12e-C01 Rfis & Hprs Log Updated 28-Jan-2024

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 30

CONTRACT NO.

: 12E-C01
PROJECT NAME: SITE PREPARATION FOR INDUSTRIAL WASTE MANAGEMENT FACILITY IN RIC (IWMF)
PROJECT LOCATION: RAS ALKHAIR INDUSTRIAL CITY
Updated :- 28-JAN -2024

RFIs & HPRs LOG (CIVIL)

Submitted Related ITP RC


RFI.NO HPR No. Area Block Monitoring Type Item To Inspect Inspection RC FIELD ENGINEER MMAH QCI Resolution Discipline
Date No. Date

MMAH-CE- VISUAL INSPECTION FOR PROJECT


CE-0001- 001_01,02,03,0 VISUAL INSPECTION 12E-C01 OVERALL TOPOGRAPHIC
CE-0001 27-Dec-22 TOPO 28-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
Canceled 4,REV.01 SURVEY
12E-C01 OVERALL TOPOGRAPHIC
SURVEY

VISUAL INSPECTION FOR WATER


12E-C01 PROJECT BLOCK-F-6 WATER MMAH-CE-
SAMPLING FOR LAB TEST PRIOR
CE-0002 Witness 24-Nov-22 WATER WATER TEST 26-Nov-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
WELL 002_2.1 REV.00
TO SOIL MIXING & COMPACTION
AT 12E-C01 PROJECT BLOCK-F-6
WATER WELL

VISUAL INSPECTION FOR


CLEARING & GRUBBING PRIOR TO
12E-C01 - (F-9) OFFICE & LAY-DOWN MMAH-CE-
CE-0003 Witness 5-Dec-22 F9 002_1.4 REV.00 VISUAL INSPECTION CUTTING & BACKFILLING AT 12E- 3-Dec-22 ABDUL HANNAN Accepted CIVIL
ENGR.FARHAT ZAMAN
AREA
C01 - (F-9) OFFICE & LAY-DOWN
AREA

MATERIAL SAMPLING FOR SOIL


CLASSIFICATION PRIOR TO
12E-C01 - (F-9) OFFICE & LAY-DOWN MMAH-CE-
CE-0004 CE-0002 27-Nov-22 F9 SOIL CLASSIFICATION BACKFILLING AT 12E-C01 12E- 28-Nov-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00
C01 - (F-9) SOIL CLASSIFICATION
FOR FILL MATERIALS

MATERIAL SAMPLE COLLECTION


FOR SOIL CLASSIFICATION PRIOR
(BORROW PIT N0-01 :- E MMAH-CE-
CE-0005 CE-0005 5-Dec-22 BORROW PIT 002_2.1 SOIL CLASSIFICATION TO BACKFILLING AT (BORROW PIT 12-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
304832.7822 , N 3039709.9737) REV.00
N0-01 :- E
304832.7822 , N 3039709.9737)

FDT & SURVEY INSPECTION FOR


MMAH-CE- SUBGRADE PRIOR TO 1ST LAYER
CE-0006 CE-0006 7-Dec-22 12E-C01 AREA (F-9) ACCESS ROAD F9 FDT & SURVEY 8-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
002_2.3 REV.00 BACKFILLING AT 12E-C01 AREA (F-
9) ACCESS ROAD
VISUAL INSPECTION FOR
CLEARING & GRUBBING PRIOR TO
CUTTING & BACKFILLING AT
12E-C01 ARAE (F-9)ALL , EXCLUDED OFFICE,LAY- PROJECT 12E-C01 ARAE (F-9)ALL ,
DOWN & ACCESS ROAD TOWARDS OFFICE & LAY- MMAH-CE-
CE-0007 Witness 25-Dec-22 DOWN AREA & TMP ACCESS ROAD NO 1 AND
F9
002_1.4 REV.00 VISUAL INSPECTION EXCLUDED OFFICE,LAY-DOWN & 26-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
ROAD NO.2 AREA ACCESS ROAD TOWARDS OFFICE
& LAY-DOWN AREA & TMP
ACCESS ROAD NO 1 AND ROAD
NO.2 AREA
FDT & SURVEY INSPECTION 1ST
MMAH-CE- LAYER BACKFILLING PRIOR TO 2ND
CE-0008 CE-0007 8-Dec-22 12E-C01 (F-9) OFFICE AREA ONLY F9 FDT & SURVEY 11-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 LAYER AT 12E-C01 (F-9) OFFICE
AREA ONLY

FDT & SURVEY INSPECTION FOR


12E-C01 AREA (F-9) LAY-DOWN AREA MMAH-CE- 1ST LAYER BACKFILLING PRIOR TO
CE-0009 CE-0008 8-Dec-22 F9 FDT & SURVEY 11-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
ONLY 002_2.1 REV.00 2ND LAYER AT 12E-C01 AREA (F-9)
LAY-DOWN AREA ONLY

FDT & SURVEY INSPECTION FOR


MMAH-CE-
CE-0010 CE-0009 11-Dec-22 12E-C01 (F-9) OFFICE AREA ONLY F9 002_2.1 REV.00 FDT & SURVEY FINAL LAYER BACKFILLING AT 12E- 12-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
C01 (F-9) OFFICE AREA ONLY

FDT & SURVEY INSPECTION FOR


12E-C01 AREA (F-9) LAY-DOWN AREA MMAH-CE- 2ND LAYER BACKFILLING PRIOR TO
CE-0011 CE-0010 12-Dec-22 F9 FDT & SURVEY 13-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
ONLY 002_2.1 REV.00 3RD LAYER AT 12E-C01 AREA (F-9)
LAY-DOWN AREA ONLY

FDT & SURVEY INSPECTION FOR


12E-C01 AREA (F-9) LAY-DOWN AREA MMAH-CE- 3RD LAYER BACKFILLING PRIOR TO
CE-0012 CE-0011 14-Dec-22 F9 FDT & SURVEY 15-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
ONLY 002_2.1 REV.00 4TH LAYER AT 12E-C01 AREA (F-9)
LAY-DOWN AREA ONLY

FDT & SURVEY INSPECTION FOR


12E-C01 AREA (F-9) LAY-DOWN AREA MMAH-CE- 4TH LAYER BACKFILLING PRIOR TO
CE-0013A CE-0012 17-Dec-22 F9 FDT & SURVEY 18-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
ONLY 002_2.1 REV.00 FINAL LAYER AT 12E-C01 AREA (F-
9) LAY-DOWN AREA ONLY

MATERIAL SAMPLING FOR SOIL


CLASSIFICATION PRIOR TO
CE-0003 - not MMAH-CE- BACKFILLING AT 12E-C01 12E- Rejected / NOT
CE-0014 29-Nov-22 12E-C01 - BLOCK-36 (F-9) F9 SOIL CLASSIFICATION 30-Nov-22 ENGR.FARHAT ZAMAN ABDUL HANNAN CIVIL
signed 002_2.1 REV.00 C01 - AREA (F-9) LAY-DOWN NEAR SIGN
AREA FOR SOIL CLASSIFICATION
FOR FILL MATERIALS

VISUAL INSPECTION FOR


CLEARING & GRUBBING PRIOR TO
MMAH-CE- CUTTING & BACKFILLING AT 12E-
CE-0015 Witness 3-Dec-22 12E-C01 - BLOCK-36 (F-9) F9 002_1.4 REV.00 VISUAL INSPECTION C01 AREA (F-9) - ACCESS ROAD 4-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
TOWARDS 12E-C01 OFFICE & LAY-
DOWN AREA

FDT & SURVEY INSPECTION FOR


12E-C01 - (F-9) OFFICE & LAY-DOWN MMAH-CE- SUBGRADE PRIOR TO 1ST LAYER
CE-0016 CE-0004 3-Dec-22 F9 FDT & SURVEY 4-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING AT 12E-C01 (F-9)
OFFICE & LAY-DOWN AREA

FDT & SURVEY INSPECTION FOR


12E-C01 AREA (F-9) LAY-DOWN AREA MMAH-CE- FINAL LAYER BACKFILLING LAYER
CE-0017 CE-0013 17-Dec-22 F9 FDT & SURVEY 18-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
ONLY 002_2.1 REV.00 AT 12E-C01 AREA (F-9) LAY-DOWN
AREA ONLY

VISUAL INSPECTION FOR


CLEARING & GRUBBING PRIOR TO
12E-C01 - TMP ACCESS ROAD STATIONS ACCESS ROAD MMAH-CE- CUTTING & BACKFILLING AT 12E-
CE-0018 Witness 17-Dec-22 002_1.4 REV.00 VISUAL INSPECTION C01 - TMP ACCESS ROAD-01 18-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
1+650 TO 2+362 & 2+900 TO 3+173 N0 2
STATIONS 1+650 TO 2+362 &
2+900 TO 3+173

FDT & SURVEY INSPECTION FOR


12E-C01 - TMP ACCESS ROAD -02 ACCESS ROAD MMAH-CE- (NGL) SUB GRADE AT 12E-C01 -
CE-0019 CE-0014 18-Dec-22 FDT & SURVEY 19-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 1+650 TO 2+362 N0 2 002_2.1 REV.00 TMP ACCESS ROAD -02 STATIONS
1+650 TO 2+362

VISUAL INSPECTION FOR


CLEARING & GRUBBING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 MMAH-CE-
CE-0020 Witness 18-Dec-22 ACCESS ROAD 002_1.4 REV.00 VISUAL INSPECTION CUTTING & BACKFILLING AT 12E- 19-Dec-22 ABDUL HANNAN Accepted CIVIL
ENGR.FARHAT ZAMAN
STATIONS 0+000TO 1+650
C01 - TMP ACCESS ROAD NO-02
STATIONS 0+000TO 1+650
FDT & SURVEYOR INSPECTION FOR
12E-C01 - TMP ACCESS ROAD NO-01
ACCESS ROAD MMAH-CE- NGL SUB-GARDE AT 12E-C01 -
CE-0021 CE-0015 19-Dec-22 STATIONS AND STATIONS 2+900 TO FDT & SURVEY 20-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
N0 1 002_2.1 REV.00 TMP ACCESS ROAD NO-01
3+173
STATIONS 2+900 TO 3+173

SOIL SAMPLING COLLECTION FOR


MMAH-CE-
CE-0022 CE-0016 19-Dec-22 12E-C01 AREA (F-9) CUTTING AREA F9 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 20-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
AREA (F-9) CUTTING AREA

FDT & SURVEYOR INSPECTION FOR


AT 12E-C01 - TMP ACCESS ROAD NO-02 NGL SUB-GARDE AT 12E-C01 -
ACCESS ROAD MMAH-CE-
CE-0023 CE-0017 20-Dec-22 STATIONS 0+000 TO 0+300 AND 1+200 FDT & SURVEY TMP ACCESS ROAD NO-02 21-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
NO 02 002_2.1 REV.00
TO 1+650 STATIONS 0+000 TO 0+300 AND
1+200 TO 1+650

SOIL SAMPLING COLLECTION FOR


12E-C01 TMP ACCESS ROAD-2 STA: ACCESS ROAD MMAH-CE- SOIL CLASSIFICATION AT 12E-C01
CE-0024 CE-0018 20-Dec-22 SOIL CLASSIFICATION 21-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
0+700 CUTTING AREA N0 02 002_2.1 REV.00 TMP ACCESS ROAD-2 STA: 0+700
CUTTING AREA

FDT & SURVEYOR INSPECTION FOR


1ST LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE-
CE-0025 CE-0019 24-Dec-22 FDT & SURVEY 2ND LAYER AT 12E-C01 - TMP 25-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+900 TO 3+173 N0 02 002_2.1 REV.00
ACCESS ROAD NO-01 STATIONS
2+900 TO 3+173

FDT & SURVEYOR INSPECTION FOR


1ST LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0026 CE-0020 24-Dec-22 FDT & SURVEY 2ND LAYER AT 12E-C01 - TMP 25-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+000 TO 2+362 NO 02 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
2+000 TO 2+362

FDT & SURVEYOR INSPECTION FOR


1ST LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0027 CE-0021 25-Dec-22 FDT & SURVEY 2ND LAYER AT 12E-C01 - TMP 26-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 1+400 TO 2+000 NO 02 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
1+400 TO 2+000

VISUAL INSPECTION FOR


CLEARING & GRUBBING PRIOR TO
12E-C01 TMP ACCESS ROAD NO-03 ACCESS ROAD MMAH-CE- CUTTING & BACKFILLING AT
CE-0028 Witness 26-Dec-22 002_1.4 REV.00 VISUAL INSPECTION PROJECT 12E-C01 TMP ACCESS 27-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS : 2+560 TO 2+900 NO 02
ROAD NO-03 STATIONS : 2+560 TO
2+900

FDT & SURVEYOR INSPECTION FOR


1ST LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0029 CE-0022 26-Dec-22 FDT & SURVEY 2ND LAYER AT 12E-C01 - TMP 27-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 1+400 TO 1+300 NO 02 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
1+400 TO 1+300

FDT & SURVEYOR INSPECTION FOR


2ND LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE-
CE-0030 CE-0023 26-Dec-22 FDT & SURVEY 3RD LAYER AT 12E-C01 - TMP 27-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+900 TO 3+173 N0 1 002_2.1 REV.00
ACCESS ROAD NO-01 STATIONS
2+900 TO 3+173

FDT & SURVEYOR INSPECTION FOR


2ND LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE-
CE-0031 CE-0024 26-Dec-22 FDT & SURVEY 3RD LAYER AT 12E-C01 - TMP 27-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+000TO 2+362 NO 02 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
2+000 TO 2+362

FDT FOR FINAL DESIGN LEVEL


MMAH-CE- ENGR. TURKI
CE-0032 CE-0025 7-Jan-23 12E-C01 AREA (F-9) F-A AND F-B F 9 (F 9A F9 C
002_2.1 REV.00 FDT & SURVEY AFTER CUTTING AT 12E-C01 8-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
AREA (F-9) F9-A AND F9-C

VISUAL INSPECTION FOR


MMAH-CE- CLEARING & GRUBBING PRIOR TO
CE-0033A Witness 31-Dec-22 12E-C01 AREA (A-A) ALL AREA A 002_1.4 REV.00 VISUAL INSPECTION CUTTING & BACKFILLING AT 1-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
PROJECT 12E-C01 AREA (A-A)

FDT & SURVEYOR INSPECTION FOR


1ST LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE-
CE-0034 CE-0026 26-Dec-22 FDT & SURVEY 2ND LAYER AT 12E-C01 - TMP 27-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 3+250 TO 3+173 NO 01 002_2.1 REV.00
ACCESS ROAD NO-01 STATIONS
3+250 TO 3+173

FDT & SURVEYOR INSPECTION FOR


NGL SUB-GRADE LAYER
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE-
CE-0035 CE-0027 26-Dec-22 FDT & SURVEY BACKFILLING PRIOR TO 1ST LAYER 27-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 3+250 TO 3+173 NO 01 002_2.1 REV.00
AT 12E-C01 - TMP ACCESS ROAD
NO-01 STATIONS 3+250 TO 3+173

FDT & SURVEYOR INSPECTION FOR


2ND LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0036 CE-0028 27-Dec-22 FDT & SURVEY 3RD LAYER AT 12E-C01 - TMP 28-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+000 TO 1+300 NO 02 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
2+000 TO 1+300

FDT & SURVEYOR INSPECTION FOR


3RD LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE-
CE-0037 CE-0029 28-Dec-22 FDT & SURVEY 4TH LAYER AT 12E-C01 - TMP 29-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+900 TO 3+173 NO 01 002_2.1 REV.00
ACCESS ROAD NO-01 STATIONS
2+900 TO 3+173

FDT & SURVEY INSPECTION FOR


NGL-SUBGRADE PRIOR TO 1ST
12E-C01 TMP ACCESS ROAD NO-03 ACCESS ROAD MMAH-CE-
CE-0038 CE-0030 28-Dec-22 FDT & SURVEY LAYER BACKFILLING AT 12E-C01 29-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS : 2+560 TO 2+900 NO 03 002_2.1 REV.00
TMP ACCESS ROAD NO-03
STATIONS : 2+560 TO 2+900

FDT & SURVEYOR INSPECTION FOR


3RD LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0039 CE-0031 28-Dec-22 FDT & SURVEY 4TH LAYER AT 12E-C01 - TMP 29-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 1+300 TO 2+000 NO 02 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
1+300 TO 2+000

FDT & SURVEYOR INSPECTION FOR


3RD LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0040 CE-0032 28-Dec-22 FDT & SURVEY 4TH LAYER AT 12E-C01 - TMP 29-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+000 TO 2+362 NO 03 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
2+000 TO 2+362

FDT & SURVEYOR INSPECTION FOR


2ND LAYER BACKFILLING PRIOR TO
ACCESS ROAD MMAH-CE-
CE-0041 CE-0033 28-Dec-22 FDT & SURVEY 4TH LAYER AT 12E-C01 - TMP 29-Dec-22 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
NO 01 002_2.1 REV.00
ACCESS ROAD NO-01 STATIONS
12E-C01 - TMP ACCESS ROAD NO-01 3+250 TO 3+173
STATIONS 3+250 TO 3+173

FDT & SURVEYOR INSPECTION FOR


3RD LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE-
CE-0042 CE-0034 1-Jan-23 FDT & SURVEY 4TH LAYER AT 12E-C01 - TMP 2-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 3+250 TO 3+173 NO 01 002_2.1 REV.00
ACCESS ROAD NO-01 STATIONS
3+250 TO 3+173

FDT & SURVEYOR INSPECTION FOR


1ST LAYER PRIOR TO 2ND LAYER
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0043 CE-0035 31-Dec-22 FDT & SURVEY AT 12E-C01 - TMP ACCESS ROAD 1-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 0+000 TO 0+300 NO 02 002_2.1 REV.00
NO-02 STATIONS 0+000 TO
0+300
FDT & SURVEYOR INSPECTION FOR
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE- NGL SUB GRADE AT 12E-C01 -
CE-0044 CE-0036 31-Dec-22 FDT & SURVEY 1-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+362 TO 2+560 NO 02 002_2.1 REV.00 TMP ACCESS ROAD NO-02
STATIONS 2+362 TO 2+560

FDT & SURVEY INSPECTION FOR


1ST LAYER BACKFILLING PRIOR TO
12E-C01 TMP ACCESS ROAD NO-03 ACCESS ROAD MMAH-CE-
CE-0045 CE-0037 31-Dec-22 FDT & SURVEY 2ND LAYER AT 12E-C01 TMP 1-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS : 2+560 TO 2+900 NO 03 002_2.1 REV.00
ACCESS ROAD NO-03 STATIONS :
2+560 TO 2+900

VISUAL INSPECTION FOR


MMAH-CE- CLEARING & GRUBBING PRIOR TO ENGR. TURKI
CE-0046 Witness 8-Jan-23 AT 12E-C01 ALL PROJECT FENCE 002_1.4 REV.00 VISUAL INSPECTION INSTALLATION OF SECURITY FENCE 9-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ALL PROJECT

FDT & SURVEYOR INSPECTION FOR


1ST LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0047 CE-0038 1-Jan-23 FDT & SURVEY 2ND LAYER AT 12E-C01 - TMP 2-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+362 TO 2+56 NO 03 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS
2+362 TO 2+560

FDT & SURVEYOR INSPECTION FOR


4TH LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-02
ACCESS ROAD MMAH-CE- 5TH LAYER AT 12E-C01 - TMP
CE-0048 CE-0039 1-Jan-23 STATIONS 2+136 TO 2+216 AND 1+300 FDT & SURVEY 2-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
NO 03 002_2.1 REV.00 ACCESS ROAD NO-02 STATIONS
TO 2+000
2+136 TO 2+216 AND 1+300 TO
2+000

FDT & SURVEYOR INSPECTION FOR


4TH LAYER BACKFILLING PRIOR TO
12E-C01 - TMP ACCESS ROAD NO-01 ACCESS ROAD MMAH-CE- 5TH LAYER AT 12E-C01 - TMP
CE-0049 CE-0040 1-Jan-23 FDT & SURVEY 2-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS 2+900 TO 3+173 TO 3+2 50 NO 01 002_2.1 REV.00 ACCESS ROAD NO-01 STATIONS
2+960 TO 3+135 AND 3+173 TO
3+250

