:BIOPOWER
‘SOUTH NEGROS BIOPOWER, INC.
SOUTH NEGROS BIOPOWER INC.
‘National Highway, BrayCubay,
La Carlota City, Pils.
Transmittal Refi, swap-swap-7.4a.000
To: Page 1(1)
Date November 16, 2019
M & J Philippines-M & J Site From Jose Antonio M. Monisit
South Negros Biopower project e-mail _monisim@biopower.com.ph
Brgy. Cubay, La Carlota City
‘Attention: Mr. Donard Perater — Project Manager, M & J
Bh As agreed O For comments O01 Please retum
I For your information CO For approval OO Please telephone
BB For signature For your file Returned with comments
OO For Review 0 As requested Il For action
Enclosure
DocumentDrawing No. Object title Copies Remarks
Site Instruction
SNBP-SNB-SI-M-M&4J- | Fabrication of Boiler Vibrating Grate Sealing i Cony
001-RO Plates & Fuel Feeder Guide Flange Expansion
Plate
Noted by:
Jose Antoni
SNBP - Site Manager
EIB 20/9
Date
‘one copy of this transmittal to the sender.BiIoOPOWER
SOUTH NEGROS BIOPOWER, INC.
Contractor: M & J Fabrication & Installation Inc.
ucleren yon
TEIN
Project: SOUTH NEGROS BIOPOWER PLANT PROJECT
Contract No. [Site Instruction No. SNBP-SNB-SI-V-M8J-001-RO|Date:__ Nov 16, 2019,
COR Reference:
‘Subject: Fabrication of Boiler Vibrating Grate Sealing plates & Fuel Feeder Guide flange expansion plate
Details:
1 Fabrication of SS Sealing plates & guide fiange expansion plate
for oe Virating Grates 6 ue Feder spective Tew
2. SNBP will provide sample for every set of sealing plates & guide flange.
3. M &.J will provide Stainless Steel grade 304 material
4. M & 1 will fabricate 20 pcs per set of VG Sealing Plates & 6 pcs for Fuel
Feeder guide flange expansion plate in accordance w/the sample
dimension & thickness.
5. M & J will deliver the items stated above w/in 7days upon issuance
of this Site Instruction.
Schedule Impact: vs (no
Gost Category: Tl femeaurabie LJ nocos Lltumpsum Clpaywork LJ] other
Drawing to be amended: Cvs Hino
‘Attachments (if any):
Reference Docs/Dwgs:
NAME SIGNATURE DATE,
Signed by
Resident Engineer:
Verified by i
Mechanical Engineer: Carlito V. Genosa Jr. i Nov. 16, 2019
“Agreed by
Approved By. Se 19.11.16
Construction Jose Antonio M. Monisit —_
Re ane | Open oo fae Pp 10-0000
Follow up linspection undertaken by: on (date)
Tr Satisfactory Ti Unsatisfactory
(NCR No. )
Distributions: