Download as pdf
Download as pdf
You are on page 1of 2
:BIOPOWER ‘SOUTH NEGROS BIOPOWER, INC. SOUTH NEGROS BIOPOWER INC. ‘National Highway, BrayCubay, La Carlota City, Pils. Transmittal Refi, swap-swap-7.4a.000 To: Page 1(1) Date November 16, 2019 M & J Philippines-M & J Site From Jose Antonio M. Monisit South Negros Biopower project e-mail _monisim@biopower.com.ph Brgy. Cubay, La Carlota City ‘Attention: Mr. Donard Perater — Project Manager, M & J Bh As agreed O For comments O01 Please retum I For your information CO For approval OO Please telephone BB For signature For your file Returned with comments OO For Review 0 As requested Il For action Enclosure DocumentDrawing No. Object title Copies Remarks Site Instruction SNBP-SNB-SI-M-M&4J- | Fabrication of Boiler Vibrating Grate Sealing i Cony 001-RO Plates & Fuel Feeder Guide Flange Expansion Plate Noted by: Jose Antoni SNBP - Site Manager EIB 20/9 Date ‘one copy of this transmittal to the sender. BiIoOPOWER SOUTH NEGROS BIOPOWER, INC. Contractor: M & J Fabrication & Installation Inc. ucleren yon TEIN Project: SOUTH NEGROS BIOPOWER PLANT PROJECT Contract No. [Site Instruction No. SNBP-SNB-SI-V-M8J-001-RO|Date:__ Nov 16, 2019, COR Reference: ‘Subject: Fabrication of Boiler Vibrating Grate Sealing plates & Fuel Feeder Guide flange expansion plate Details: 1 Fabrication of SS Sealing plates & guide fiange expansion plate for oe Virating Grates 6 ue Feder spective Tew 2. SNBP will provide sample for every set of sealing plates & guide flange. 3. M &.J will provide Stainless Steel grade 304 material 4. M & 1 will fabricate 20 pcs per set of VG Sealing Plates & 6 pcs for Fuel Feeder guide flange expansion plate in accordance w/the sample dimension & thickness. 5. M & J will deliver the items stated above w/in 7days upon issuance of this Site Instruction. Schedule Impact: vs (no Gost Category: Tl femeaurabie LJ nocos Lltumpsum Clpaywork LJ] other Drawing to be amended: Cvs Hino ‘Attachments (if any): Reference Docs/Dwgs: NAME SIGNATURE DATE, Signed by Resident Engineer: Verified by i Mechanical Engineer: Carlito V. Genosa Jr. i Nov. 16, 2019 “Agreed by Approved By. Se 19.11.16 Construction Jose Antonio M. Monisit —_ Re ane | Open oo fae Pp 10-0000 Follow up linspection undertaken by: on (date) Tr Satisfactory Ti Unsatisfactory (NCR No. ) Distributions:

You might also like