MMAH-CE- FDT & SURVEYOR INSPECTION FOR


CE-0050 CE-0041 4-Jan-23 AREA (A-A) A-1 A1 002_1.4 REV.00 VISUAL INSPECTION NGL SUB GRADE AREA (A-A) A-1 5-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL

FDT & SURVEY INSPECTION FOR


2ND LAYER BACKFILLING PRIOR TO
12E-C01 TMP ACCESS ROAD NO-03 ACCESS ROAD MMAH-CE-
CE-0051A CE-0042 3-Jan-23 FDT & SURVEY 3RD LAYER AT 12E-C01 TMP 4-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS : 2+560 TO 2+900 NO 01 002_2.1 REV.00
ACCESS ROAD NO-03 STATIONS :
2+560 TO 2+900

FDT & SURVEY INSPECTION FOR


2ND LAYER BACKFILLING PRIOR TO
12E-C01 TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE-
CE-0052 CE-0043 3-Jan-23 FDT & SURVEY 3RD LAYER AT 12E-C01 TMP 4-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
STATIONS : 0+000 TO 0+300 NO 02 002_2.1 REV.00
ACCESS ROAD NO-02 STATIONS :
0+000 TO 0+300

FDT & SURVEY INSPECTION FOR


ROAD ACCESS MMAH-CE- FINAL LAYER BACKFILLING AT
CE-0053 CE-0044 3-Jan-23 STATIONS TO BE VERIFIED FDT & SURVEY 4-Jan-23 ENGR.FARHAT ZAMAN ABDUL HANNAN Accepted CIVIL
NO 02 002_2.1 REV.00 12E-C01 - TMP ACCESS ROAD NO-
02 STATIONS 2+362 TO 2+560

FDT & SURVEY INSPECTION FOR


12E-C01 TMP ACCESS ROAD NO-03 ACCESS ROAD MMAH-CE- 3RD LAYER BACKFILLING AT 12E- ENGR. TURKI
CE-0054 CE-0045 7-Jan-23 FDT & SURVEY 8-Jan-23 ABDUL HANNAN Accepted CIVIL
STATIONS : 2+560 TO 2+900 NO 03 002_2.1 REV.00 C01 TMP ACCESS ROAD NO-03 AL MUTAIRI
STATIONS : 2+560 TO 2+900

FDT & SURVEY INSPECTION FOR


12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE- FINAL LAYER BACKFILLING AT ENGR. TURKI
CE-0055 CE-0046 7-Jan-23 FDT & SURVEY 8-Jan-23 ABDUL HANNAN Accepted CIVIL
STATIONS 1+500 TO 2+250 NO 02 002_2.1 REV.00 12E-C01 - TMP ACCESS ROAD NO- AL MUTAIRI
02 STATIONS 1+500 TO 2+250

FDT & SURVEY INSPECTION FOR


12E-C01 - TMP ACCESS ROAD NO-01 5TH LAYER BACKFILLING AT 12E-
ACCESS ROAD MMAH-CE- ENGR. TURKI
CE-0056 CE-0047 7-Jan-23 STATIONS 2+900 TO 3+173 AND 3+173 FDT & SURVEY C01 - TMP ACCESS ROAD NO-01 8-Jan-23 ABDUL HANNAN Accepted CIVIL
NO 01 002_2.1 REV.00 AL MUTAIRI
TO 3+250 STATIONS 2+900 TO 3+173 AND
3+173 TO 3+250

FDT & SURVEY INSPECTION FOR


12E-C01 - TMP ACCESS ROAD NO-02 ACCESS ROAD MMAH-CE- 3RD LAYER BACKFILLING AT 12E- ENGR. TURKI
CE-0057 CE-0048 7-Jan-23 FDT & SURVEY 8-Jan-23 ABDUL HANNAN Accepted CIVIL
STATIONS 0+000 TO 0+300 NO 02 002_2.1 REV.00 C01 - TMP ACCESS ROAD NO-02 AL MUTAIRI
STATIONS 0+000 TO 0+300

FDT & SURVEY INSPECTION FOR


NGL SUB GRADE LAYER
12E-C01 - AREA (F-9) NEAR OFFICE AND MMAH-CE- ENGR. TURKI
CE-0058 CE-0049 8-Jan-23 F9 FDT & SURVEY BACKFILLING AT 12E-C01 - AREA 9-Jan-23 ABDUL HANNAN Accepted CIVIL
LAY-DOWN AREA 002_2.1 REV.00 AL MUTAIRI
(F-9) NEAR OFFICE AND LAY-
DOWN AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- NGL SUB GRADE LAYER ENGR. TURKI
CE-0059 CE-0050 8-Jan-23 12E-C01 - AREA (A-A) A-3 / PART 01 A3 FDT & SURVEY 9-Jan-23 ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 BACKFILLING AT 12E-C01 - AREA AL MUTAIRI
(A-A) A-3 / PART 01

VISUAL INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0060 Witness 9-Jan-23 ( 12E-C01 - AREA-B ALL ) B ALL 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GRUBBING AT 10-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-B ALL )

VISUAL INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0061 Witness 9-Jan-23 ( 12E-C01 - AREA-F-10) F 10 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GRUBBING AT 10-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-F-10)

VISUAL INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0062 Witness 9-Jan-23 ( 12E-C01 - AREA-F-5) F5 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GRUBBING AT 10-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-F-5)

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0063 CE-0051 9-Jan-23 ( 12E-C01 - AREA-B- 5 B5 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 10-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-B- 5

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0064 CE-0052 9-Jan-23 ( 12E-C01 - AREA-F- 10 F 10 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 10-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-F- 10

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0065 CE-0053 9-Jan-23 ( 12E-C01 - AREA-F- 5 F5 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 10-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-F- 5

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0066 CE-0054 9-Jan-23 12E-C01 - AREA (A-A) A-3 / PART 02 A3 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 12E- 10-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
C01 - AREA (A-A) A-3 / PART 02
FDT & SURVEY INSPECTION FOR
TPM ACCESS ROAD -N-03 STATIONS ACCESS ROAD MMAH-CE- 4TH LAYER BACKFILLING PRIOR TO ENGR. TURKI
CE-0067 CE-0055 9-Jan-23 FDT & SURVEY 10-Jan-23 ABDUL HANNAN Accepted CIVIL
2+560 TO 2+900 NO 03 002_2.1 REV.00 5TH LAYER AT TPM ACCESS ROAD - AL MUTAIRI
N-03 STATIONS 2+560 TO 2+900

FDT & SURVEY INSPECTION FOR


4TH LAYER BACKFILLING PRIOR TO
AT 12E-C01 TPM ACCESS ROAD -No-02 ACCESS ROAD MMAH-CE- ENGR. TURKI
CE-0068 CE-0056 10-Jan-23 FDT & SURVEY 5TH LAYER AT 12E-C01 TPM 11-Jan-23 ABDUL HANNAN Accepted CIVIL
STATIONS 0+000 TO 0+300 NO 03 002_2.1 REV.00 AL MUTAIRI
ACCESS ROAD -No-02 STATIONS
0+000 TO 0+300

FDT & SURVEY INSPECTION FOR


5TH LAYER BACKFILLING PRIOR TO
12E-C01 TPM ACCESS ROAD -N-03 ACCESS ROAD MMAH-CE- ENGR. TURKI
CE-0069 CE-0057 10-Jan-23 FDT & SURVEY 6TH LAYER AT 12E-C01 TPM 11-Jan-23 ABDUL HANNAN Accepted CIVIL
STATIONS 2+560 TO 2+900 NO 03 002_2.1 REV.00 AL MUTAIRI
ACCESS ROAD -NO-03 STATIONS
2+560 TO 2+900

FDT & SURVEY INSPECTION FOR


6TH LAYER BACKFILLING PRIOR TO
12E-C01 TPM ACCESS ROAD -NO-01
ACCESS ROAD MMAH-CE- 7TH LAYER AT 12E-C01 TPM ENGR. TURKI
CE-0070 CE-0058 10-Jan-23 STATIONS 2+900 TO 3+173 AND 3+173 FDT & SURVEY 11-Jan-23 ABDUL HANNAN Accepted CIVIL
NO 01 002_2.1 REV.00 ACCESS ROAD -NO-01 STATIONS AL MUTAIRI
TO 3+250
2+900 TO 3+173 AND 3+173 TO
3+250

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0071 CE-0059 10-Jan-23 ( 12E-C01 - AREA-B- 1) B1 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 11-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-B- 1)

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0072 CE-0060 10-Jan-23 ( 12E-C01 - AREA-B- 2) B2 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 11-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-B- 2)

VISUAL INSPECTION FOR


CLEARING & GRUBBING PRIOR TO
12E-C01 AREA (A-A) ALL EXCLUDED A-1 MMAH-CE- ENGR. TURKI
CE-0073 Witness 10-Jan-23
AND A-3
A3 002_1.4 REV.00 VISUAL INSPECTION CUTTING & BACKFILLING AT 11-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
PROJECT 12E-C01 AREA (A-A) ALL
EXCLUDED A-1 AND A-3

FDT & SURVEY INSPECTION FOR


( 12E-C01 - AREA-F- 9) AROUND MMAH-CE- 1ST LAYER BACKFILLING L AT ENGR. TURKI
CE-0074 CE-0061 10-Jan-23 F9 FDT & SURVEY 11-Jan-23 ABDUL HANNAN Accepted CIVIL
OFFICE AND LAY-DOWN AREA 002_2.1 REV.00 ( 12E-C01 - AREA-F- 9) AROUND AL MUTAIRI
OFFICE AND LAY-DOWN AREA

FDT & SURVEY INSPECTION FOR


12E-C01 TPM ACCESS ROAD -NO-03 ACCESS ROAD MMAH-CE- FINAL LAYER BACKFILLING AT 12E- ENGR. TURKI
CE-0075 CE-0062 11-Jan-23 FDT & SURVEY 12-Jan-23 ABDUL HANNAN Accepted CIVIL
STATIONS 2+560 TO 2+900 NO 03 002_2.1 REV.00 C01 TPM ACCESS ROAD -NO-03 AL MUTAIRI
STATIONS 2+560 TO 2+900

FDT & SURVEY INSPECTION FOR


( 12E-C01 - AREA-F- 9) AROUND OFFICE MMAH-CE- 2ND LAYER BACKFILLING L AT ( ENGR. TURKI
CE-0076 CE-0063 11-Jan-23 F9 FDT & SURVEY 12-Jan-23 ABDUL HANNAN Accepted CIVIL
AND LAY-DOWN AREA 002_2.1 REV.00 12E-C01 - AREA-F- 9) AROUND AL MUTAIRI
OFFICE AND LAY-DOWN AREA

FDT & SURVEY INSPECTION FOR


12E-C01 TPM ACCESS ROAD -No-02 ACCESS ROAD MMAH-CE- FINAL LAYER BACKFILLING AT 12E- ENGR. TURKI
CE-0077 CE-0064 11-Jan-23 FDT & SURVEY 12-Jan-23 ABDUL HANNAN Accepted CIVIL
STATIONS 0+000 TO 0+300 NO 02 002_2.1 REV.00 C01 TPM ACCESS ROAD -No-02 AL MUTAIRI
STATIONS 0+000 TO 0+300

FDT & SURVEY INSPECTION FOR


12E-C01 TPM ACCESS ROAD -NO-01 FINAL LAYER BACKFILLING AT 12E-
ACCESS ROAD MMAH-CE- ENGR. TURKI
CE-0078 CE-0065 14-Jan-23 STATIONS 2+900 TO 3+173 AND 3+173 FDT & SURVEY C01 TPM ACCESS ROAD -NO-01 15-Jan-23 ABDUL HANNAN Accepted CIVIL
NO 01 002_2.1 REV.00 AL MUTAIRI
TO 3+250 STATIONS 2+900 TO 3+173 AND
3+173 TO 3+250

VISUAL INSPECTION FOR


CLEARING & GRUBBING PRIOR TO
12E-C01 AREA (F-4) AROUND OFFICE MMAH-CE- CUTTING & BACKFILLING AT ENGR. TURKI
CE-0079 Witness 11-Jan-23 F4 002_1.4 REV.00 VISUAL INSPECTION PROJECT 12E-C01 AREA (F-4) 12-Jan-23 ABDUL HANNAN CIVIL
AND LAY-DOWN AREA AL MUTAIRI
AROUND OFFICE AND LAY-DOWN
AREA

FDT & SURVEY INSPECTION FOR


NGL SUB GRADE LAYER AT
2E-C01 AREA (F-4) AROUND OFFICE AND MMAH-CE- ENGR. TURKI
CE-0080 CE-0066 11-Jan-23 F4 FDT & SURVEY PROJECT 12E-C01 AREA (F-4) 12-Jan-23 ABDUL HANNAN Accepted CIVIL
LAY-DOWN AREA 002_2.1 REV.00 AL MUTAIRI
AROUND OFFICE AND LAY-DOWN
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0081 CE-0067 14-Jan-23 ( 12E-C01 - AREA(-A-A) A-2 A2 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 15-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA(-A-A) A-2

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0082 CE-0068 14-Jan-23 ( 12E-C01 - AREA(-A-A) A-4 A4 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE LAYER AT 15-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA(-A-A) A-4

FDT & SURVEY INSPECTION FOR


1ST LAYER BACFILLING AT
12E-C01 AREA (F-4) AROUND OFFICE MMAH-CE- ENGR. TURKI
CE-0083 CE-0069 15-Jan-23 F4 FDT & SURVEY PROJECT 12E-C01 AREA (F-4) 16-Jan-23 ABDUL HANNAN Accepted CIVIL
AND LAY-DOWN AREA 002_2.1 REV.00 AL MUTAIRI
AROUND OFFICE AND LAY-DOWN
AREA

FDT & SURVEY INSPECTION FOR


( 12E-C01 - AREA-F- 9) AROUND OFFICE MMAH-CE- 3RD LAYER BACKFILLING L AT ENGR. TURKI
CE-0084 CE-0070 15-Jan-23 F-9 FDT & SURVEY 16-Jan-23 ABDUL HANNAN Accepted CIVIL
AND LAY-DOWN AREA 002_2.1 REV.00 ( 12E-C01 - AREA-F- 9) AROUND AL MUTAIRI
OFFICE AND LAY-DOWN AREA

FDT & SURVEY INSPECTION FOR


2ND LAYER BACFILLING AT
12E-C01 AREA (F-4) AROUND OFFICE MMAH-CE- ENGR. TURKI
CE-0085 CE-0071 15-Jan-23 F4 FDT & SURVEY PROJECT 12E-C01 AREA (F-4) 16-Jan-23 ABDUL HANNAN Accepted CIVIL
AND LAY-DOWN AREA 002_2.1 REV.00 AL MUTAIRI
AROUND OFFICE AND LAY-DOWN
AREA

FDT & SURVEY INSPECTION FOR


( 12E-C01 - AREA-F- 9) AROUND OFFICE MMAH-CE- 4TH LAYER BACKFILLING L AT ENGR. TURKI
CE-0086 CE-0072 15-Jan-23 F9 FDT & SURVEY 16-Jan-23 ABDUL HANNAN Accepted CIVIL
AND LAY-DOWN AREA 002_2.1 REV.00 ( 12E-C01 - AREA-F- 9) AROUND AL MUTAIRI
OFFICE AND LAY-DOWN AREA

FDT & SURVEY INSPECTION FOR


FINAL LAYER BACFILLING AT
12E-C01 AREA (F-4) AROUND OFFICE MMAH-CE- ENGR. TURKI
CE-0087 CE-0073 16-Jan-23 F4 FDT & SURVEY PROJECT 12E-C01 AREA (F-4) 17-Jan-23 ABDUL HANNAN Accepted CIVIL
AND LAY-DOWN AREA 002_2.1 REV.00 AL MUTAIRI
AROUND OFFICE AND LAY-DOWN
AREA

FDT & SURVEY INSPECTION FOR


( 12E-C01 - AREA-F- 9) AROUND OFFICE MMAH-CE- FINAL LAYER BACKFILLING L AT ENGR. TURKI
CE-0088 CE-0074 16-Jan-23 F9 FDT & SURVEY 17-Jan-23 ABDUL HANNAN Accepted CIVIL
AND LAY-DOWN AREA 002_2.1 REV.00 ( 12E-C01 - AREA-F- 9) AROUND AL MUTAIRI
OFFICE AND LAY-DOWN AREA

FDT & SURVEY INSPECTION 1ST


12E-C01 ( AREA - F) F-8 IN LAYER BACKFILLING AT 12E-C01
MMAH-CE- ENGR. TURKI
CE-0089 CE-0075 17-Jan-23 BETWEEN OFFICE AND TPM ACCESS F8 002_2.1 REV.00 FDT & SURVEY ( AREA - F) F-8 IN BETWEEN 18-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
ROAD NO-01 OFFICE AND TPM ACCESS ROAD
NO-01
VISUAL INSPECTION FOR
MMAH-CE- ENGR. TURKI
CE-0090 Witness 16-Jan-23 12E-C01 ( AREA - F) F-8 F8 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 17-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
C01 ( AREA - F) F-8

FDT & SURVEY INSPECTION NGL


12E-C01 ( AREA - F) F-8 IN BETWEEN MMAH-CE- SUBGRADE AT 12E-C01 ( AREA ENGR. TURKI
CE-0091 CE-0076 16-Jan-23 F8 FDT & SURVEY 17-Jan-23 ABDUL HANNAN Accepted CIVIL
OFFICE AND TPM ACCESS ROAD NO-01 002_2.1 REV.00 - F) F-8 IN BETWEEN OFFICE AND AL MUTAIRI
TPM ACCESS ROAD NO-01

FDT & SURVEY INSPECTION 2ND


12E-C01 ( AREA - F) F-8 IN LAYER BACKFILLING AT 12E-C01
MMAH-CE- ENGR. TURKI
CE-0092 CE-0077 17-Jan-23 BETWEEN OFFICE AND TPM ACCESS F8 002_2.1 REV.00 FDT & SURVEY ( AREA - F) F-8 IN BETWEEN 18-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
ROAD NO-01 OFFICE AND TPM ACCESS ROAD
NO-01

FDT & SURVEY INSPECTION FOR


3RD BACKFILLING LAYER AT 12E-
( AREA - F) F-8 IN BETWEEN OFFICE MMAH-CE- ENGR. TURKI
CE-0093 CE-0078 18-Jan-23 F8 FDT & SURVEY C01 ( AREA - F) F-8 IN BETWEEN 19-Jan-23 ABDUL HANNAN Accepted CIVIL
AND TPM ACCESS ROAD NO-01 002_2.1 REV.00 AL MUTAIRI
OFFICE AND TPM ACCESS ROAD
NO-01

FDT & SURVEY INSPECTION FOR


FINAL LAYER BACKFILLING AT
( AREA - F) F-8 IN BETWEEN OFFICE MMAH-CE- ENGR. TURKI
CE-0094 CE-0079 18-Jan-23 F8 FDT & SURVEY 12E-C01 ( AREA - F) F-8 IN 19-Jan-23 ABDUL HANNAN Accepted CIVIL
AND TPM ACCESS ROAD NO-01 002_2.1 REV.00 AL MUTAIRI
BETWEEN OFFICE AND TPM
ACCESS ROAD NO-01

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0095 CE-0080 19-Jan-23 12E-C01 ( AREA - A-A) A-5 A5 002_2.1 REV.00 FDT & SURVEY NGL SUBGRADE AT 12E-C01 21-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( AREA - A-A) A-5

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0096 CE-0081 19-Jan-23 12E-C01 ( AREA - A-A) A-6 A6 002_2.1 REV.00 FDT & SURVEY NGL SUBGRADE AT 12E-C01 21-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( AREA - A-A) A-6

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0097 CE-0082 19-Jan-23 12E-C01 ( AREA - A-A) A-7 A7 002_2.1 REV.00 FDT & SURVEY NGL SUBGRADE AT 12E-C01 21-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( AREA - A-A) A-7

