12e-C01 Rfis & Hprs Log Updated 28-Jan-2024
12e-C01 Rfis & Hprs Log Updated 28-Jan-2024
12e-C01 Rfis & Hprs Log Updated 28-Jan-2024
: 12E-C01
PROJECT NAME: SITE PREPARATION FOR INDUSTRIAL WASTE MANAGEMENT FACILITY IN RIC (IWMF)
PROJECT LOCATION: RAS ALKHAIR INDUSTRIAL CITY
Updated :- 28-JAN -2024
VISUAL INSPECTION
CE-0383 WITNESS 10-Jul-23 12E-C01 ( AREA - G) G-10 G 10 MMAH-CE- FOR CLEARING &
002_1.4 REV.00 VISUAL INSPECTION 11-Jul-23 ABDUL HANNAN Accepted CIVIL
ENGR-TURKI
GURBBING AT 12E-C01 (
AREA - G) G-10
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0480 CE-0424 16-Sep-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 17-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - C) C-5 BACKFILLING MMAH-CE- 2nd LAYER BACKFILLING LEVEL
CE-0481 CE-0425 18-Sep-23 E6 FDT & SURVEY 19-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 AT 12E C01 ( AREA - E) E-6
BACKFILLING AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0482 CE-0426 19-Sep-23
12E C01 ( AREA - F) F-8
FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 20-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
BACKFILLING AREA 006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
FDT & SURVEY INSPECTION FOR
12E C01 ( AREA - E) E-6 BACKFILLING MMAH-CE- 3RD LAYER BACKFILLING LEVEL AT
CE-0483 CE-0427 20-Sep-23 E6 FDT & SURVEY 21-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
AREA 002_2.1 REV.00 12E C01 ( AREA - E) E-6
BACKFILLING AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0489 CE-0433 26-Sep-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 27-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0490 CE-0434 28-Sep-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 30-Sep-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL RECEVING
INSPECTION (MIR) FOR
CE-0491 CE-0435 1-Oct-23 12E-C01 MMAH LAYDOWN STORE AREA FENCE MMAH-CE-
Inspection
12E-C01 PROJECT CHAIN 2-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
006_2.1 REV.00 LINK FENCE AT 12E-C01
MMAH LAYDOWN STORE
AREA
MATERIAL SOIL SAMPLING
CE-0492 CE-0436 4-Oct-23 12E-C01(AREA-E)E1 CUTTING AREA E1 MMAH-CE- SOIL CLASSIFICATION
FOR SOIL CLASSIFICATION 5-Oct-23 ENGR TURKI ABDUL HANNAN Accepted CIVIL
002_2.1 REV.00 AT 12E-C01(AREA-E)E1
CUTTING AREA
MATERIAL RECEIVING
INSPECTION (MIR) FOR CHAIN
LINK FENCE CONCRETE WORKS
PRECAST YARD
CE-0615 CE-0554 4-Feb-24 12E-CO1 STORE LAYDOWN AREA AREA OF COAL TAR EPOXY COATING ( 6-Feb-24 ENGR OBEIDAT ABDUL HANNAN Accepted CIVIL
NITOCATE ET 402 : 3/3 Sets ) AT
12E-CO1 STORE LAYDOWN
AREA