away from residential and ✓ Building space – 10 to15% from
other non-compatible uses total area for production area
✓ Must be near or proximate
to the sources of supply ✓ ECC from EMB-DENR
✓ Accessible
✓ Layout – permit
progressive for future
needs and expansion
SAWMILL

GENERAL PROVISION FOR FACILITIES


✓ Sawmill area
✓ Lumberyard/stockyard
✓ Warehouse
✓ Administrative office
✓ Sawdust disposal box
✓ Loading & unloading area
SLAUGHTERHOUSE/ABATTOIR
SLAUGHTERHOUSE/ABATTOIR

HLURB BR 2015-925: Amending commission proper Resolution no. R-247, S. 1985,


the Guidelines governing the application for slaughterhouse/abattoir, one of
ten (10) projects considered of National and local Significance.
SLAUGHTERHOUSE/ABATTOIR
Those with facilities and operational procedures
“AAA” appropriate to slaughter food animals, or premises to
cut and pack carcasses or primal parts, or
establishments to process and manufacture meat and
meat products for distribution and sale for domestic
and international meat trade.
“AA” sufficiently adequate to slaughter food animals, or
premises to cut and pack carcasses or primal parts; or
establishments to process and manufacture meat and
meat products for interprovincial distribution and sale
in any meat market nationwide.
SLAUGHTERHOUSE/ABATTOIR

“A” of minimum adequacy to slaughter food animals; or


premises to cut and pack carcasses or primal parts'
or establishments to process and manufacture
meat and meat products for intra-provincial
distribution and sale in any meat market within the
province
Locally meat establishments that are allowed to operate by
the respective LGU wherein the meat inspection is
registered supervised by the Municipal or City Meat
meat Inspection Office.
establishment
SLAUGHTERHOUSE/ABATTOIR

MINIMUM DISTANCE
200 METERS Residential areas, schools, churches and other
places of public assembly, funeral establishments,
assembly courts or public office
25 METERS Markets and other food establishments
SLAUGHTERHOUSE/ABATTOIR

ZONING CLASSIFICATION (Board Res. No. 925 s. 2015)


Heavy Industrial Zone (I-3) AAA, AA, A
Medium Industrial (I-2) AAA, AA, A
Agri-Industrial Zone AAA, AA, A
Agriculture Zone AA, A, local
FUNERAL ESTABLISHMENTS
FUNERAL ESTABLISHMMENTS
HLURB BR 1999-638: Approving The Amendments To The Implementing Rules And
Regulations Governing The Processing Of Applications For Locational Clearance
Of Funeral Establishments.
HLURB BR 1984-181: Approving The Rules And Regulations Of Sawmill, Rice And
Corn Mill, Poultry And Piggery, Funeral Parlors/ Memorial Chapels/Mortuaries,
Cockpits, Public Market And Industrial Subdivisions.
HLURB BR 1982-051: Ratifying Resolution No. 36, S. 1982, Of The Executive
Committee, Approving Design Standards And Guidelines For Sawmill, Public
Market, Funeral Parlor, Industrial Estate, Memorial Park/Cemetery, Commercial
Center, And Procedure On Area For Priority Development (APD) Site Planning.
FUNERAL ESTABLISHMENTS

Includes funeral parlors, funeral chapels and


any similar place used in the preparation,
storage and care of the body of a deceased
person for burial or cremation.
FUNERAL ESTABLISHMENTS

✓ ECC/CNC for Category I project


✓ Conducts site Inspection
❖ conformity with the ZO
❖ accessibility
❖ Presence/ability to provide facilities in the site
❖ degree of traffic generation
❖ determine the area is not flood
❖ prone area
FUNERAL ESTABLISHMENTS

CATEGORY
I with chapels & embalming facilities &
offering funeral services
II with chapels, and offering funeral services
III offering funeral services from the house of
deceased to the burial place
FUNERAL ESTABLISHMENTS

CATEGORY ZONING CLASSIFICATION


I C2
II GRZ, GCZ, C1, C2, GIZ, SIZ
III GRZ, GCZ, C1, C2, GIZ, SIZ
Should conform with the zoning ordinance.
FUNERAL ESTABLISHMENTS

CATEGORY MINIMUM LAND AREA


I 600 sqm
II 420 sqm
III 280 sqm
FUNERAL ESTABLISHMENTS

Minimum
distance
requirement
MARKET
HLURB BR 2002-729: Approving The Deletion Of Department Of Agrarian Reform
(DAR) Exemption Clearance From The List Of Documentary Requirements
Prescribed In The Rules And Regulations To Govern The Processing Of
Applications For Locational Clearance For Poultry And Piggery Projects, Markets
And The Implementing Rules And Regulations For Memorial Parks And
Cemeteries.
HLURB BR 2000-682: Approving The Amendments To The Implementing Rules And
Regulations Governing The Processing Of Applications For Locational Clearance
Of Markets.
HLURB BR 1984-181: Approving The Rules And Regulations Of Sawmill, Rice And
Corn Mill, Poultry And Piggery, Funeral Parlors/ Memorial Chapels/Mortuaries,
Cockpits, Public Market And Industrial Subdivisions.
MARKET
MARKET

Public Market – a market owned ,


operated and/or managed by the
government intended to the general
public.

Private Market – a market, owned,


operated and/or managed by private
individuals or entities, cooperatives,
institution or corporation.
MARKET
Food Terminal – products such as
seafoods, fruits, vegetables, and other
food merchandise are being sold in
wholesale basis (e.g. fish landing, trading
posts, “bagsakan”, “consignation”).
Satellite Market / Talipapa – less than
150 stalls that cater to a limited number
of customers.
Wet Market – most of the commodities
for sale are readily perishable.
MARKET
Supermarket – distinct from a wet or dry
market and larger than a grocery in which
shoppers serve themselves by using baskets
or pushcarts in selecting commodities from
shelves or cold display storage and pay their
purchase at the exit.

Dry Market – most merchandise


displayed for sale are dry goods.
MARKET
✓ Site Development plan indicating lot boundaries,
circulation/road network, parking, building
site/buildable area, future expansion if any.
✓ ECC from EMB-DENR
✓ ZONE – Commercial
✓ Market must be near a terminal, walking
distance of .75 km
✓ large enough to accommodate all activities
✓ Circulations
✓ Parking
✓ Landscaping and buffering (Min. of 5 meters
along perimeter of the site)
✓ GENERAL GUIDELINES MARKET
MARKET
UTILITY REQUIREMENTS
✓ Water
✓ Sewage Disposal and
Drainage
✓ Power
✓ Fire Safety
Equipment/Facility
MARKET
FACILITY REQUIREMENT
REQUIREMENTS

✓ Waste Disposal

✓ Toilet and Hand-washing


Facilities
Cockpit
COCKPIT

HLURB BR 1984-181: Approving The Rules And Regulations Of Sawmill, Rice And
Corn Mill, Poultry And Piggery, Funeral Parlors/ Memorial Chapels/Mortuaries,
Cockpits, Public Market And Industrial Subdivisions.
HLURB BR 1981-039: Approving Design Standards And Guidelines For Rice Mill,
Cockpit, Piggery And Land Use Planning For Areas For Priority Development.
COCKPIT
• 1 cockpit / municipality/ 100,000 population is allowed

Distance:
❖ 200 to 500 M from
National Highway
❖ 200 meters radial
distance from
Residential, Commercial,
Institutional uses
Area:
❖ one hectare for every 1,000
spectators
THANK YOU!
DHSUD9, Bajamunde Compound, Roxas-Broca, Santa Maria District
Pagadian City, Zamboanga del Sur

DHSUD.GOV.PH Region9@dhsud.gov.ph
R9 ONLINE LAND USE PLANNING
ARCHIVE (eLUPA)