FDT & SURVEY INSPECTION FOR


FINAL DESIGN LEVEL AFTER CUTTING AT
ACCESS ROAD MMAH-CE- FINAL DESIGN LEVEL AFTER ENGR. TURKI
CE-0098 CE-0083 19-Jan-23 TMP ACCESS ROAD NO-02 STATIONS FDT & SURVEY 21-Jan-23 ABDUL HANNAN Accepted CIVIL
NO 02 002_2.1 REV.00 CUTTING AT TMP ACCESS ROAD AL MUTAIRI
0+300 TO 1+200
NO-02 STATIONS 0+300 TO 1+200

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0099 CE-0084 21-Jan-23 12E-C01 - AREA-B- 5 B5 002_2.1 REV.00 FDT & SURVEY NGL SUB GRADE AT 22-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
( 12E-C01 - AREA-B) B-5

SOIL MATERIAL SAMPLING FOR Accepted /


MMAH-CE- ENGR. TURKI
CE-100 CE-0085 22-Jan-23 12E-C01 (AREA-A) A-2 CUTTING AREA A2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 23-Jan-23 AL MUTAIRI ABDUL HANNAN wating for test CIVIL
(AREA-A) A-2 CUTTING AREA result

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0101 CE-0086 24-Jan-23 12E-C01 (AREA-F) F-9 F9 002_2.1 REV.00 FDT & SURVEY FINAL DESIGN GRADE LEVEL AFTER 25-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
CUTTING AT 12E-C01 (AREA-F) F-9

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-2 BACKFILLING MMAH-CE- 1st LAYER BACKFILLING LEVEL AT ENGR. TURKI
CE-0102 CE-0087 24-Jan-23 A2 FDT & SURVEY 25-Jan-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - A) A-2 AL MUTAIRI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0103 CE-0088 23-Jan-23 ( AREA - A) A-1 A1 002_2.1 REV.00 FDT & SURVEY 1st LAYER BACKFILLING LEVEL AT 24-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
12E C01 ( AREA - A) A-1

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0104 CE-0089 24-Jan-23 ( AREA - A) A-1 A1 002_2.1 REV.00 FDT & SURVEY 2nd LAYER BACKFILLING LEVEL 25-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
AT 12E C01 ( AREA - A) A-1

FDT & SURVEY INSPECTION FOR


MMAH-CE- 2nd LAYER BACKFILLING LEVEL ENGR. TURKI
CE-0105 CE-0090 25-Jan-23 ( AREA - A) A-1 A1 FDT & SURVEY 26-Jan-23 ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E C01 ( AREA - A) A-2 AL MUTAIRI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-2 BACKFILLING MMAH-CE- ENGR. TURKI
CE-0106 CE-0091 25-Jan-23 A1 FDT & SURVEY 3RD LAYER BACKFILLING LEVEL AT 26-Jan-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AL MUTAIRI
12E C01 ( AREA - A) A-1

FDT & SURVEY INSPECTION FOR


MMAH-CE- 3rd LAYER BACKFILLING LEVEL ENGR. TURKI
CE-0107 CE-0092 26-Jan-23 ( AREA - A) A-1 A2 FDT & SURVEY 28-Jan-23 ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E C01 ( AREA - A) A-2 AL MUTAIRI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-2 BACKFILLING MMAH-CE- ENGR. TURKI
CE-0108 CE-0093 26-Jan-23 A1 FDT & SURVEY 4th LAYER BACKFILLING LEVEL AT 28-Jan-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AL MUTAIRI
12E C01 ( AREA - A) A-1

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0109 CE-0094 26-Jan-23 12E C01 ( AREA - A) A-4 A4 002_2.1 REV.00 FDT & SURVEY 1st LAYER BACKFILLING LEVEL AT 28-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
12E C01 ( AREA - A) A-4

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0110 CE-0095 28-Jan-23 ( AREA - A) A-1 A1 002_2.1 REV.01 FDT & SURVEY 5th LAYER BACKFILLING LEVEL AT 29-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
12E C01 ( AREA - A) A-1

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-2 BACKFILLING MMAH-CE- 4th LAYER BACKFILLING LEVEL ENGR. TURKI
CE-0111 CE-0096 28-Jan-23 A2 FDT & SURVEY 29-Jan-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.02 AT 12E C01 ( AREA - A) A-2 AL MUTAIRI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0112 CE-0097 29-Jan-23 12E C01 ( AREA - A) A-4 A4 002_2.1 REV.03 FDT & SURVEY FINAL LAYER BACKFILLING LEVEL 30-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
AT 12E C01 ( AREA - A) A-4
SOIL SAMPLING COLLECTION FOR
12E-C01 ( AREA-A) A-1 5TH LAYER MMAH-CE- SOIL CLASSIFICATION FROM 12E- ENGR. TURKI
CE-0113 CE-0098 28-Jan-23 A1 SOIL CLASSIFICATION 29-Jan-23 ABDUL HANNAN Accepted CIVIL
BACKFILLING 002_2.1 REV.00 C01 ( AREA-A) A-1 5TH LAYER AL MUTAIRI
BACKFILLING

SOIL SAMPLING COLLECTION FOR


MMAH-CE- ENGR. TURKI
CE-0114 CE-0099 28-Jan-23 12E-C01 ( AREA-A) A-4 CUTTING AREA A4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION FROM 12E- 29-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
C01 ( AREA-A) A-4 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- ENGR. TURKI
CE-0115 CE-0100 29-Jan-23 12E C01 ( AREA - A) A-1 A1 002_2.1 REV.06 FDT & SURVEY 6th LAYER BACKFILLING LEVEL AT 30-Jan-23 AL MUTAIRI ABDUL HANNAN Accepted CIVIL
12E C01 ( AREA - A) A-1

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-2 BACKFILLING MMAH-CE- 5th LAYER BACKFILLING LEVEL ENGR. TURKI
CE-0116 CE-0101 29-Jan-23 A2 FDT & SURVEY 30-Jan-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-2 AL MUTAIRI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-2 BACKFILLING MMAH-CE- 7th LAYER BACKFILLING LEVEL
CE-0117 CE-0102 4-Feb-23 A2 FDT & SURVEY 5-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-1
BACKFILLING AREA

SOIL SAMPLING FOR SOIL


MMAH-CE-
CE-0118 CE-0103 4-Feb-23 (AREA-A) A-2 A2 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT (AREA-A) A-2 5-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
CUTTING AREA

SOIL SAMPLING FOR SOIL


MMAH-CE-
CE-0119 CE-0104 4-Feb-23 (AREA-A) A-4 A4 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT (AREA-A) A-4 5-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
CUTTING AREA

SOIL SAMPLING FOR SOIL


MMAH-CE-
CE-0120 CE-0105 4-Feb-23 (AREA-A) A-1 7THA LAYER BACKFILLING A1 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT (AREA-A) A-1 5-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
7THA LAYER BACKFILLING

FDT & SURVEY INSPECTION FOR


(AREA-A) A-2 6TH LAYER BACKFILLING MMAH-CE- 6th LAYER BACKFILLING LEVEL
CE-0121 CE-0106 6-Feb-23 A2 FDT & SURVEY 8-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-2
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


(AREA-A) A-1 8TH LAYER BACKFILLING MMAH-CE- 8th LAYER BACKFILLING LEVEL
CE-0122 CE-0107 7-Feb-23 A1 FDT & SURVEY 8-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-1
BACKFILLING AREA

SOIL SAMPLING FOR SOIL


MMAH-CE-
CE-0123 CE-0108 9-Feb-23 (AREA-A) A-4 CUTTING AREA A4 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT (AREA-A) A-4 11-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
CUTTING AREA

SOIL SAMPLING FOR SOIL


MMAH-CE-
CE-0124 CE-0109 9-Feb-23 (AREA-A) A-5 CUTTING AREA A5 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT (AREA-A) A-5 11-Feb-23 ENGR. EDEN CAYABYAB ABDUL HANNAN Accepted CIVIL
CUTTING AREA

FDT & SURVEY INSPECTION FOR


(AREA-A) A-1 9TH LAYER BACKFILLING MMAH-CE- 9th LAYER BACKFILLING LEVEL ENGR. EDEN CAYABYAB /
CE-0125 CE-0110 14-Feb-23 A1 FDT & SURVEY 15-Feb-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-1 TURKI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 7th LAYER BACKFILLING LEVEL ENGR. EDEN CAYABYAB /
CE-0126 CE-0111 15-Feb-23 ( AREA - A) A-2 BACKFILLING AREA A2 FDT & SURVEY 16-Feb-23 ABDUL HANNAN Accepted CIVIL
002_2.1 REV.07 AT 12E C01 ( AREA - A) A-2 TURKI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-1 BACKFILLING MMAH-CE- 10th LAYER BACKFILLING LEVEL ENGR. EDEN CAYABYAB /
CE-0127 CE-0112 15-Feb-23 A1 FDT & SURVEY 16-Feb-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-1 TURKI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-5 BACKFILLING MMAH-CE- 1ST LAYER BACKFILLING LEVEL ENGR. EDEN CAYABYAB /
CE-0128 CE-0113 15-Feb-23 A5 FDT & SURVEY 16-Feb-23 ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-5 TURKI
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 8th LAYER BACKFILLING LEVEL
CE-0129 CE-0114 18-Feb-23 ( AREA - A) A-2 BACKFILLING AREA A2 FDT & SURVEY 19-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.07 AT 12E C01 ( AREA - A) A-2
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-1 BACKFILLING MMAH-CE- 11th LAYER BACKFILLING LEVEL
CE-0130 CE-0115 18-Feb-23 A1 FDT & SURVEY 19-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-1
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-5 BACKFILLING MMAH-CE- 2ND LAYER BACKFILLING LEVEL
CE-0131 CE-0116 18-Feb-23 A5 FDT & SURVEY 19-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-5
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-7 BACKFILLING MMAH-CE- 1ST LAYER BACKFILLING LEVEL
CE-0132 CE-0117 18-Feb-23 A7 FDT & SURVEY 19-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-7
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- (FINAL LAYER ) BACKFILLING
CE-0133 CE-0118 19-Feb-23 ( AREA - A) A-2 BACKFILLING AREA A2 FDT & SURVEY 20-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.07 LEVEL AT 12E C01 ( AREA - A) A-2
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-1 BACKFILLING MMAH-CE- 12th LAYER BACKFILLING LEVEL
CE-0134 CE-0119 19-Feb-23 A1 FDT & SURVEY 20-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-1
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-5 BACKFILLING MMAH-CE- (FINAL LAYER ) LAYER
CE-0135 CE-0120 19-Feb-23 A7 FDT & SURVEY 20-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 BACKFILLING LEVEL AT 12E C01
( AREA - A) A-5 BACKFILLING AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - A) A-7 BACKFILLING MMAH-CE- 2nd LAYER BACKFILLING LEVEL
CE-0136 CE-0121 19-Feb-23 A7 FDT & SURVEY 20-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.07 AT 12E C01 ( AREA - A) A-7
BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


SOIL CLASSIFICATION (FINAL
9th LAYER BACKFILLING LEVEL AT 12E MMAH-CE-
CE-0137 CE-0122 19-Feb-23 A2 SOIL CLASSIFICATION LAYER ) LAYER BACKFILLING 20-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01 ( AREA - A) A-2 BACKFILLING AREA 002_2.1 REV.00
LEVEL AT 12E C01 ( AREA - A) A-2
BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


12th LAYER BACKFILLING LEVEL AT SOIL CLASSIFICATION FROM 1ST
MMAH-CE-
CE-0138 CE-0123 20-Feb-23 12E C01 ( AREA - A) A-1 BACKFILLING A1 002_2.1 REV.00
SOIL CLASSIFICATION LAYER BACKFILLING LEVEL AT 12E 21-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA C01 ( AREA - F) F-10 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


SOIL CLASSIFICATION FROM
3rd LAYER BACKFILLING LEVEL AT 12E MMAH-CE-
CE-0139 CE-0124 19-Feb-23 A5 SOIL CLASSIFICATION (FINAL LAYER ) LAYER 20-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01 ( AREA - A) A-5 BACKFILLING AREA 002_2.1 REV.00
BACKFILLING LEVEL AT 12E C01
( AREA - A) A-5 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


SOIL CLASSIFICATION FROM FINAL
2nd LAYER BACKFILLING LEVEL AT 12E MMAH-CE-
CE-0140 CE-0125 20-Feb-23 A7 SOIL CLASSIFICATION LAYER BACKFILLING LEVEL AT 12E 21-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01 ( AREA - A) A-7 BACKFILLING AREA 002_2.1 REV.00
C01 ( AREA - A) A-7 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 1ST LAYER BACKFILLING LEVEL
CE-0141 CE-0126 25-Feb-23 ( AREA - F) F-10 BACKFILLING AREA F 10 FDT & SURVEY 26-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E C01 ( AREA - F) F-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


1ST LAYER CONTINUATION
AREA-A1 CONTINUATION WITH
MMAH-CE- CONTINUATION WITH
CE-0142 CE-0127 25-Feb-23 COORDINATE OF (E-301697.518, N- A1 FDT & SURVEY 26-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 COORDINATE OF (E-301697.518,
3039058.024)
N-3039058.024) BACKFILLING AT
12E -C01 ( AREA-A) A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 2ND LAYER CONTINUATION WITH
MMAH-CE-
CE-0143 CE-0128 25-Feb-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 26-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) N-3039058.024) BACKFILLING AT
12E -C01 ( AREA-A) A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 3RD LAYER CONTINUATION WITH
MMAH-CE-
CE-0144 CE-0129 25-Feb-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 26-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) N-3039058.024) BACKFILLING AT
12E -C01 ( AREA-A) A1

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-10 BACKFILLING MMAH-CE- 2ND LAYER BACKFILLING LEVEL
CE-0145 CE-0130 27-Feb-23 F 10 FDT & SURVEY 28-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - F) F-10
BACKFILLING AREA

VISUAL INSPECTION FOR


AT 12E-C01 ( AREA - F) F- MMAH-CE-
CE-0146 Witness 27-Feb-23 F 11 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 28-Feb-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
11
C01 ( AREA - F) F-11

MATERIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0147 CE-0131 27-Feb-23 AREA-F10 2ND LAYER BACKFILLING F 10 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT AREA-F10 2ND 28-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
LAYER BACKFILLING

MATERIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0148 CE-0132 27-Feb-23 AREA-A4 CUTTING AREA A4 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT AREA-A4 28-Feb-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
CUTTING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0149 Witness 28-Feb-23 12E-C01 ( AREA - F) F-6 F6 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 1-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - F) F-6

VISUAL INSPECTION FOR


MMAH-CE-
CE-0150 Witness 28-Feb-23 12E-C01 ( AREA - F) F-7 F7 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 1-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - F) F-7

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-10 BACKFILLING MMAH-CE- 3RD LAYER BACKFILLING LEVEL
CE-0151 CE-0133 28-Feb-23 F 10 FDT & SURVEY 1-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - F) F-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


AREA - A A-3 COORDINATES OF (E- 1ST LAYER COORDINATES OF (E-
MMAH-CE-
CE-0152 CE-0134 28-Feb-23 301755.451, N-3038935.237) A3 002_2.1 REV.00 FDT & SURVEY 301755.451, N-3038935.237) 1-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA BACKFILLING AT 12E C01 ( AREA -
A) A-3 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


AREA - A A-3 COORDINATES OF (E- 2ND LAYER COORDINATES OF (E-
MMAH-CE-
CE-0153 CE-0135 28-Feb-23 301755.451, N-3038935.237) A3 002_2.1 REV.00 FDT & SURVEY 301755.451, N-3038935.237) 1-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA BACKFILLING AT 12E C01 ( AREA -
A) A-3 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


AREA - A A-3 COORDINATES OF (E- 3RD LAYER COORDINATES OF (E-
MMAH-CE-
CE-0154 CE-0136 28-Feb-23 301755.451, N-3038935.237) A3 002_2.1 REV.00 FDT & SURVEY 301755.451, N-3038935.237) 1-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA BACKFILLING AT 12E C01 ( AREA -
A) A-3 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


NGL LEVEL SUBGRADE LAYER
12E C01 ( AREA - F) F-11 BACKFILLING MMAH-CE-
CE-0155 CE-0137 1-Mar-23 F 11 FDT & SURVEY BACKFILLING LEVEL AT 12E C01 4-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00
( AREA - F) F-11 BACKFILLING
AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0156 Witness 4-Mar-23 F1 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 5-Mar-23 ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - F) F-1 ENGR. TURKI
C01 ( AREA - F) F-1

VISUAL INSPECTION FOR


MMAH-CE-
CE-0157 Witness 4-Mar-23 F2 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 5-Mar-23 ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - F) F-2 ENGR. TURKI
C01 ( AREA - F) F-2

VISUAL INSPECTION FOR


MMAH-CE-
CE-0158 Witness 4-Mar-23 F3 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 5-Mar-23 ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - F) F-3 ENGR. TURKI
C01 ( AREA - F) F-3
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - F) F-5 BACKFILLING MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0159 CE-0138 4-Mar-23 F5 FDT & SURVEY 5-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - F) F-5 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-6 BACKFILLING MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0160 CE-0139 4-Mar-23 F6 FDT & SURVEY 5-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - F) F-6 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-7 BACKFILLING MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0161 CE-0140 4-Mar-23 F7 FDT & SURVEY 5-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - F) F-7 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0162 CE-0141 4-Mar-23 12E-C01 (AREA-B) B3 B3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 5-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
(AREA-B) B3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0163 CE-0142 4-Mar-23 12E-C01 (AREA-B) B4 B4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 5-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
(AREA-B) B4 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0164 CE-0143 4-Mar-23 12E-C01 (AREA-B) B5 B5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 5-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
(AREA-B) B5 CUTTING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-1 BACKFILLING MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0165 CE-0144 5-Mar-23 F1 FDT & SURVEY 6-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - F) F-1 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-2 BACKFILLING MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0166 CE-0145 5-Mar-23 F2 FDT & SURVEY 6-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - F) F-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-3 BACKFILLING MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0167 CE-0146 5-Mar-23 F3 FDT & SURVEY 6-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - F) F-3 BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0168 Witness 5-Mar-23 12E-C01 ( AREA - F) F-8 F8 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 6-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - F) F-8

FDT & SURVEY INSPECTION FOR


MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0169 CE-0147 7-Mar-23 12E-C01 ( AREA - F) F-8 F8 FDT & SURVEY 9-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - F) F-8 BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0170 Witness 8-Mar-23 12E-C01 ( AREA - C) C-5 C5 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 9-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - C) C-5

VISUAL INSPECTION FOR


MMAH-CE-
CE-0171 Witness 8-Mar-23 12E-C01 ( AREA - C) C-1 C1 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 9-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - C) C-1

VISUAL INSPECTION FOR


MMAH-CE-
CE-0172 Witness 9-Mar-23 12E-C01 ( AREA - C) C-2 C2 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 11-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - C) C-2

FDT & SURVEY INSPECTION FOR


MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0173 CE-0148 9-Mar-23 12E C01 ( AREA - C) C-5 C5 FDT & SURVEY 11-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - C) C-5 BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0174 Witness 9-Mar-23 12E C01 ( AREA - C) C-1 C4 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 11-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - C) C-4

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - C) C-1 BACKFILLING MMAH-CE- NGL LEVEL SUBGRADE LAYER
CE-0175 CE-0149 11-Mar-23 C1 FDT & SURVEY 12-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 BACKFILLING LEVEL AT 12E C01
( AREA - C) C-1 BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0176 Witness 11-Mar-23 12E-C01 ( AREA - C) C-3 C3 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 12-Mar-23 ABDUL HANNAN Accepted CIVIL
ENGR. TURKI
C01 ( AREA - C) C-3

MATERIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0177 CE-0150 11-Mar-23 12E-C01 ( AREA-C ) C-1 C1 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT NGL 12E-C01 12-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
( AREA-C ) C-1

MATERIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0178 CE-0151 11-Mar-23 12E-C01 ( AREA-C ) C-5 C5 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT NGL 12E-C01 12-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
( AREA-C ) C-5

MATERIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0179 CE-0152 11-Mar-23 ( AREA-B) B-5 CUTTING AREA B5 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT 12E-C01 12-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
( AREA-B) B-5 CUTTING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - C) C-2 BACKFILLING MMAH-CE-
CE-0180 CE-0153 12-Mar-23 C2 FDT & SURVEY NGL LEVEL AT 12E C01 ( AREA - C) 13-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00
C-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-5 IN BETWEEN 1ST LAYER BACKFILLING LEVEL AT
MMAH-CE-
CE-0181 CE-0154 12-Mar-23 AREA-F10 & TMP ROAD NO-2 F5 002_2.1 REV.00 FDT & SURVEY 12E C01 ( AREA - F) F-5 IN 13-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA BETWEEN AREA-F10 & TMP ROAD
NO-2 BACKFILLING AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - F) F-5 IN BETWEEN 2ND LAYER BACKFILLING LEVEL
MMAH-CE-
CE-0182 CE-0155 12-Mar-23 AREA-F10 & TMP ROAD NO-2 F5 002_2.1 REV.00 FDT & SURVEY AT 12E C01 ( AREA - F) F-5 IN 13-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA BETWEEN AREA-F10 & TMP ROAD
NO-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-5 IN BETWEEN 3RD LAYER BACKFILLING LEVEL
MMAH-CE-
CE-0183 CE-0156 12-Mar-23 AREA-F10 & TMP ROAD NO-2 F5 002_2.1 REV.00 FDT & SURVEY AT 12E C01 ( AREA - F) F-5 IN 13-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA BETWEEN AREA-F10 & TMP ROAD
NO-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-10 BACKFILLING MMAH-CE- 4th LAYER BACKFILLING LEVEL AT
CE-0184 CE-0157 12-Mar-23 F 10 FDT & SURVEY 13-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - F) F-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-10 BACKFILLING MMAH-CE- FINAL LAYER BACKFILLING LEVEL
CE-0185 CE-0158 12-Mar-23 F 10 FDT & SURVEY 14-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - F) F-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


4TH LAYER BACKFILLING LEVEL
12E C01 ( AREA - F) F-5 BACKFILLING MMAH-CE-
CE-0186 CE-0159 13-Mar-23 F5 FDT & SURVEY AT 12E C01 ( AREA - F) F-5 IN 14-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00
BETWEEN AREA-F10 & TMP ROAD
NO-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


5TH LAYER BACKFILLING LEVEL
12E C01 ( AREA - F) F-5 BACKFILLING MMAH-CE-
CE-0187 CE-0160 15-Mar-23 F5 FDT & SURVEY AT 12E C01 ( AREA - F) F-5 IN 16-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00
BETWEEN AREA-F10 & TMP ROAD
NO-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


6TH LAYER BACKFILLING LEVEL
MMAH-CE-
CE-0188 CE-0161 16-Mar-23 12E C01 ( AREA - F) F-5 F5 002_2.1 REV.00 FDT & SURVEY AT 12E C01 ( AREA - F) F-5 IN 18-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
BETWEEN AREA-F10 & TMP ROAD
NO-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE-
CE-0189 CE-0162 16-Mar-23 12E C01 ( AREA - B) B-5 B5 002_2.1 REV.00
SOIL CLASSIFICATION 1ST LAYER BACKFILLING LEVEL 18-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AT 12E C01 ( AREA - B) B-5

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0190 CE-0163 16-Mar-23 12E-C01(AREA-B) B5 F5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E- 18-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B) B5 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0191 CE-0164 16-Mar-23 12E-C01(AREA-B) B4 B4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E- 18-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B) B4 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0192 CE-0165 16-Mar-23 12E-C01(AREA-B) B3 B3 002_2.1 REV.00 FDT & SURVEY SOIL CLASSIFICATION AT 12E- 18-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B) B3 CUTTING AREA

FDT & SURVEY INSPECTION FOR


BEFORE FINAL LAYER BACKFILLING
MMAH-CE- PRIOR TO FINAL GRADE DESIGN
CE-0193 CE-0166 18-Mar-23 12E C01 ( AREA - F) F-5 F5 FDT & SURVEY 19-Mar-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 LEVEL AT 12E C01 ( AREA - F) F-5
IN BETWEEN AREA-F10 & TMP
ROAD NO-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE-
CE-0194 CE-0167 18-Mar-23 12E C01 ( AREA - B) B-5 B5 002_2.1 REV.00 FDT & SURVEY 2ND LAYER BACKFILLING LEVEL 19-Mar-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
AT 12E C01 ( AREA - B) B-5

FDT & SURVEY INSPECTION FOR


MMAH-CE- BEFORE FINAL LAYER BACKFILLING
CE-0195 CE-0168 20-Mar-23 12E C01 ( AREA - B) B-5 B5 FDT & SURVEY 21-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 PRIOR TO FINAL GRADE DESIGN
LEVEL AT 12E C01 ( AREA - B) B-5

MATRTIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0196 CE-0169 22-Mar-23 12E-C01 (AREA -F)-F6 CUTTING AREA F6 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT 12E-C01 (AREA 23-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
-F)-F6 CUTTING AREA

MATRTIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0197 CE-0170 22-Mar-23 12E-C01 (AREA -F)-F6 CUTTING AREA F6 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT 12E-C01 (AREA 23-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
-F)-F6 CUTTING AREA

MATRTIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0198 CE-0171 23-Mar-23 12E-C01 (AREA -A)-A6 CUTTING AREA A6 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT 12E-C01 (AREA 25-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
-A)-A6 CUTTING AREA

MATRTIAL SAMPLING FOR SOIL


MMAH-CE-
CE-0199 CE-0172 23-Mar-23 12E-C01 (AREA -B)-B4 CUTTING AREA B4 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT 12E-C01 (AREA 25-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
-B)-B4 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE-
CE-0200 CE-0173 25-Mar-23 12E C01 ( AREA -A) A-1 A1 002_2.1 REV.00 FDT & SURVEY FINAL GRADE LEVEL BACKFILLING 26-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AT 12E C01 ( AREA -A) A-1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 4TH LAYER CONTINUATION WITH
MMAH-CE-
CE-0201 CE-0174 26-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 27-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) N-3039058.024) BACKFILLING AT (
AREA-A) A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 5TH LAYER CONTINUATION WITH
MMAH-CE-
CE-0202 CE-0175 26-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 27-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) N-3039058.024) BACKFILLING AT
(AREA-A) A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 6TH LAYER CONTINUATION WITH
MMAH-CE-
CE-0203 CE-0176 26-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 27-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) N-3039058.024) BACKFILLING AT
( AREA-A) A1

FDT & SURVEY INSPECTION FOR


MMAH-CE- FINAL GRADE LEVEL AFTER
CE-0204 CE-0177 26-Mar-23 12E C01 ( AREA -A) A-2 A2 FDT & SURVEY 1-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 CUTTING (FGL) AREA AT 12E C01
( AREA -A) A-2
FDT & SURVEY INSPECTION FOR
AREA-A1 CONTINUATION WITH 7TH LAYER CONTINUATION WITH
MMAH-CE-
CE-0205 CE-0178 27-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 28-Mar-23 ENGR. TURKI ABDUL HANNAN not sign CIVIL
3039058.024) N-3039058.024) BACKFILLING AT (
AREA-A)A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 8TH LAYER CONTINUATION WITH
MMAH-CE-
CE-0206 CE-0179 27-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 28-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) N-3039058.024) BACKFILLING AT (
AREA-A)A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 9TH LAYER CONTINUATION WITH
MMAH-CE-
CE-0207 CE-0180 27-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 28-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) N-3039058.024) BACKFILLING AT (
AREA-A)A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 10TH LAYER CONTINUATION
MMAH-CE-
CE-0208 CE-0181 28-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY WITH COORDINATE OF (E- 29-Mar-23 ENGR. TURKI ABDUL HANNAN not sign CIVIL
3039058.024) 301697.518, N-3039058.024)
BACKFILLING AT ( AREA-A)A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 11TH LAYER CONTINUATION
MMAH-CE-
CE-0209 CE-0182 28-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY WITH COORDINATE OF (E- 29-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) 301697.518, N-3039058.024)
BACKFILLING AT ( AREA-A)A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 12TH LAYER CONTINUATION
MMAH-CE-
CE-0210 CE-0183 28-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY WITH COORDINATE OF (E- 29-Mar-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
3039058.024) 301697.518, N-3039058.024)
BACKFILLING AT ( AREA-A)A1

FDT & SURVEY INSPECTION FOR


AREA-A1 CONTINUATION WITH 13TH LAYER CONTINUATION WITH
MMAH-CE-
CE-0211 CE-0184 29-Mar-23 COORDINATE OF (E-301697.518, N- A1 002_2.1 REV.00 FDT & SURVEY COORDINATE OF (E-301697.518, 30-Mar-23 ENGR. TURKI ABDUL HANNAN Rejected CIVIL
3039058.024) N-3039058.024) BACKFILLING AT (
AREA-A)A1 AREA-A1

FDT & SURVEY INSPECTION FOR


13TH LAYER CONTINUATION
AREA-A1 CONTINUATION WITH
MMAH-CE- WITH COORDINATE OF (E-
CE-0211A CE-0189 8-Apr-23 COORDINATE OF (E-301697.518, N- A1 FDT & SURVEY 9-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 301697.518, N-3039058.024)
3039058.024)
BACKFILLING AT ( AREA-A)A1
AREA-A1

FDT & SURVEY INSPECTION FOR


FINAL GRADE LEVEL (FGL)
MMAH-CE- BACKFILLING AT 12E C01 ( AREA -
CE-0212 CE-0185 1-Apr-23 12E C01 ( AREA - F) F-5 F5 FDT & SURVEY 2-Apr-23 ENGR. TURKI ABDUL HANNAN REJECTED CIVIL
002_2.1 REV.00 F) F-5 IN BETWEEN AREA-F10 &
TMP ROAD NO-2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


FINAL GRADE LEVEL (FGL)
MMAH-CE- BACKFILLING AT 12E C01 ( AREA -
CE-0212A CE-0186 3-Apr-23 ( AREA - F) F-5 F5 FDT & SURVEY 4-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 F) F-5 IN BETWEEN AREA-F10 &
TMP ROAD NO-2 BACKFILLING
AREA

SOIL SAMPLING FOR SOIL


MMAH-CE-
CE-0213 CE-0187 3-Apr-23 12E-C01(AREA-B)-B3 B3 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT 12E- 4-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B)-B3 CUTTING AREA

SOIL SAMPLING FOR SOIL


MMAH-CE-
CE-0214 CE-0188 3-Apr-23 12E-C01(AREA-B)-B4 B4 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION AT 12E- 4-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B)-B4 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0215 CE-0190 8-Apr-23 AREA-B-B3 CUTTING AREA B4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 9-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA-B-B3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0216 CE-0191 8-Apr-23 12E-C01 AREA-B-B4 CUTTING AREA B4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 9-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA-B-B4 CUTTING AREA

FDT & SURVEY INSPECTION AFTER


MMAH-CE- CUTTING TO REDUCE LEVEL FOR
CE-0217 CE-0192 11-Apr-23 12E C01 ( AREA - A) A-5 CUTTING AREA A5 FDT & SURVEY 12-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 FINAL GRADE LEVEL (FGL) AT 12E
C01 ( AREA - A) A-5 CUTTING AREA

FDT & SURVEY INSPECTION FOR


14TH LAYER CONTINUATION
12E-C01 ( AREA-A)A1 BACKFILLING MMAH-CE- WITH COORDINATE OF (E-
CE-0218 CE-0193 11-Apr-23 A1 FDT & SURVEY 12-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 301697.518, N-3039058.024)
BACKFILLING AT12E-C01 ( AREA-
A)A1

FDT & SURVEY INSPECTION FOR


15TH LAYER CONTINUATION
12E-C01 ( AREA-A)A1 BACKFILLING MMAH-CE- WITH COORDINATE OF (E-
CE-0219 CE-0194 12-Apr-23 A1 FDT & SURVEY 13-Apr-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 301697.518, N-3039058.024)
BACKFILLING AT12E-C01 ( AREA-
A)A1

FDT & SURVEY INSPECTION FOR


FINAL GRADE LEVEL ( FGL) AFTER
MMAH-CE-
CE-0220 CE-0195 17-Apr-23 12E-C01 (AREA-A ) A6 CUTTING AREA A6 002_2.1 REV.00 FDT & SURVEY CUTTING TO REDUCED LEVEL AT 18-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
12E-C01 (AREA-A ) A6 CUTTING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0221 CE-0196 17-Apr-23 12E-C01 ( AREA -C) C2 CUTTING AREA C2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 18-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
( AREA -C) C2 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0222 CE-0197 17-Apr-23 12E-C01 ( AREA -C) C3 CUTTING AREA C3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 18-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
( AREA -C) C3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0223 CE-0198 17-Apr-23 12E-C01 ( AREA -B) B3 CUTTING AREA B3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 18-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
( AREA -B) B3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0224 CE-0199 17-Apr-23 12E-C01 ( AREA -B) B4 CUTTING AREA B4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 18-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
( AREA -B) B4 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- SOIL CLASSIFICATION AT 12E-C01
CE-0225 CE-0200 17-Apr-23 12E-C01 AREA-A6 FGL A6 SOIL CLASSIFICATION 18-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 ( AREA -A) A6 FROM THE FGL
LAYER
FDT & SURVEY INSPECTION FOR
FINAL GRADE LEVEL ( FGL) AFTER
MMAH-CE-
CE-0226 CE-0201 26-Apr-23 12E-C01 (AREA-A ) A7 CUTTING AREA A7 002_2.1 REV.00 FDT & SURVEY CUTTING TO REDUCED LEVEL AT 27-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
12E-C01 (AREA-A ) A7 CUTTING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0227 CE-0202 26-Apr-23 12E-C01 ( AREA -B) B4 CUTTING AREA B4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 27-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
( AREA -B) B4 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0228 CE-0203 26-Apr-23 C3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 27-Apr-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
( AREA -C) C3 CUTTING AREA

12E-C01 ( AREA -C) C3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0229 CE-0204 30-Apr-23 C5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 1-May-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C5 CUTTING AREA

12E-C01 ( AREA -C) C5 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0230 CE-0205 30-Apr-23 C2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 1-May-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C2 CUTTING AREA

12E-C01 ( AREA -C) C2 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0231 CE-0206 30-Apr-23 D1 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 1-May-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D1 NGL

12E-C01 ( AREA -D) D1 NGL

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0232 Witness 30-Apr-23 12E-C01 (AREA-D) D1 D1 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 1-May-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D1

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0233 Witness 30-Apr-23 12E-C01 (AREA-D) D2 D2 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 1-May-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D2

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0234 Witness 30-Apr-23 12E-C01 (AREA-D) D3 D3 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 1-May-23 ENGR. TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D3

FDT & SURVEY INSPECTION FOR


MMAH-CE- NGL-SUBGARDE PRIOR TO
CE-0235 CE-0207 1-May-23 12E-C01(AREA-D) D1 BACKFILLING AREA D1 FDT & SURVEY 2-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 BACKFILLING AT 12E-C01(AREA-D)
D1 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- NGL-SUBGARDE PRIOR TO
CE-0236 CE-0208 1-May-23 12E-C01(AREA-D) D2 BACKFILLING AREA D2 FDT & SURVEY 2-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 BACKFILLING AT 12E-C01(AREA-D)
D2 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0237 CE-0209 1-May-23 12E-C01 ( AREA -D) D2 NGL D2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 2-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D2 NGL

FDT & SURVEY INSPECTION FOR


MMAH-CE- NGL-SUBGARDE PRIOR TO
CE-0238 CE-0210 2-May-23 12E-C01(AREA-D) D3 BACKFILLING AREA D3 FDT & SURVEY 3-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 BACKFILLING AT 12E-C01(AREA-D)
D3 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0239 CE-0211 2-May-23 12E-C01 ( AREA -D) D3 NGL D3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 3-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D3 NGL

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0240 Witness 2-May-23 12E-C01 (AREA-D) D4 D4 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 3-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D4

VISUAL INSPECTION FOR


DEMOLITION AND DISPOSAL OF
DEMOLITION AND DISPOSAL OF CAMEL MMAH-CE-
CE-0241 CE-0212 2-May-23 OF 002_1.4 REV.00 VISUAL INSPECTION CAMEL CAMP PRIOR TO CLEARING 3-May-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
CAMP
& GURBBING NEAR 12E-C01
OFFICE & LAYDOWN AREA

VISUAL INSPECTION FOR


CLEARING & GURBBING OF
DEMOLITION AND DISPOSAL OF CAMEL MMAH-CE-
CE-0242 Witness 2-May-23 CAMEL CAMP 002_1.4 VISUAL INSPECTION DEMOLITION AND DISPOSAL OF 3-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
CAMP REV.00
CAMEL CAMP NEAR 12E-C01
OFFICE & LAYDOWN AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 1ST LAYER BACKFILLING AT 12E-
CE-0243 CE-0218 3-May-23 12E-C01(AREA-B) B2 BACKFILLING AREA CAMEL CAMP 002_2.1 FDT & SURVEY 4-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
REV.00 C01(AREA-B) B2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 2ND LAYER BACKFILLING AT 12E-
CE-0244 CE-0213 4-May-23 12E-C01(AREA-B) B2 BACKFILLING AREA B2 FDT & SURVEY 7-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B2 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0245 CE-0214 4-May-23 12E-C01 ( AREA -D) D1 CUTTING AREA D1 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 7-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D1 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0246 CE-0215 4-May-23 12E-C01 ( AREA -D) D2 CUTTING AREA D2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 7-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D2 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0247 CE-0216 4-May-23 12E-C01 ( AREA -C) C5 CUTTING AREA C5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 7-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C5 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 1ST LAYER BACKFILLING AT 12E-
CE-0248 CE-0217 6-May-23 12E-C01(AREA-B) B1 BACKFILLING AREA B1 FDT & SURVEY 7-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B1 BACKFILLING
AREA
MATERIAL SOIL SAMPLING FOR
MMAH-CE-
CE-0249 CE-0219 7-May-23 12E-C01 ( AREA -D) D1 CUTTING AREA D1 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 8-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D1 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0250 CE-0220 7-May-23 12E-C01 ( AREA -D) D2 CUTTING AREA D2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 8-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D2 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0251 CE-0221 7-May-23 12E-C01 ( AREA -C) C5 CUTTING AREA C5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 8-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C5 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 3RD LAYER BACKFILLING AT 12E-
CE-0252 CE-0222 7-May-23 12E-C01(AREA-B) B2 BACKFILLING AREA B2 FDT & SURVEY 8-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B2 BACKFILLING
AREA

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0253 Witness 7-May-23 12E-C01 (AREA-D) D5 D5 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 8-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D5

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0254 Witness 7-May-23 12E-C01 (AREA-D) D6 D6 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 8-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D6

FDT & SURVEY INSPECTION FOR


MMAH-CE- 4TH LAYER BACKFILLING AT 12E-
CE-0255 CE-0223 8-May-23 12E-C01(AREA-B) B2 BACKFILLING AREA B2 FDT & SURVEY 9-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 2ND LAYER BACKFILLING AT 12E-
CE-0256 CE-0224 8-May-23 12E-C01(AREA-B) B1 BACKFILLING AREA B1 FDT & SURVEY 9-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B1 BACKFILLING
AREA

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0257 Witness 8-May-23 12E-C01 (AREA-D) D7 D7 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 9-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D7

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0258 CE-0225 8-May-23 12E-C01 ( AREA -C) C4 CUTTING AREA C4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 9-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C4 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0259 CE-0226 8-May-23 12E-C01 ( AREA -D) D1 CUTTING AREA D1 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 9-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D1 CUTTING AREA

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0260 Witness 9-May-23 12E-C01 (AREA-D) D8 D8 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 10-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D8

FDT & SURVEY INSPECTION FOR


MMAH-CE- 5TH LAYER BACKFILLING AT 12E-
CE-0261 CE-0227 10-May-23 12E-C01 (AREA-B) B2 B2 FDT & SURVEY 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 3rd LAYER BACKFILLING AT 12E-
CE-0262 CE-0228 10-May-23 12E-C01(AREA-B) B1 BACKFILLING AREA B1 FDT & SURVEY 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B1 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0263 CE-0229 10-May-23 12E-C01 ( AREA -C) C4 CUTTING AREA C4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C4 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0264 CE-0230 10-May-23 12E-C01 ( AREA -D) D1 CUTTING AREA D1 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D1 CUTTING AREA

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0265 Witness 10-May-23 12E-C01 (AREA-D) D9 D9 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D9

VISUAL INSPECTION FOR CLEARN


MMAH-CE- & GRUBBING PRIOR TO CUTTING
CE-0266 Witness 10-May-23 12E-C01 (AREA-D) D10 D 10 002_1.4 REV.00 VISUAL INSPECTION AND BACKFILLING AT 12E-C01 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-D) D10

FDT & SURVEY INSPECTION FOR


MMAH-CE- 1ST LAYER BACKFILLING AT 12E-
CE-0267 CE-0231 10-May-23 12E-C01(AREA-C) C2 BACKFILLING AREA C2 FDT & SURVEY 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0268 CE-0232 10-May-23 12E-C01 ( AREA -D) D2 CUTTING AREA D2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 11-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D2 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 6TH LAYER BACKFILLING AT 12E-
CE-0269 CE-0233 13-May-23 12E-C01(AREA-B) B2 BACKFILLING AREA B 2 FDT & SURVEY 15-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 4TH LAYER BACKFILLING AT 12E-
CE-0270 CE-0234 13-May-23 12E-C01(AREA-B) B1 BACKFILLING AREA B1 FDT & SURVEY 15-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-B) B1 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0271 CE-0235 13-May-23 12E-C01 ( AREA -C) C4 CUTTING AREA C4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 15-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C4 CUTTING AREA
MATERIAL SOIL SAMPLING FOR
MMAH-CE-
CE-0272 CE-0236 13-May-23 12E-C01 ( AREA -D) D1 CUTTING AREA D1 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 15-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D1 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 2ND LAYER BACKFILLING AT 12E-
CE-0273 CE-0237 13-May-23 12E-C01(AREA-C) C2 C2 FDT & SURVEY 15-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0274 CE-0238 13-May-23 12E-C01 ( AREA -D) D2 CUTTING AREA C2 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 15-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D2 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE-
CE-0275 CE-0239 14-May-23 2E-C01(AREA-B) B5 B5 002_2.1 REV.00 FDT & SURVEY FINAL GRADE LEVEL (FGL) AT 12E- 15-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B) B5

FDT & SURVEY INSPECTION FOR


MMAH-CE- 3RD LAYER BACKFILLING AT 12E-
CE-0276 CE-0240 15-May-23 12E-C01(AREA-C) C2 C2 FDT & SURVEY 16-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0277 CE-0241 16-May-23 12E-C01 ( AREA -D) D3 CUTTING AREA D3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 17-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0278 CE-0242 16-May-23 12E-C01 ( AREA -D) D5 CUTTING AREA D5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 17-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D5 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0279 CE-0243 16-May-23 12E-C01 ( AREA -D) D6 CUTTING AREA D6 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 17-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D6 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 4th LAYER BACKFILLING AT 12E-
CE-0280 CE-0244 17-May-23 12E-C01(AREA-C) C2 BACKFILLING AREA C2 FDT & SURVEY 18-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


FINAL GRADE LEVEL (FGL) AFTER
12E-C01(AREA-B) B4 BCUTTING AREA MMAH-CE-
CE-0281 CE-0245 17-May-23 B4 FDT & SURVEY CUTTING TO REDUCE LEVEL AT 18-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00
12E-C01(AREA-B) B4 BCUTTING
AREA AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0282 CE-0246 17-May-23 12E-C01 ( AREA -D) D3 CUTTING AREA D3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 18-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0283 CE-0247 17-May-23 12E-C01 ( AREA -C) C4 CUTTING AREA C4 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 18-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -C) C4 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 5th LAYER BACKFILLING AT 12E-
CE-0284 CE-0248 20-May-23 12E-C01(AREA-C) C2 BACKFILLING AREA C2 FDT & SURVEY 22-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0285 CE-0249 20-May-23 12E-C01 ( AREA -D) D3 CUTTING AREA D3 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 22-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D3 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0286 CE-0250 20-May-23 12E-C01 ( AREA -D) D6 CUTTING AREA D6 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 22-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D6 CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE-
CE-0287 CE-0251 20-May-23 12E-C01 ( AREA -D) D5 CUTTING AREA D5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 22-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA -D) D5 CUTTING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 6th LAYER BACKFILLING AT 12E-
CE-0288 CE-0252 22-May-23 12E-C01(AREA-C) C2 BACKFILLING AREA C2 FDT & SURVEY 23-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


FINAL GRADE LEVEL (FGL) AFTER
12E-C01(AREA-B) B3 BCUTTING AREA MMAH-CE-
CE-0289 CE-0253 23-May-23 B3 FDT & SURVEY CUTTING TO REDUCE LEVEL AT 24-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00
12E-C01(AREA-B) B3 BCUTTING
AREA AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 7th LAYER BACKFILLING AT 12E-
CE-0290 CE-0254 23-May-23 12E-C01(AREA-C) C2 BACKFILLING AREA C2 FDT & SURVEY 24-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 8th LAYER BACKFILLING AT 12E-
CE-0291 CE-0255 24-May-23 12E-C01(AREA-C) C2 BACKFILLING AREA C2 FDT & SURVEY 25-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C2 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 1ST LAYER BACKFILLING AT 12E-
CE-0292 CE-0256 24-May-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 FDT & SURVEY 25-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C) C1 BACKFILLING
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 1ST LAYER BACKFILLING AT 12E-
CE-0293 CE-0257 24-May-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 FDT & SURVEY 25-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-D)D1 BACKFILLING
AREA

FDT & SURVEY INSPECTION


FOR 2ND LAYER
MMAH-CE-
CE-0294 CE-0258 25-May-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 28-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0295 CE-0259 25-May-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 28-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0296 CE-0260 25-May-23 12E-C01 ( AREA -D) D5 CUTTING AREA D5 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 28-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D5
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0297 CE-0261 25-May-23 12E-C01 ( AREA -D) D6 CUTTING AREA D6 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 28-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D6
CUTTING AREA

FDT & SURVEY INSPECTION


FOR 3RD LAYER
MMAH-CE-
CE-0298 CE-0262 28-May-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 29-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 3RD LAYER
MMAH-CE-
CE-0299 CE-0263 28-May-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 29-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 1ST LAYER
CE-0300 CE-0264 28-May-23
12E-C01(AREA-A)A3 CONTINUTAION
A3 MMAH-CE-
FDT & SURVEY
CONTINUTAION 29-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
1ST LAYER BACKFILLING AREA 002_2.1 REV.00 BACKFILLING AT 12E-
C01(AREA-A)A3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 4TH LAYER
MMAH-CE-
CE-0301 CE-0265 29-May-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 30-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 4TH LAYER
MMAH-CE-
CE-0302 CE-0266 29-May-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00
SOIL CLASSIFICATION BACKFILLING AT 12E- 30-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
CE-0303 CE-0267 29-May-23
12E-C01(AREA-A)A3 CONTINUTAION
A3 MMAH-CE-
FDT & SURVEY
CONTINUTAION 30-May-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
1ST LAYER BACKFILLING AREA 002_2.1 REV.00 BACKFILLING AT 12E-
C01(AREA-A)A3
BACKFILLING AREA
MATERIAL SOIL SAMPLING
CE-0304 CE-0268 3-Jun-23 12E-C01 ( AREA -D) D7 CUTTING AREA D7 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 4-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D7
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0305 CE-0269 3-Jun-23 12E-C01 ( AREA -D) D8 CUTTING AREA D8 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 4-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D8
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0306 CE-0270 3-Jun-23 12E-C01 ( AREA -D) D9 CUTTING AREA D9 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 4-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D9
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0307 CE-0271 3-Jun-23 12E-C01 ( AREA -D) D10 CUTTING AREA D 10 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 4-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D10
CUTTING AREA

FDT & SURVEY INSPECTION


FOR 1ST LAYER
MMAH-CE-
CE-0308 CE-0272 3-Jun-23 12E-C01(AREA-D) D6 BACKFILLING AREA D6 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 4-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D) D6
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
CE-0309 CE-0273 3-Jun-23 12E-C01(AREA-D) D6 BACKFILLING AREA D6 MMAH-CE-
FDT & SURVEY
(FGL) AFTER CUTTING TO 4-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 REDUCE LEVEL AT 12E-
C01(AREA-D) D6 CUTTING
AREA
FDT & SURVEY INSPECTION
FOR 5TH LAYER
MMAH-CE-
CE-0310 CE-0274 4-Jun-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 5-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
MMAH-CE-
CE-0311 CE-0275 5-Jun-23 12E-C01(AREA-D) D6 BACKFILLING AREA D6 002_2.1 REV.00 FDT & SURVEY (FGL) LAYER BACKFILLING 6-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01(AREA-D) D6
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 5TH LAYER
MMAH-CE-
CE-0312 CE-0276 5-Jun-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 6-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 6TH LAYER
MMAH-CE-
CE-0313 CE-0277 6-Jun-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 7-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 6TH LAYER
MMAH-CE-
CE-0314 CE-0278 6-Jun-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 7-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
MMAH-CE-
CE-0315 CE-0279 7-Jun-23 12E-C01(AREA-C) C4 BACKFILLING AREA C4 002_2.1 REV.00 FDT & SURVEY (FGL) AFTER CUTTING 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AREA AT 12E-C01(AREA-C)
C4 CUTTING AREA
FDT & SURVEY INSPECTION
FOR 7TH LAYER
MMAH-CE-
CE-0316 CE-0280 7-Jun-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 7TH LAYER
MMAH-CE-
CE-0317 CE-0281 7-Jun-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA
VISUAL INSPECTION FOR
CE-0318 WITNESS 7-Jun-23 12E-C01 AREA -E5 E5 CLEARING AND GRUBBING 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 AREA -E5

VISUAL INSPECTION FOR


CE-0319 WITNESS 7-Jun-23 12E-C01 AREA -E10 E 10 CLEARING AND GRUBBING 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 AREA -E10

MATERIAL SOIL SAMPLING


CE-0320 CE-0282 7-Jun-23 12E-C01 ( AREA -D) D7 CUTTING AREA D7
FOR SOIL CLASSIFICATION 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA -D) D7
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0321 CE-0283 7-Jun-23 12E-C01 ( AREA -D) D8 CUTTING AREA D8
FOR SOIL CLASSIFICATION 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA -D) D8
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0322 CE-0284 7-Jun-23 12E-C01 ( AREA -D) D9 CUTTING AREA D9
FOR SOIL CLASSIFICATION 8-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA -D) D9
CUTTING AREA

FDT & SURVEY INSPECTION


FOR 8TH LAYER
MMAH-CE-
CE-0323 CE-0285 10-Jun-23 12E-C01(AREA-C) C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 8TH LAYER
MMAH-CE-
CE-0324 CE-0286 10-Jun-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 1st LAYER
MMAH-CE-
CE-0325 CE-0287 10-Jun-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D2
BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0326 WITNESS 10-Jun-23 12E-C01 AREA -G6 G6 002_1.4 REV.00 VISUAL INSPECTION CLEARING AND GRUBBING 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 AREA -G6

VISUAL INSPECTION FOR


MMAH-CE-
CE-0327 WITNESS 10-Jun-23 12E-C01 AREA -G7 G7 002_1.4 REV.00 VISUAL INSPECTION CLEARING AND GRUBBING 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 AREA -G7

MATERIAL SOIL SAMPLING


CE-0328 CE-0288 10-Jun-23 12E-C01 ( AREA -D) D7 CUTTING AREA D7 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D7
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0329 CE-0289 10-Jun-23 12E-C01 ( AREA -D) D8 CUTTING AREA D8 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D8
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0330 CE-0290 10-Jun-23 12E-C01 ( AREA -D) D9 CUTTING AREA D9 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D9
CUTTING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0331 WITNESS 10-Jun-23 12E-C01 AREA -G1 G1 002_1.4 REV.00 VISUAL INSPECTION CLEARING AND GRUBBING 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 AREA -G1

VISUAL INSPECTION FOR


MMAH-CE-
CE-0332 WITNESS 10-Jun-23 12E-C01 AREA -E4 E4 002_1.4 REV.00 VISUAL INSPECTION CLEARING AND GRUBBING 11-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 AREA -E4

FDT & SURVEY INSPECTION


FOR 9TH LAYER
MMAH-CE-
CE-0333 CE-0291 11-Jun-23 12E-C01(AREA-D)D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 12-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0334 CE-0292 11-Jun-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 12-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 1st LAYER
MMAH-CE-
CE-0335 CE-0293 11-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 12-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 9TH LAYER
MMAH-CE-
CE-0336 CE-0294 11-Jun-23 12E-C01(AREA-C)C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 12-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C)C1
BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0337 Witness 11-Jun-23 12E-C01 AREA -E11 E 11 002_1.4 REV.00 VISUAL INSPECTION CLEARING AND GRUBBING 12-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 AREA -E11

FDT & SURVEY INSPECTION


FOR 10TH LAYER
MMAH-CE-
CE-0338 CE-0295 12-Jun-23 12E-C01(AREA-C)C1 BACKFILLING AREA C1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 13-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C)C1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
CE-0339 CE-0296 12-Jun-23 12E-C01(AREA-C)C1 CUTTING AREA C3 MMAH-CE-
FDT & SURVEY
(FGL) AFTER CUTTING TO 13-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 REDUCE LEVEL AT 12E-
C01(AREA-C)C3 CUTTING
AREA
MATERIAL SOIL SAMPLING
CE-0340 CE-0297 12-Jun-23 12E-C01 ( AREA -D) D7 CUTTING AREA D7 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 13-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D7
CUTTING AREA
MATERIAL SOIL SAMPLING
CE-0341 CE-0298 12-Jun-23 12E-C01 ( AREA -D) D8 CUTTING AREA D8 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 13-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D8
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0342 CE-0299 12-Jun-23 12E-C01 ( AREA -D) D9 CUTTING AREA D9 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 13-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D9
CUTTING AREA

FDT & SURVEY INSPECTION


FOR 3RD LAYER
MMAH-CE-
CE-0343 CE-0300 13-Jun-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 14-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0344 CE-0301 13-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 14-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0345 CE-0302 13-Jun-23 12E-C01 ( AREA -D) D8 CUTTING AREA D8 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 14-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D8
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0346 CE-0303 13-Jun-23 12E-C01 ( AREA -D) D9 CUTTING AREA D9 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 14-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D9
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0347 CE-0304 13-Jun-23 12E-C01 ( AREA -D) D10 CUTTING AREA D 10 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 14-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D10
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0348 CE-0305 14-Jun-23 12E-C01 ( AREA -D) D7 CUTTING AREA D7 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 15-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D7
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0349 CE-0306 14-Jun-23 12E-C01 ( AREA -D) D7 CUTTING AREA D8 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 15-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D8
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0350 CE-0307 14-Jun-23 12E-C01 ( AREA -D) D9 CUTTING AREA D9 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 15-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D9
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0351 CE-0308 14-Jun-23 12E-C01 ( AREA -D) D10 CUTTING AREA D 10 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 15-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 ( AREA -D) D10
CUTTING AREA

FDT & SURVEY INSPECTION


FOR 1ST LAYER
MMAH-CE-
CE-0352 CE-0309 14-Jun-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 15-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 4TH LAYER
MMAH-CE-
CE-0353 CE-0310 17-Jun-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 18-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 3RD LAYER
MMAH-CE-
CE-0354 CE-0311 17-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 18-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0355 CE-0312 18-Jun-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 19-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 5TH LAYER
MMAH-CE-
CE-0356 CE-0313 19-Jun-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 20-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 4TH LAYER
MMAH-CE-
CE-0357 CE-0314 19-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 20-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0358 WITNESS 19-Jun-23 12E-C01 ( AREA - E) E-2 E2 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 20-Jun-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
C01 ( AREA - E) E-2

VISUAL INSPECTION FOR


MMAH-CE-
CE-0359 WITNESS 19-Jun-23 12E-C01 ( AREA - E) E-3 E3 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 20-Jun-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
C01 ( AREA - E) E-3

VISUAL INSPECTION FOR


MMAH-CE-
CE-0360 WITNESS 19-Jun-23 12E-C01 ( AREA - E) E-6 E6 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12E- 20-Jun-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
C01 ( AREA - E) E-6

FDT & SURVEY INSPECTION


FOR 3RD LAYER
MMAH-CE-
CE-0361 CE-0315 20-Jun-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 21-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 5TH LAYER
MMAH-CE-
CE-0362 CE-0316 21-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 22-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 4TH LAYER
MMAH-CE-
CE-0363 CE-0317 21-Jun-23 12E-C01(AREA-D)D4 D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 22-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 6TH LAYER
MMAH-CE-
CE-0364 CE-0318 22-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 24-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 6TH LAYER
MMAH-CE-
CE-0365 CE-0319 24-Jun-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 25-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 5TH LAYER
MMAH-CE-
CE-0366 CE-0320 24-Jun-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 25-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 7TH LAYER
MMAH-CE-
CE-0367 CE-0321 24-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 25-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 8TH LAYER
MMAH-CE-
CE-0368 CE-0322 25-Jun-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 26-Jun-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D3
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0369 CE-0323 26-Jun-23 12E-C01 (AREA-D)D9 CUTTING AREA D9 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 2-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 (AREA-D)D9
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0370 CE-0324 26-Jun-23 12E-C01 (AREA-D)D10 CUTTING AREA D 10 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 2-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01 (AREA-D)D10
CUTTING AREA

VISUAL INSPECTION FOR


CLEARING AND GRUBBING
MMAH-CE-
CE-0371 WITNESS 4-Jul-23 12E-C01 ( AREA-E) E1 E1 002_1.4 REV.00 VISUAL INSPECTION PRIOR TO CUTTING OR 5-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AT 12E-C01
( AREA-E) E1

VISUAL INSPECTION FOR


CE-0372 WITNESS 4-Jul-23 12E-C01 ( AREA-E) E7 E7 MMAH-CE- CLEARING AND GRUBBING
002_1.4 REV.00 VISUAL INSPECTION 5-Jul-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
PRIOR TO BACKFILLING AT
12E-C01 ( AREA-E) E7

VISUAL INSPECTION FOR


CE-0373 WITNESS 4-Jul-23 12E-C01 ( AREA-E) E8 E8 MMAH-CE- CLEARING AND GRUBBING
002_1.4 REV.00 VISUAL INSPECTION 5-Jul-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
PRIOR TO BACKFILLING AT
12E-C01 ( AREA-E) E8

VISUAL INSPECTION FOR


CE-0374 WITNESS 4-Jul-23 12E-C01 ( AREA-E) E9 E9 MMAH-CE- CLEARING AND GRUBBING
002_1.4 REV.00 VISUAL INSPECTION 5-Jul-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
PRIOR TO BACKFILLING AT
12E-C01 ( AREA-E) E9

FDT & SURVEY INSPECTION


FOR 6TH LAYER
MMAH-CE-
CE-0375 CE-0325 5-Jul-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 6-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 7TH LAYER
MMAH-CE-
CE-0376 CE-0326 6-Jul-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 8-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0377 CE-0327 6-Jul-23 12E-C01(AREA-D) D9 CUTTING AREA D9 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 8-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-D) D9
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0378 CE-0328 6-Jul-23 12E-C01(AREA-D) D10 CUTTING AREA D 10 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 8-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-D) D10
CUTTING AREA

FDT & SURVEY INSPECTION


FOR 8TH LAYER
MMAH-CE-
CE-0379 CE-0329 8-Jul-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 10-Jul-23 ENGR-EDEN ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D4
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0380 CE-0330 8-Jul-23 12E-C01(AREA-E)E1 BACKFILLING AREA E1 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 10-Jul-23 ENGR-EDEN ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E1
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 5th LAYER REJECTED /
MMAH-CE-
CE-0381 CE-0331 9-Jul-23 12E-C01(AREA-B)B1 BACKFILLING AREA B1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 10-Jul-23 ENGR-EDEN ABDUL HANNAN JOB NOT CIVIL
C01(AREA-B)B1 READY
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 5th LAYER REJECTED /
MMAH-CE-
CE-0381A CE-0336 12-Jul-23 12E-C01(AREA-B)B1 BACKFILLING AREA B1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 10-Jul-23 ENGR-TURKI ABDUL HANNAN JOB NOT CIVIL
C01(AREA-B)B1 READY
BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0382 WITNESS 10-Jul-23 12E-C01 ( AREA - G) G-3 G3 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 11-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - G) G-3

VISUAL INSPECTION
CE-0383 WITNESS 10-Jul-23 12E-C01 ( AREA - G) G-10 G 10 MMAH-CE- FOR CLEARING &
002_1.4 REV.00 VISUAL INSPECTION 11-Jul-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
GURBBING AT 12E-C01 (
AREA - G) G-10

FDT & SURVEY INSPECTION


CE-0384 CE-0332 10-Jul-23 12E-C01(AREA-G)G3 BACKFILLING AREA G3 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 11-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-G)G3
BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0385 WITNESS 11-Jul-23 12E-C01 ( AREA - G) G-4 G4 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 12-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - G) G-4
VISUAL INSPECTION
CE-0386 WITNESS 11-Jul-23 12E-C01 ( AREA - G) G-9 G9 MMAH-CE- FOR CLEARING &
002_1.4 REV.00 VISUAL INSPECTION 12-Jul-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
GURBBING AT 12E-C01 (
AREA - G) G-9

FDT & SURVEY INSPECTION


CE-0387 CE-0333 11-Jul-23 12E-C01(AREA-E)E2 BACKFILLING AREA E2 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 12-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E2
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0388 CE-0334 11-Jul-23 12E-C01(AREA-E)E11 BACKFILLING AREA E 11 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 12-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E11
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0389 CE-0335 11-Jul-23 12E-C01(AREA-E)E3 BACKFILLING AREA E3 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 12-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E3
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0390 CE-0336 11-Jul-23 12E-C01(AREA-E)E4 BACKFILLING AREA E4 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 12-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E4
BACKFILLING AREA

VISUAL INSPECTION FOR


MMAH-CE-
CE-0391 WITNESS 12-Jul-23 2E-C01 ( AREA - G) G-2 G2 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 13-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - G) G-2

VISUAL INSPECTION FOR


MMAH-CE-
CE-0392 WITNESS 12-Jul-23 12E-C01 ( AREA - G) G-5 G5 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 13-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - G) G-5

VISUAL INSPECTION FOR


MMAH-CE-
CE-0393 WITNESS 12-Jul-23 12E-C01 ( AREA - G) G-8 G8 002_1.4 REV.00 VISUAL INSPECTION CLEARING & GURBBING AT 13-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA - G) G-8

MATERIAL SOIL SAMPLING


FOR SOIL SOIL
MMAH-CE-
CE-0394 CE-0338 13-Jul-23 12E-C01 ( AREA-D) D9 CUTTING AREA D9 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION 12E-C01 15-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA-D) D9 CUTTING
AREA
MATERIAL SOIL SAMPLING
FOR SOIL SOIL
MMAH-CE-
CE-0395 CE-0339 13-Jul-23 12E-C01 ( AREA-D) D10 CUTTING AREA D 10 002_2.1 REV.00
SOIL CLASSIFICATION CLASSIFICATION 12E-C01 15-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
( AREA-D) D10 CUTTING
AREA
MATERIAL SOIL SAMPLING
FOR SOIL CLASSIFICATION
12E-C01 ( AREA-B) B1 BACKFILLING MMAH-CE-
CE-0396 CE-0340 13-Jul-23
AREA FROM 6TH LAYER
B1 002_2.1 REV.00
SOIL CLASSIFICATION 12E-C01 ( AREA-B) B1 15-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA FROM
6TH LAYER
FDT & SURVEY INSPECTION
FOR 6th LAYER
MMAH-CE-
CE-0397 CE-0341 13-Jul-23 12E-C01(AREA-B)B1 BACKFILLING AREA B1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 15-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B)B1
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0398 CE-0342 15-Jul-23 12E-C01(AREA-E)E5 BACKFILLING AREA E5 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 16-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E5
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0399 CE-0343 15-Jul-23 12E-C01(AREA-E)E6 BACKFILLING AREA E6 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 16-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E6
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0400 CE-0344 15-Jul-23 12E-C01(AREA-E)E7 BACKFILLING AREA E7 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 16-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E7
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0401 CE-0345 15-Jul-23 12E-C01(AREA-E)E10 BACKFILLING AREA E 10 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 16-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E10
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 7th LAYER
MMAH-CE-
CE-0402 CE-0346 15-Jul-23 12E-C01(AREA-B)B1 BACKFILLING AREA B1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 16-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B)B1
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0403 CE-0347 16-Jul-23 12E-C01(AREA-E)E8 BACKFILLING AREA E8 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 17-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E8
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0404 CE-0348 16-Jul-23 12E-C01(AREA-E)E9 BACKFILLING AREA E9 MMAH-CE-
FDT & SURVEY
FOR SUBGRADE (NGL) AT 17-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 12E-C01(AREA-E)E9
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 1ST LAYER
MMAH-CE-
CE-0405 CE-0349 16-Jul-23 12E-C01(AREA-E)E2 BACKFILLING AREA E2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 17-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-E)E2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 8th LAYER
MMAH-CE-
CE-0406 CE-0350 16-Jul-23 12E-C01(AREA-B)B1 BACKFILLING AREA B1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 17-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B)B1
BACKFILLING AREA
MATERIAL SOIL SAPLING
FOR SOIL CLASSIFICATION
Borrow pit AT BORROW PIT AREA
BORROW PIT AREA NEAR 12E-C01
N:3039636.352 MMAH-CE-
CE-0407 CE-0351 16-Jul-23 PROJECT SERVEY COORDINATES :-
E:304696.544 002_2.1 REV.00
SOIL CLASSIFICATION NEAR 12E-C01 PROJECT 17-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
N:3039636.352 E:304696.544 SERVEY COORDINATES :-
3039636
N:3039636.352
MATERIAL SOIL SAPLING
E:304696.544
FOR SOIL CLASSIFICATION
BORROW PIT AREA NEAR 12E-C01 N:3039682.982 AT BORROW PIT AREA
MMAH-CE-
CE-0408 CE-0352 16-Jul-23 PROJECT SERVEY COORDINATES :- E:304703.853 002_2.1 REV.00
SOIL CLASSIFICATION NEAR 12E-C01 PROJECT 17-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
N:3039682.982 E:304703.853 3039682 SERVEY COORDINATES :-
N:3039682.982
E:304703.853
MATERIAL SOIL SAPLING
FOR SOIL CLASSIFICATION
borrow Pit AT BORROW PIT AREA
BORROW PIT AREA NEAR 12E-C01
N:3039704.414 MMAH-CE-
CE-0409 CE-0353 16-Jul-23 PROJECT SERVEY COORDINATES :-
E:304732.530 002_2.1 REV.00
SOIL CLASSIFICATION NEAR 12E-C01 PROJECT 17-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
N:3039704.414 E:304732.530 SERVEY COORDINATES :-
3039704
N:3039704.414
E:304732.530
FDT & SURVEY INSPECTION
FOR 9th LAYER
MMAH-CE-
CE-0410 CE-0354 17-Jul-23 12E-C01(AREA-B)B1 BACKFILLING AREA B1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 18-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-B)B1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0411 CE-0355 17-Jul-23 12E-C01(AREA-E)E2 BACKFILLING AREA E2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 18-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-E)E2
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0412 CE-0356 17-Jul-23 12E-C01(AREA-C)C2 BACKFILLING AREA C2 MMAH-CE-
FDT & SURVEY
FINAL GRADE LEVEL (FGL) 18-Jul-23 ENGR-TURKI ABDUL HANNAN canceled CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-C)C2
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0412A CE-0356 24-Oct-23 12E-C01(AREA-C)C2 BACKFILLING AREA C2 MMAH-CE-
FDT & SURVEY
9th LAYER LEVEL AT 12E- 25-Oct-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 C01(AREA-C)C2
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 3RD LAYER
MMAH-CE-
CE-0413 CE-0357 18-Jul-23 12E-C01(AREA-E)E2 BACKFILLING AREA E2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 19-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-E)E2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 1ST LAYER
MMAH-CE-
CE-0414 CE-0358 19-Jul-23 12E-C01(AREA-D)D5 BACKFILLING AREA D5 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 20-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D5
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 1ST LAYER
MMAH-CE-
CE-0415 CE-0359 19-Jul-23 12E-C01(AREA-D)D7 BACKFILLING AREA D7 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 20-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D7
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 4TH LAYER
MMAH-CE-
CE-0416 CE-0360 19-Jul-23 12E-C01(AREA-E)E2 BACKFILLING AREA E2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 20-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-E)E2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0417 CE-0361 20-Jul-23 12E-C01(AREA-D)D5 BACKFILLING AREA D5 002_2.1 REV.01 FDT & SURVEY BACKFILLING AT 12E- 22-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D5
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0418 CE-0362 20-Jul-23 12E-C01(AREA-D)D7 BACKFILLING AREA D7 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 22-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D7
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
MMAH-CE-
CE-0419 CE-0363 23-Jul-23 12E-C01(AREA-D)D7 BACKFILLING AREA D7 002_2.1 REV.00 FDT & SURVEY (FGL) LAYER BACKFILLING 24-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01(AREA-D)D7
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 3RD LAYER
MMAH-CE-
CE-0420 CE-0364 23-Jul-23 12E-C01(AREA-A)A3 BACKFILLING AREA A3 002_2.1 REV.02 FDT & SURVEY BACKFILLING AT 12E- 24-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-A)A3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
MMAH-CE-
CE-0421 CE-0365 24-Jul-23 12E-C01(AREA-B)B1 BACKFILLING AREA B1 002_2.1 REV.02 FDT & SURVEY ( FGL) LAYER BACKFILLING 25-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01(AREA-B)B1
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
MMAH-CE-
CE-0422 CE-0366 24-Jul-23 12E-C01(AREA-B)B2 BACKFILLING AREA B2 002_2.1 REV.02 FDT & SURVEY ( FGL) LAYER BACKFILLING 25-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01(AREA-B)B2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 4TH LAYER
MMAH-CE-
CE-0423 CE-0367 24-Jul-23 12E-C01(AREA-A)A3 BACKFILLING AREA A3 002_2.1 REV.02 FDT & SURVEY BACKFILLING AT 12E- 25-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-A)A3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 5TH LAYER
MMAH-CE-
CE-0424 CE-0368 25-Jul-23 12E-C01(AREA-A)A3 BACKFILLING AREA A3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 26-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-A)A3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 1ST LAYER
MMAH-CE-
CE-0425 CE-0369 25-Jul-23 12E-C01(AREA-D)D9 BACKFILLING ARE D9 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 26-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D9
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
CE-0426 CE-0370 25-Jul-23
12E-C01(AREA-D)D 10 BACKFILLING
D 10 MMAH-CE-
FDT & SURVEY
( FGL ) AFTER CUTTING TO 26-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 REDUCE LEVE AT 12E-
C01(AREA-D)D 10 CUTTING
AREA
FDT & SURVEY INSPECTION
FOR 6TH LAYER
MMAH-CE-
CE-0427 CE-0371 26-Jul-23 12E-C01(AREA-A)A3 BACKFILLING AREA A3 002_2.1 REV.02 FDT & SURVEY BACKFILLING AT 12E- 27-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-A)A3
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 2nd LAYER
MMAH-CE-
CE-0428 CE-0372 26-Jul-23 12E-C01(AREA-D)D9 BACKFILLING AREA D9 002_2.1 REV.02 FDT & SURVEY BACKFILLING AT 12E- 27-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D9
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 6TH LAYER
MMAH-CE-
CE-0429 CE-0373 29-Jul-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 30-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 3rd LAYER
MMAH-CE-
CE-0430 CE-0374 29-Jul-23 12E-C01(AREA-D)D9 BACKFILLING AREA D9 002_2.1 REV.02 FDT & SURVEY BACKFILLING AT 12E- 30-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-D)D9
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR NGL
MMAH-CE-
CE-0431 CE-0375 29-Jul-23 12E-C01 (AREA-G)G2 BACKFILLING AREA G2 002_2.1 REV.00 FDT & SURVEY ( SUBGRADE) AT 12E-C01 30-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-G)G2 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR NGL
MMAH-CE-
CE-0432 CE-0376 29-Jul-23 12E-C01 (AREA-G)G3 BACKFILLING AREA G3 002_2.1 REV.00 FDT & SURVEY ( SUBGRADE) AT 12E-C01 30-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-G)G3 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR NGL
MMAH-CE-
CE-0433 CE-0377 29-Jul-23 12E-C01 (AREA-G)G4 BACKFILLING AREA G4 002_2.1 REV.02 FDT & SURVEY ( SUBGRADE) AT 12E-C01 30-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-G)G4 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR NGL
MMAH-CE-
CE-0434 CE-0378 29-Jul-23 12E-C01 (AREA-G)G5 BACKFILLING AREA G5 002_2.1 REV.02 FDT & SURVEY ( SUBGRADE) AT 12E-C01 30-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
(AREA-G)G5 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR( FGL) FINAL GRADE
CE-0435 CE-0379 30-Jul-23 12E-C01 AREA-D8 CUTTING AREA D8 MMAH-CE-
FDT & SURVEY
LEVEL LAYER AFTER 31-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.02 CUTTING TO REDUCE LEVEL
AT 12E-C01 AREA-D8
CUTTING AREA
FDT & SURVEY INSPECTION
FOR( FGL) FINAL GRADE
MMAH-CE-
CE-0436 CE-0380 30-Jul-23 12E-C01 AREA-D1 BACKFILLING AREA D1 002_2.1 REV.00 FDT & SURVEY LEVEL LAYER AT 12E-C01 31-Jul-23 ENGR-TURKI ABDUL HANNAN Accepted CIVIL
AREA-D1 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR( FGL) FINAL GRADE
MMAH-CE-
CE-0437 CE-0381 31-Jul-23 12E-C01(AREA-D)D2 BACKFILLING AREA D2 002_2.1 REV.00 FDT & SURVEY LEVEL LAYER BACKFILLING 1-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01(AREA-D)D2
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR( FGL) FINAL GRADE
MMAH-CE-
CE-0438 CE-0382 31-Jul-23 12E-C01(AREA-D)D3 BACKFILLING AREA D3 002_2.1 REV.00 FDT & SURVEY LEVEL LAYER BACKFILLING 1-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01(AREA-D)D3
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0439 CE-0383 31-Jul-23 12E-C01(AREA-E) E1 CUTTING AREA E1 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 1-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-E) E1
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0440 CE-0384 31-Jul-23 12E-C01(AREA-E) E2 CUTTING AREA E2 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 1-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-E) E2
CUTTING AREA

FDT & SURVEY INSPECTION


FOR( FGL) FINAL GRADE
MMAH-CE-
CE-0441 CE-0385 1-Aug-23 12E-C01(AREA-D)D4 BACKFILLING AREA D4 002_2.1 REV.00 FDT & SURVEY LEVEL LAYER BACKFILLING 2-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01(AREA-D)D4
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0442 CE-0386 2-Aug-23
12E-C01 ( AREA-G) G8 BACKFILLING
G8 MMAH-CE-
FDT & SURVEY
FOR (NGL) SUBGRADE AT 3-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E-C01 ( AREA-G) G8
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0443 CE-0387 2-Aug-23
12E-C01 ( AREA-G) G9 BACKFILLING
G9 MMAH-CE-
FDT & SURVEY
FOR (NGL) SUBGRADE AT 3-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E-C01 ( AREA-G) G9
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0444 CE-0388 2-Aug-23
12E-C01 ( AREA-G) G10 BACKFILLING
G 10 MMAH-CE-
FDT & SURVEY
FOR (NGL) SUBGRADE AT 3-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E-C01 ( AREA-G) G10
BACKFILLING AREA

FDT & SURVEY INSPECTION


CE-0445 CE-0389 2-Aug-23
12E-C01 ( AREA-G) G6 BACKFILLING
G6 MMAH-CE-
FDT & SURVEY
FOR (NGL) SUBGRADE AT 3-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E-C01 ( AREA-G) G6
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 1ST LAYER
MMAH-CE-
CE-0446 CE-0390 2-Aug-23 12E-C01 ( AREA-E) E1 BACKFILLING AREA E1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 3-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E1 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 1ST LAYER
MMAH-CE-
CE-0447 CE-0391 2-Aug-23 12E-C01 ( AREA-E) E7 BACKFILLING AREA E7 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 3-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E7 BACKFILLING
AREA
MATERIAL RECEVING
INSPECTION (MRI) FOR
MATERIAL RECEVING 12E-C01 PROJECT CHAIN
MMAH-CE-
CE-0448 CE-0392 5-Aug-23 INSPECTION/CHAIN LINK FENCE / FENCE Inspection 6-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
LAYDOWN STORE AREA
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0449 CE-0393 5-Aug-23 12E-C01 ( AREA-E) E1 BACKFILLING AREA E1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 6-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E1 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0450 CE-0394 5-Aug-23 12E-C01 ( AREA-E) E7 BACKFILLING AREA E7 002_2.1 REV.02 FDT & SURVEY BACKFILLING AT 12E-C01 6-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E7 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 7TH LAYER
12E-C01 ( AREA-A) A3 BACKFILLING MMAH-CE-
CE-0451 CE-0395 5-Aug-23
AREA
A3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 6-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-A) A3 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 1ST LAYER
MMAH-CE-
CE-0452 CE-0396 5-Aug-23 12E-C01 ( AREA-F) F4 BACKFILLING AREA F4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 6-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-F) F4 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 3RD LAYER
MMAH-CE-
CE-0453 CE-0397 6-Aug-23 12E-C01 ( AREA-E) E1 BACKFILLING AREA E1 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 7-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E1 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 3RD LAYER
MMAH-CE-
CE-0454 CE-0398 6-Aug-23 12E-C01 ( AREA-E) E7 BACKFILLING AREA E7 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 7-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E7 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 8TH LAYER
12E-C01 ( AREA-A) A3 BACKFILLING MMAH-CE-
CE-0455 CE-0399 6-Aug-23
AREA
A3 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 7-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-A) A3 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 2ND LAYER
MMAH-CE-
CE-0456 CE-0400 6-Aug-23 12E-C01 ( AREA-F) F4 BACKFILLING AREA F4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 7-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-F) F4 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
12E-C01 ( AREA-D) D9 BACKFILLING MMAH-CE-
CE-0457 CE-0401 6-Aug-23
AREA
D 9 002_2.1 REV.00 FDT & SURVEY (FGL) LAYER BACKFILLING 7-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA-D) D9
BACKFILLING AREA
FDT & SURVEY INSPECTION
FOR 3rd LAYER
MMAH-CE-
CE-0458 CE-0402 7-Aug-23 12E-C01 ( AREA-F) F4 BACKFILLING AREA F4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 8-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-F) F4 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 4th LAYER
MMAH-CE-
CE-0459 CE-0403 7-Aug-23 12E-C01 ( AREA-E) E7 BACKFILLING AREA E7 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 8-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E7 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR FINAL GRADE LEVEL
12E-C01 ( AREA-C) C1 BACKFILLING MMAH-CE-
CE-0460 CE-0404 7-Aug-23
AREA
C1 002_2.1 REV.02 FDT & SURVEY (FGL) LAYER BACKFILLING 8-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA-C) C1
BACKFILLING AREA
MATERIAL RECEVING
INSPECTION (MRI) FOR
MATERIAL RECEVING 12E-C01 PROJECT CHAIN
MMAH-CE-
CE-0461 CE-0405 7-Aug-23 INSPECTION/CHAIN LINK FENCE / FENCE Inspection 8-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
LAYDOWN STORE AREA
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION
FOR 4thLAYER
MMAH-CE-
CE-0462 CE-0406 8-Aug-23 12E-C01 ( AREA-F) F4 BACKFILLING AREA F4 002_2.1 REV.02 FDT & SURVEY BACKFILLING AT 12E-C01 9-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-F) F4 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 5th LAYER
12E-C01 ( AREA-E) E7 BACKFILLING MMAH-CE-
CE-0463 CE-0407 8-Aug-23
AREA
E7 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 9-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E7 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 5thLAYER
MMAH-CE-
CE-0464 CE-0408 9-Aug-23 12E-C01 ( AREA-F) F4 BACKFILLING AREA F4 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 10-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-F) F4 BACKFILLING
AREA
FDT & SURVEY INSPECTION
FOR 6th LAYER
MMAH-CE-
CE-0465 CE-0409 9-Aug-23 12E-C01 ( AREA-E) E7 BACKFILLING AREA E7 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E-C01 10-Aug-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
( AREA-E) E7 BACKFILLING
AREA
MATERIAL RECEVING
INSPECTION (MRI) FOR
MATERIAL RECEVING 12E-C01 PROJECT CHAIN
MMAH-CE-
CE-0466 CE-0410 15-Aug-23 INSPECTION/CHAIN LINK FENCE / FENCE Inspection 16-Aug-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
LAYDOWN STORE AREA
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MRI) FOR
MATERIAL RECEVING 12E-C01 PROJECT CHAIN
MMAH-CE-
CE-0467 CE-0411 20-Aug-23 INSPECTION/CHAIN LINK FENCE / FENCE Inspection 21-Aug-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
LAYDOWN STORE AREA
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MRI) FOR
MATERIAL RECEVING 12E-C01 PROJECT CHAIN
MMAH-CE-
CE-0468 CE-0412 22-Aug-23 INSPECTION/CHAIN LINK FENCE / FENCE Inspection 23-Aug-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
LAYDOWN STORE AREA
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
MATERIAL RECEVING 12E-C01 PROJECT CHAIN
MMAH-CE-
CE-0469 CE-0413 27-Aug-23 INSPECTION/CHAIN LINK FENCE / FENCE Inspection 28-Aug-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
LAYDOWN STORE AREA
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
MATERIAL RECEVING 12E-C01 PROJECT CHAIN
MMAH-CE-
CE-0470 CE-0414 28-Aug-23 INSPECTION/CHAIN LINK FENCE / FENCE Inspection 29-Aug-23 ENGR EDEN ABDUL HANNAN Accepted CIVIL
LAYDOWN STORE AREA
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - C) C-5 BACKFILLING MMAH-CE- 1st LAYER BACKFILLING LEVEL AT
CE-0471 CE-0415 4-Sep-23 C5 FDT & SURVEY 5-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - C) C-5
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-8 MMAH-CE- 1ST LAYER BACKFILLING LEVEL AT RE-INSPECTION
CE-0472 CE-0416 5-Sep-23 F8 FDT & SURVEY 6-Sep-23 ENGR TURKI ABDUL HANNAN CIVIL
BACKFILLING AREA 002_2.1 REV.00 12E C01 ( AREA - F) F-8 REQUIRED
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-8 MMAH-CE- 1ST LAYER BACKFILLING LEVEL AT
CE-0472A CE-0416 5-Sep-23 F8 FDT & SURVEY 6-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 002_2.1 REV.00 12E C01 ( AREA - F) F-8
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - C) C-5 MMAH-CE- 2ND LAYER BACKFILLING LEVEL
CE-0473 CE-0417 6-Sep-23 C5 FDT & SURVEY 7-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 002_2.1 REV.00 AT 12E C01 ( AREA - C) C-5
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-8 MMAH-CE- 2nd LAYER BACKFILLING LEVEL AT
CE-0474 CE-0418 9-Sep-23 F8 FDT & SURVEY 10-Sep-23 ENGR - TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 002_2.1 REV.00 12E C01 ( AREA - F) F-8
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - C) C-5 MMAH-CE- 3rd LAYER BACKFILLING LEVEL AT
CE-0475 CE-0419 10-Sep-23 C5 FDT & SURVEY 11-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 002_2.1 REV.00 12E C01 ( AREA - C) C-5
BACKFILLING AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - F) F-8 MMAH-CE- 3RD LAYER BACKFILLING LEVEL AT
CE-0476 CE-0420 11-Sep-23 F8 FDT & SURVEY 12-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 002_2.1 REV.00 12E C01 ( AREA - F) F-8
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - C) C-5 BACKFILLING MMAH-CE- 4th LAYER BACKFILLING LEVEL AT
CE-0477 CE-0421 16-Sep-23 C5 FDT & SURVEY 17-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - C) C-5
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - F) F-8 MMAH-CE- 4th LAYER BACKFILLING LEVEL AT
CE-0478 CE-0422 16-Sep-23 F8 FDT & SURVEY 17-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 002_2.1 REV.00 12E C01 ( AREA - F) F-8
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-6 BACKFILLING MMAH-CE- 1ST LAYER BACKFILLING LEVEL AT
CE-0479 CE-0423 16-Sep-23 E6 FDT & SURVEY 17-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-6
BACKFILLING AREA

MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0480 CE-0424 16-Sep-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 17-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - C) C-5 BACKFILLING MMAH-CE- 2nd LAYER BACKFILLING LEVEL
CE-0481 CE-0425 18-Sep-23 E6 FDT & SURVEY 19-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-6
BACKFILLING AREA

MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0482 CE-0426 19-Sep-23
12E C01 ( AREA - F) F-8
FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 20-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - E) E-6 BACKFILLING MMAH-CE- 3RD LAYER BACKFILLING LEVEL AT
CE-0483 CE-0427 20-Sep-23 E6 FDT & SURVEY 21-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-6
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0484 CE-0428 24-Sep-23
12E C01 ( AREA - E) E-6 BACKFILLING
E6 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 25-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E-C01(AREA-E) E6
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0485 CE-0429 24-Sep-23
12E C01 ( AREA - E) E-6 BACKFILLING
E6 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 25-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E-C01(AREA-E) E6
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0486 CE-0430 24-Sep-23
12E C01 ( AREA - E) E-6 BACKFILLING
E6 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 25-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E-C01(AREA-E) E6
BACKFILLING AREA

MATERIAL SOIL SAMPLING


CE-0487 CE-0431 24-Sep-23
12E C01 ( AREA - E) E-6 BACKFILLING
E6 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 25-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E-C01(AREA-E) E6
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-6 BACKFILLING MMAH-CE- 4TH LAYER BACKFILLING LEVEL AT RE-INSPECTION
CE-0488 CE-0432 25-Sep-23 E6 FDT & SURVEY 26-Sep-23 ENGR TURKI ABDUL HANNAN CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-6 REQUIRED
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-6 BACKFILLING MMAH-CE- 4TH LAYER BACKFILLING LEVEL AT
CE-0488A CE-0432 25-Sep-23 E6 FDT & SURVEY 26-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-6
BACKFILLING AREA

MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0489 CE-0433 26-Sep-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 27-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0490 CE-0434 28-Sep-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 30-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0491 CE-0435 1-Oct-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 2-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL SOIL SAMPLING
CE-0492 CE-0436 4-Oct-23 12E-C01(AREA-E)E1 CUTTING AREA E1 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 5-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-E)E1
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0493 CE-0437 4-Oct-23 12E-C01(AREA-E)E2 CUTTING AREA E2 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 5-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-E)E2
CUTTING AREA

MATERIAL SOIL SAMPLING


CE-0494 CE-0438 4-Oct-23 12E-C01(AREA-E)E3 CUTTING AREA E3 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 5-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-E)E3
CUTTING AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0495 CE-0439 5-Oct-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 7-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0495 CE-0439 5-Oct-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 7-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 2ND LAYER BACKFILLING LEVEL
CE-0496 CE-0440 21-Oct-23 A4 FDT & SURVEY 22-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA
MATERIAL SOIL SAMPLING
CE-0497 CE-0441 21-Oct-23 12E-C01(AREA-A)A4 BACKFILLINF LAYER A4 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 22-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-A)A4
BACKFILLING LAYER

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 3rd LAYER BACKFILLING LEVEL AT
CE-0498 CE-0442 22-Oct-23 A4 FDT & SURVEY 23-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-3 BACKFILLING MMAH-CE- 9TH LAYER BACKFILLING LEVEL
CE-0499 CE-0443 22-Oct-23 A3 FDT & SURVEY 23-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-3
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 5TH LAYER BACKFILLING LEVEL
CE-0500 CE-0444 22-Oct-23 ( AREA - E) E-6 BACKFILLING AREA E6 FDT & SURVEY 23-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E C01 ( AREA - E) E-6
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 4TH LAYER BACKFILLING LEVEL
CE-0501 CE-0445 23-Oct-23 A4 FDT & SURVEY 24-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-6 BACKFILLING MMAH-CE- 6TH LAYER BACKFILLING LEVEL
CE-0502 CE-0446 23-Oct-23 E6 FDT & SURVEY 24-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-6
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 9TH LAYER
MMAH-CE-
CE-0412A CE-0356 23-Oct-23 12E-C01(AREA-C)C2 BACKFILLING AREA C 2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 24-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C2
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 10TH LAYER BACKFILLING LEVEL
CE-0503 CE-0447 24-Oct-23 A4 FDT & SURVEY 25-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-3
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 10TH LAYER
MMAH-CE-
CE-0504 CE-0448 25-Oct-23 12E-C01(AREA-C) C2 BACKFILLING AREA C 2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 26-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C2
BACKFILLING AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - A) A-4 MMAH-CE- 5TH LAYER BACKFILLING LEVEL
CE-0505 CE-0449 25-Oct-23 A4 FDT & SURVEY 26-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-6 BACKFILLING MMAH-CE- 7TH LAYER BACKFILLING LEVEL
CE-0506 CE-0450 25-Oct-23 E6 FDT & SURVEY 26-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-6
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 6TH LAYER BACKFILLING LEVEL
CE-0507 CE-0451 28-Oct-23 A4 FDT & SURVEY 29-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR 11TH LAYER
MMAH-CE-
CE-0508 CE-0452 28-Oct-23 12E-C01(AREA-C) C2 BACKFILLING AREA C 2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 29-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C2
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-5 BACKFILLING MMAH-CE- 1st LAYER BACKFILLING LEVEL AT
CE-0509 CE-0453 28-Oct-23 E5 FDT & SURVEY 29-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-5
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-11 BACKFILLING MMAH-CE- 1st LAYER BACKFILLING LEVEL AT
CE-0510 CE-0454 28-Oct-23 E 11 FDT & SURVEY 29-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-11
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 7TH LAYER BACKFILLING LEVEL
CE-0511 CE-0455 29-Oct-23 A4 FDT & SURVEY 30-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION


FOR FGL LAYER
MMAH-CE-
CE-0512 CE-0456 29-Oct-23 12E-C01(AREA-C) C2 BACKFILLING AREA C 2 002_2.1 REV.00 FDT & SURVEY BACKFILLING AT 12E- 30-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
C01(AREA-C) C2
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-5 BACKFILLING MMAH-CE- 2ND LAYER BACKFILLING LEVEL
CE-0513 CE-0457 29-Oct-23 E5 FDT & SURVEY 30-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-5
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-11 BACKFILLING MMAH-CE- 2ND LAYER BACKFILLING LEVEL
CE-0514 CE-0458 29-Oct-23 E 11 FDT & SURVEY 30-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-11
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 8TH LAYER BACKFILLING LEVEL
CE-0515 CE-0459 30-Oct-23 A4 FDT & SURVEY 31-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-1 BACKFILLING MMAH-CE- FGL LAYER BACKFILLING LEVEL
CE-0516 CE-0460 30-Oct-23 E1 FDT & SURVEY 31-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-1
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-1 BACKFILLING MMAH-CE- 9TH LAYER BACKFILLING LEVEL
CE-0517 CE-0461 31-Oct-23 A4 FDT & SURVEY 1-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 10TH LAYER BACKFILLING LEVEL
CE-0518 CE-0462 4-Nov-23 A4 FDT & SURVEY 5-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


(FGL) FINAL GRADE LEVEL AFTER
MMAH-CE-
CE-0519 CE-0463 4-Nov-23 12E C01 ( AREA - E) E-4 CUTTING AREA E4 002_2.1 REV.00 FDT & SURVEY CUTTING TO REDUCE LEVEL AT 5-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
12E C01 ( AREA - E) E-4 CUTTING
AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 11TH LAYER BACKFILLING LEVEL
CE-0520 CE-0464 5-Nov-23 A4 FDT & SURVEY 6-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- 12TH LAYER BACKFILLING LEVEL
CE-0521 CE-0465 6-Nov-23 A4 FDT & SURVEY 7-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-4
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 1ST LAYER BACKFILLING LEVEL AT
CE-0522 CE-0466 11-Nov-23 E 10 FDT & SURVEY 12-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 2nd LAYER BACKFILLING LEVEL
CE-0523 CE-0467 12-Nov-23 E 10 FDT & SURVEY 13-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 3rd LAYER BACKFILLING LEVEL AT
CE-0524 CE-0468 13-Nov-23 E 10 FDT & SURVEY 14-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 4th LAYER BACKFILLING LEVEL AT
CE-0525 CE-0469 14-Nov-23 E 10 FDT & SURVEY 15-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 5th LAYER BACKFILLING LEVEL AT
CE-0526 CE-0470 15-Nov-23 E 10 FDT & SURVEY 16-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 6th LAYER BACKFILLING LEVEL AT
CE-0527 CE-0471 16-Nov-23 E 10 FDT & SURVEY 18-Nov-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-10
BACKFILLING AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 7th LAYER BACKFILLING LEVEL AT
CE-0528 CE-0472 21-Nov-23
AREA
E 10 002_2.1 REV.00 FDT & SURVEY
12E C01 ( AREA - E) E-10
22-Nov-23 Eng M Obeidat ABDUL HANNAN REJECTED CIVIL
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 7th LAYER BACKFILLING LEVEL AT
CE-0528A CE-0472 23-Nov-23 E 10 FDT & SURVEY 25-Nov-23 Engr Mohammed Obeidat ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-10
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


2E C01 ( AREA - E) E-10 BACKFILLING MMAH-CE- 8th LAYER BACKFILLING LEVEL AT
CE-0529 CE-0473 26-Nov-23 E 10 FDT & SURVEY 27-Nov-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-10
BACKFILLING AREA

MATERIAL RECEIVING INSPECTION


(MIR) FOR CHAIN LINK FENCE
( GATES AND ACCESSORIES ) ,
12E-C01 MMAH LAYDOWN AND STORE MMAH-CE- (Single leaf; 1.50 m wide x 2.90 m
CE-0530 CE-0474 27-Nov-23 FENCE Inspection 28-Nov-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA 006_2.1 REV.00 height)(Double leaf; 6.00 m wide x
2.90 m height)(Double leaf; 8.00 m
wide x 2.90 m height) AT 12E-C01
LAYDOWN AND STORE AREA
MATERIAL RECEIVING INSPECTION
(MIR) FOR REINFORCEMENT
12E-C01 MMAH LAYDOWN AND STORE MMAH-CE- STEEL EPOXY COATED REBAR ,
CE-0531 CE-0475 27-Nov-23 REBAR Inspection 28-Nov-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA 006_2.1 REV.00 8MM STRGAIGHT AT 12E-C01
MMAH LAYDOWN AND STORE
AREA

MATERIAL RECEIVING INSPECTION


(MIR) FOR REINFORCEMENT
12E-C01 MMAH LAYDOWN AND STORE MMAH-CE- STEEL EPOXY COATED REBAR , 10
CE-0532 CE-0476 27-Nov-23 REBAR Inspection 28-Nov-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA 006_2.1 REV.00 MM STRGAIGHT AT 12E-C01
MMAH LAYDOWN AND STORE
AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-11 BACKFILLING MMAH-CE- 3rd LAYER BACKFILLING LEVEL AT
CE-0533 CE-0482 28-Nov-23 E 11 FDT & SURVEY 29-Nov-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-11
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-3 BACKFILLING MMAH-CE- 10th LAYER BACKFILLING LEVEL
CE-0534 CE-0483 28-Nov-23 A3 FDT & SURVEY 29-Nov-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - A) A-3
BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


12E C01 ( AREA - A) A-3 BACKFILLING MMAH-CE- SOIL CLASSIFICATION AT 12E-C01
CE-0535 CE-0477 21-Nov-23
AREA
A3 002_2.1 REV.00
SOIL CLASSIFICATION
(AREA-A) A3 BACKFILLING
22-Nov-23 Eng M Obeidat ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


12E C01 ( AREA - A) A-3 BACKFILLING MMAH-CE- SOIL CLASSIFICATION AT 12E-C01
CE-0535 CE-0478 21-Nov-23
AREA
A3 002_2.1 REV.00
SOIL CLASSIFICATION
(AREA-A) A3 BACKFILLING
22-Nov-23 Eng M Obeidat ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


12E C01 ( AREA - A) A-3 BACKFILLING MMAH-CE- SOIL CLASSIFICATION AT 12E-C01
CE-0536 CE-0479 2-Dec-23
AREA
A3 002_2.1 REV.00
SOIL CLASSIFICATION
(AREA-A) A3 BACKFILLING
3-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


12E C01 ( AREA - A) A-3 BACKFILLING MMAH-CE- SOIL CLASSIFICATION AT 12E-C01
CE-0537 CE-0480 2-Dec-23
AREA
A3 002_2.1 REV.00
SOIL CLASSIFICATION
(AREA-A) A3 BACKFILLING
3-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-5 BACKFILLING MMAH-CE- 3rd LAYER BACKFILLING LEVEL AT
CE-0538 CE-0481 2-Dec-23
AREA
E5 002_2.1 REV.00 FDT & SURVEY
12E C01 ( AREA - E) E-5
3-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-11 BACKFILLING MMAH-CE- 4th LAYER BACKFILLING LEVEL AT
CE-0539 CE-0484 3-Dec-23
AREA
E 11 002_2.1 REV.00 FDT & SURVEY
12E C01 ( AREA - E) E-11
4-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - E) E-5 BACKFILLING MMAH-CE- 4th LAYER BACKFILLING LEVEL AT
CE-0540 CE-0485 3-Dec-23
AREA
E5 002_2.1 REV.00 FDT & SURVEY
12E C01 ( AREA - E) E-5
4-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E C01 ( AREA - A) A-3 BACKFILLING MMAH-CE- 11th LAYER BACKFILLING LEVEL
CE-0541 CE-0486 4-Dec-23
AREA
A3 002_2.1 REV.00 FDT & SURVEY
AT 12E C01 ( AREA - A) A-3
5-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - E) E-5 BACKFILLING MMAH-CE-
CE-0542 CE-0487 26-Dec-23
AREA
E5 002_2.1 REV.00 FDT & SURVEY FGL LAYER AT 12E-C01 ( AREA - E) 27-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
E-5 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - C ) C-5 BACKFILLING MMAH-CE-
CE-0543 CE-0488 9-Dec-23
AREA
C5 002_2.1 REV.00 FDT & SURVEY 5TH LAYER AT 12E-C01 ( AREA - C) 10-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
C-5 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE-
CE-0544 CE-0489 9-Dec-23 ( AREA - A) A-3 BACKFILLING AREA A3 002_2.1 REV.00 FDT & SURVEY 12TH LAYER AT 12E-C01 ( AREA - 10-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
A)A-3 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0545 CE-0490 9-Dec-23 12E-C01 ( BORROW PIT ) CUTTING AREA BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
10-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


12E-C01 ( AREA - C)C-5 BACKFILLING MMAH-CE-
CE-0546 CE-0491 9-Dec-23
AREA
C5 002_2.1 REV.00
SOIL CLASSIFICATION SOIL CLASSIFICATION AT 12E-C01 ( 10-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA - C)C-5 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - C ) C-5 BACKFILLING MMAH-CE- 6TH LAYER BACKFILLING AT 12E-
CE-0547 CE-0492 11-Dec-23
AREA
C5 002_2.1 REV.00 FDT & SURVEY
C01 ( AREA - C) C-5 BACKFILLING
12-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE- 13TH LAYER BACKFILLING AT 12E-
CE-0548 CE-0493 11-Dec-23 ( AREA - A) A-3 BACKFILLING AREA A3 002_2.1 REV.00 FDT & SURVEY
C01 ( AREA - A)A-3 BACKFILLING
12-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA
FDT & SURVEY INSPECTION FOR
12E-C01 ( AREA - C ) C-5 BACKFILLING MMAH-CE- 7TH LAYER BACKFILLING AT 12E-
CE-0549 CE-0494 12-Dec-23
AREA
C5 002_2.1 REV.00 FDT & SURVEY
C01 ( AREA - C) C-5 BACKFILLING
13-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AREA

FDT & SURVEY INSPECTION FOR


MMAH-CE-
CE-0550 CE-0495 12-Dec-23 ( AREA - A) A-3 BACKFILLING AREA A3 002_2.1 REV.00 FDT & SURVEY 14TH LAYER AT 12E-C01 ( AREA - 13-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
A)A-3 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0551 CE-0496 13-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
14-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0552 CE-0497 13-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
14-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0553 CE-0498 13-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
14-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - C) C-5 BACKFILLING MMAH-CE-
CE-0554 CE-0499 13-Dec-23
AREA
C5 002_2.1 REV.00 FDT & SURVEY 8TH LAYER AT 12E-C01 ( AREA - C) 14-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
C-5 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - E)E-2 BACKFILLING MMAH-CE- FINISH GRADE LEVEL (FGL- FINAL
CE-0555 CE-0500 13-Dec-23
AREA
E2 002_2.1 REV.00 FDT & SURVEY
LAYER) LAYER AT 12E-C01 ( AREA -
14-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
E)E-2 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - E)E-2 BACKFILLING MMAH-CE-
CE-0556 CE-0501 17-Dec-23
AREA
E2 002_2.1 REV.00 FDT & SURVEY 9TH LAYER AT 12E-C01 ( AREA - C) 18-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
C-5 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0557 CE-0502 18-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
19-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0558 CE-0503 18-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
19-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0559 CE-0504 18-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
19-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - C) C-5 BACKFILLING MMAH-CE-
CE-0560 CE-0505 19-Dec-23
AREA
C5 002_2.1 REV.00 FDT & SURVEY 10TH LAYER AT 12E-C01 ( AREA - 20-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
C) C-5 BACKFILLING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0561 CE-0506 23-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
24-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0562 CE-0507 23-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
24-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0563 CE-0508 23-Dec-23 BORROW PIT BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
24-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

FDT & SURVEY INSPECTION FOR


FINISHED GRADE LEVEL (FGL)
MMAH-CE-
CE-0564 CE-0509 24-Dec-23 12E-C01 ( AREA - E) E-3 CUTTING AREA E3 002_2.1 REV.00 FDT & SURVEY AFTER CUTTING TO REDUCE LEVEL 25-Dec-23 Engr Turki ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA - E) E-3
CUTTING AREA

MATERIAL SOIL SAMPLING FOR


12E-C01 ( BORROW PIT ) CUTTING AREA MMAH-CE- IMPORTED FILL SOIL
CE-0565 CE-0510 2-Jan-24 BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
3-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


12E-C01 ( BORROW PIT ) CUTTING AREA MMAH-CE- IMPORTED FILL SOIL
CE-0566 CE-0511 2-Jan-24 BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
3-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


12E-C01 ( BORROW PIT ) CUTTING AREA MMAH-CE- IMPORTED FILL SOIL
CE-0567 CE-0512 2-Jan-24 BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
3-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA - A) A-4 BACKFILLING MMAH-CE- FINAL GRADE LAYER LEVEL AT
CE-0568 CE-0513 6-Jan-24
AREA
A4 002_2.1 REV.00 FDT & SURVEY
12E-C01 ( AREA - A) A-4
7-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


FINISHED GRADE LEVEL AFTER
12E-C01 ( AREA -E)E-11 MMAH-CE-
CE-0569 CE-0514 9-Jan-24
CUTTING AREA
E 11 002_2.1 REV.00 FDT & SURVEY CUTTING TO REDUCE LEVEL AT 10-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
12E-C01 ( AREA -E)E-11 CUTTING
AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0570 CE-0515 9-Jan-24 12E-C01 ( BORROW PIT ) CUTTING AREA BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
10-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


MMAH-CE- IMPORTED FILL SOIL
CE-0571 CE-0516 9-Jan-24 12E-C01 ( BORROW PIT ) CUTTING AREA BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
10-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA
MATERIAL SOIL SAMPLING FOR
MMAH-CE- IMPORTED FILL SOIL
CE-0572 CE-0517 9-Jan-24 12E-C01 ( BORROW PIT ) CUTTING AREA BORROW PIT 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01
10-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -A)A-1 BACKFILLING MMAH-CE- FINAL GRADE LEVEL (FGL)
CE-0573 CE-0518 10-Jan-24
AREA
A1 002_2.1 REV.00 FDT & SURVEY
BACKFILLING LAYER AT 12E-C01
11-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( AREA -A)A-1 BACKFILLING AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -A)A-3 BACKFILLING MMAH-CE- FINAL GRADE LEVEL (FGL)
CE-0574 CE-0519 10-Jan-24
AREA
A3 002_2.1 REV.00 FDT & SURVEY
BACKFILLING LAYER AT 12E-C01
11-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
( AREA -A)A-3 BACKFILLING AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0575 CE-0520 11-Jan-24
YARD AREA AREA
& 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
14-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0576 CE-0521 11-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 15-Jan-24 Engr Turki ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-10 BACKFILLING MMAH-CE- 1ST LAYER BACKFILLING AT 12E-
CE-0577 CE-0522 11-Jan-24 AREA G 10 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-10 BACKFILLING 14-Jan-24 ABDUL HANNAN Accepted CIVIL
AREA

CONSTRUCTION MOCK UP FOR


CHAIN LINK FENCE POST
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD MMAH-CE- FOUNDATIONS FORMWORK ,
CE-0578 VISUAL 13-Jan-24 YARD AREA AREA 002_2.1 REV.00 MOCK-UP CONCRETE POURING AND
14-Jan-24 ENGR TURKI ABDUL HANNAN Accepted CIVIL
TESTING AT 12E-C01 PRECAST
YARD

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -C)C-5 BACKFILLING MMAH-CE- FINAL GRADE LEVEL (FGL) LAYER
CE-0579 CE-0523 14-Jan-24
AREA
C5 002_2.1 REV.00 FDT & SURVEY
BACKFILLING AT 12E-C01 ( AREA -
15-Jan-24 ENGR TURKI ABDUL HANNAN Accepted CIVIL
C)C-5 BACKFILLING AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0580 CE-0524 15-Jan-24
YARD AREA AREA
& 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
16-Jan-24 ENGR TURKI ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0581 CE-0525 15-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 17-Jan-24 ENGR TURKI ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-10 BACKFILLING MMAH-CE- 2ND LAYER BACKFILLING AT 12E-
CE-0582 CE-0526 15-Jan-24 AREA G 10 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-10 BACKFILLING 17-Jan-24 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0583 CE-0527 16-Jan-24
YARD AREA AREA
& 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
17-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0584 CE-0528 17-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 18-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-9 BACKFILLING MMAH-CE- 1ST LAYER BACKFILLING AT 12E-
CE-0585 CE-0529 17-Jan-24 AREA G9 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-9 BACKFILLING 18-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0586 CE-0530 17-Jan-24
YARD AREA AREA
& 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
18-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0587 CE-0531 17-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 21-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

SURVEY INSPECTION FOR


SETTING OUT OF LOCATIONS,
TRENCH AND ELEVATION PRIOR
Station : 8+130 TO EXCAVATION FOR TRENCH
Station : 8+130 to 9+353 & 0+000 to MMAH-CE-
CE-0588 VISUAL INSP 18-Jan-24 to 9+353 & 002_2.1 FDT & SURVEY 20-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
0+035
0+000 to 0+035
REV.00 FOR CHAIN LINK FENCE
CONCRETE SILL GRADE BEAM
STATION: 8+130 TO 9+353 &
0+000 TO 0+035

SURVEY VERIFICATION &


STATION: EXCAVATION INSPECTION OF
8+130 TO MMAH-CE- EXCAVATION TRENCH FOR CONCRETE SILL
CE-0589 VISUAL INSP 18-Jan-24 Stations 9+120 to 9+353 006_3.2 & 3.3 20-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
9+353 & 0+000 REV.00 INSPECTION GRADE BEAM PRIOR TO FDTS
TO 0+035 FOR LEAN CONCRETE POURING
STATIONS 9+120 TO 9+353
INSPECTION FOR FORMWORK`S
OF CHAIN LINK FENCE POST
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD MMAH-CE- FOUNDATIONS CONCRETE PRIOR
CE-0590 CE-0532 18-Jan-24 YARD ARE AREA 002_2.1 REV.00
SOIL CLASSIFICATION
TO CONCRETE POURING AT 12E- 21-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-10 MMAH-CE- 3RD LAYER BACKFILLING AT 12E-
CE-0591 CE-0533 18-Jan-24 BACKFILLING AREA G 10 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-10 BACKFILLING 21-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

MATERIAL SOIL SAMPLING FOR


SOIL CLASSIFICATION AT
STATION: EXCAVATED MATERAIL FROM
STATION: 8+130 TO 9+353 & 0+000 TO 8+130 TO MMAH-CE- TRENCH FOR CHAIN LINK FENCE
CE-0592 CE-0534 20-Jan-24
0+035 9+353 & 0+000 002_2.1 REV.00
SOIL CLASSIFICATION
CONCRETE SILL GRADE BEAM AND
21-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
TO 0+035 POST FOUNDATIONS STATION:
8+130 TO 9+353 & 0+000 TO
0+035

MATERIAL SOIL SAMPLING FOR


SOIL CLASSIFICATION AT
STATION: EXCAVATED MATERAIL FROM
STATION: 8+130 TO 9+353 & 0+000 TO 8+130 TO MMAH-CE- TRENCH FOR CHAIN LINK FENCE
CE-0593 CE-0535 20-Jan-24
0+035 9+353 & 0+000 002_2.1 REV.00
SOIL CLASSIFICATION
CONCRETE SILL GRADE BEAM AND
21-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
TO 0+035 POST FOUNDATIONS STATION:
8+130 TO 9+353 & 0+000 TO
0+035

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-9 BACKFILLING MMAH-CE- 2ND LAYER BACKFILLING AT 12E-
CE-0594 CE-0536 21-Jan-24 AREA G9 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-9 BACKFILLING 22-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0595 CE-0537 21-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 22-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0596 CE-0538 21-Jan-24
YARD AREA AREA
& 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
22-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-10 BACKFILLING MMAH-CE- 4TH LAYER BACKFILLING AT 12E-
CE-0597 CE-0539 22-Jan-24 AREA G 10 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-10 BACKFILLING 23-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

FDT & SURVEY INSPECTION


FOR FINAL GRADE LEVEL
MMAH-CE-
CE-0598A CE-0540 4-Feb-24 12E-C01 ( AREA-E) E7 BACKFILLING AREA E7 002_2.1 REV.00 FDT & SURVEY (FGL) LAYER BACKFILLING 6-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA-E) E7
BACKFILLING AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0599 CE-0541 22-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 24-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0600 CE-0542 22-Jan-24
YARD AREA AREA
& 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
24-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-9 BACKFILLING MMAH-CE- 3RD LAYER BACKFILLING AT 12E-
CE-0601 CE-0543 23-Jan-24 AREA G9 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-9 BACKFILLING 24-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-9 BACKFILLING MMAH-CE- 5th LAYER BACKFILLING AT 12E-
CE-0602 CE-0544 24-Jan-24 AREA G9 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-10 BACKFILLING 25-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0603 CE-0545 25-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 29-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD MMAH-CE- FOUNDATIONS CONCRETE PRIOR
CE-0604 VISUAL INSP 25-Jan-24
YARD AREA AREA
006_3.5 & 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
29-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

SURVEY VERIFICATION &


EXCAVATION INSPECTION OF
STATIONS MMAH-CE- EXCAVATION TRENCH FOR CONCRETE SILL
CE-0605 VISUAL 27-Jan-24 STATIONS 8+580 TO 8+670 8+580 TO 006_3.2 & 3.3 28-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
8+670 REV.00 INSPECTION GRADE BEAM PRIOR TO FDTS
FOR LEAN CONCRETE POURING
STATIONS 8+580 TO 8+670

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-9 BACKFILLING MMAH-CE- 4TH LAYER BACKFILLING AT 12E-
CE-0606 CE-0546 27-Jan-24
AREA
G9 002_2.1 REV.00 FDT & SURVEY
C01 ( AREA -G)G-9 BACKFILLING
28-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-10 BACKFILLING MMAH-CE- 6TH LAYER BACKFILLING AT 12E-
CE-0607 CE-0547 28-Jan-24 AREA G 10 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-10 BACKFILLING 29-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA
TESTING & SAMPLING FOR
MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0608 CE-0548 29-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 31-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD MMAH-CE- FOUNDATIONS CONCRETE PRIOR
CE-0609 VISUAL INSP 29-Jan-24
YARD AREA AREA
006_3.5 & 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
8-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-9 BACKFILLING MMAH-CE- 5TH LAYER BACKFILLING AT 12E-
CE-0610 CE-0550 29-Jan-24 AREA G9 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-9 BACKFILLING 30-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

FDT & SURVEY INSPECTION


FOR FINAL GRADE LEVEL
MMAH-CE-
CE-0611 CE-0551 29-Jan-24 12E-C01 ( AREA-E) E6 BACKFILLING AREA E6 002_2.1 REV.00 FDT & SURVEY (FGL) LAYER BACKFILLING 30-Jan-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AT 12E-C01 ( AREA-E) E6
BACKFILLING AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
12E-C01 LAYDOWN CONCRETE PRECAST PRECAST YARD 006_3.5
CE-0612 CE-0549 31-Jan-24 YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 8-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -G)G-9 BACKFILLING MMAH-CE- 6TH LAYER BACKFILLING AT 12E-
CE-0613 CE-0552 31-Jan-24 AREA G9 002_2.1 REV.00 FDT & SURVEY C01 ( AREA -G)G-9 BACKFILLING 1-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
AREA

SURVEY VERIFICATION &


EXCAVATION INSPECTION OF
STATIONS MMAH-CE- EXCAVATION TRENCH FOR CHAIN LINK FENCE
CE-0614 VISUAL INSP 4-Feb-24 STATIONS 9+120 TO 9+353 9+120 TO 006_3.2 & 3.3
INSPECTION POST FOUNDATIONS PRIOR TO 6-Feb-24 ENGR OBEIDAT ABDUL HANNAN Rejected CIVIL
9+353 REV.00 FDTs FOR LEAN CONCRETE
POURING STATIONS 9+120 TO
9+353

SURVEY VERIFICATION &


EXCAVATION INSPECTION OF
STATIONS MMAH-CE- EXCAVATION TRENCH FOR CHAIN LINK FENCE
CE-0614A VISUAL INSP 4-Feb-24 STATIONS 9+120 TO 9+353 9+120 TO 006_3.2 & 3.3 POST FOUNDATIONS PRIOR TO 7-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
9+353 REV.00 INSPECTION FDTs FOR LEAN CONCRETE
POURING STATIONS 9+120 TO
9+353

MATERIAL RECEIVING
INSPECTION (MIR) FOR CHAIN
LINK FENCE CONCRETE WORKS
PRECAST YARD
CE-0615 CE-0554 4-Feb-24 12E-CO1 STORE LAYDOWN AREA AREA OF COAL TAR EPOXY COATING ( 6-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
NITOCATE ET 402 : 3/3 Sets ) AT
12E-CO1 STORE LAYDOWN
AREA

SURFACE PREPRATION OF CHAIN


LINK FENCE POST FOUNDATIONS
( 70 INTERMEDIATE POST
PRECAST YARD FOUNDATION & 8 STARINING
CE-0616 CE-0555 4-Feb-24 12E-C01 PRECAST YARD
AREA POST FOUNDATIONS ) PRIOR TO
6-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
APPLICATION OF COAL TAR EPOXY
COATING AT 12E-C01 PRECAST
YARD

CONSTRUCTION MOCK UP FOR


CHAIN LINK FENCE POST
PRECAST YARD
CE-0617 VISUAL 4-Feb-24 12E-C01 PRECAST YARD MOCK UP FOUNDATIONS COAL TAR EPOXY
AREA
COATING AT 12E-C01 PRECAST
YARD AREA

MATERIAL SOIL SAMPLING FOR


PRECAST YARD MMAH-CE- IMPORTED FILL SOIL
CE-0618 CE-0553 6-Feb-24 12E-C01 PRECAST YARD AREA 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01 7-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

MATERIAL SOIL SAMPLING FOR


PRECAST YARD MMAH-CE- IMPORTED FILL SOIL
CE-0619 CE-0556 6-Feb-24 12E-C01 PRECAST YARD AREA 002_2.1 REV.00
SOIL CLASSIFICATION
CLASSIFICATION AT 12E-C01 7-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
( BORROW PIT ) CUTTING AREA

VISUAL & DFT TESTING


INSPECTION FOR 1ST COAT,
APPLICATION OF COAL TAR EPOXY
PRECAST YARD
CE-0620 CE-0557 8-Feb-24 12E-C01 PRECAST YARD AREA COATING OF ( 70 INTERMEDIATE 10-Feb-24
AREA
POST FOUNDATION & 8
STARINING POST FOUNDATIONS )
AT 12E-C01 PRECAST YARD AREA

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0621 VISUAL 8-Feb-24 12E-C01 PRECAST YARD AREA
AREA
& 3.6 FORMWORK`S
TO CONCRETE POURING AT 12E-
10-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00
C01 LAYDOWN CONCRETE
PRECAST YARD AREA

TESTING & SAMPLING FOR


MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
PRECAST YARD 006_3.5
CE-0622 CE-0558 8-Feb-24 12E-C01 PRECAST YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 10-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

SURFACE PREPRATION OF CHAIN


LINK FENCE POST FOUNDATIONS (
PRECAST YARD
CE-0623 CE-0559 8-Feb-24 12E-C01 PRECAST YARD AREA ) PRIOR TO APPLICATION OF COAL 10-Feb-24
AREA
TAR EPOXY COATING AT 12E-C01
PRECAST YARD

INSPECTION FOR FORMWORK`S


OF CHAIN LINK FENCE POST
MMAH-CE-
PRECAST YARD 006_3.5 FOUNDATIONS CONCRETE PRIOR
CE-0624 VISUAL 10-Feb-24 12E-C01 PRECAST YARD AREA & 3.6 FORMWORK`S 11-Feb-24
AREA REV.00 TO CONCRETE POURING AT 12E-
C01 LAYDOWN CONCRETE
PRECAST YARD AREA
TESTING & SAMPLING FOR
MMAH-CE- CONCRETE CONCRETE POURING OF CHAIN
PRECAST YARD 006_3.5
CE-0625 CE-0560 10-Feb-24 12E-C01 PRECAST YARD AREA AREA
& 3.6 POURING & LINK FENCE POST FOUNDATIONS 11-Feb-24
REV.00 TESTING AT 12E-C01 LAYDOWN CONCRETE
PRECAST YARD AREA

MATERIAL SOIL SAMPLING FOR


SOIL CLASSIFICATION AT
STATION: EXCAVATED MATERAIL FROM
MMAH-CE-
CE-0626 CE-0561 10-Feb-24 STATION: 8+415 TO 8+580 8+415 TO 002_2.1 REV.00
SOIL CLASSIFICATION TRENCH FOR CHAIN LINK FENCE 11-Feb-24
8+580 CONCRETE SILL GRADE BEAM AND
POST FOUNDATIONS STATION:
8+415 TO 8+580

MATERIAL SOIL SAMPLING FOR


SOIL CLASSIFICATION AT
STATION: EXCAVATED MATERAIL FROM
MMAH-CE-
CE-0627 CE-0562 10-Feb-24 STATION: 8+415 TO 8+580 8+415 TO 002_2.1 REV.00
SOIL CLASSIFICATION TRENCH FOR CHAIN LINK FENCE 11-Feb-24
8+580 CONCRETE SILL GRADE BEAM AND
POST FOUNDATIONS STATION:
8+415 TO 8+580

FDT & SURVEY INSPECTION FOR


12E-C01 ( AREA -E)E-10 BACKFILLING MMAH-CE- FINAL GRADE LAYER LEVEL (FGL)
CE-0628 CE-0563 10-Feb-24 E 10 FDT & SURVEY 11-Feb-24
AREA 002_2.1 REV.00 LAYER BACKFILLING AT 12E-C01
( AREA -E)E-10 BACKFILLING AREA