Electrical BOQ

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SOR/NO

Sr. No. Equipment Type Item Description UOM Qty


N SOR
1 Solar (10.2KW)
1.2 Installation of Set of Module FIM No 4
1.3 Installation of Earthing of Each set of Modue FIM No 4
Supply & Installation of of SPV to CCU Cable- (Common Cable for all 4
1.4 Non FIM m 44
strings), 2C X4Sqmm Cu Ar. Cable -4 Nos
1.5 Installation of Solar Earthing (Chemical) FIM No 1
1.6 Supply & Installation SPV structure grounding ( for 6 legs) GI Strip 25mmx3mm Non FIM m 12
2 Hybrid CCU
2.1 Installation of Rack ETSI FIM No 1
2.2 Installation of CCU Rack Earthing FIM No 1
2.3 Supply & Installation of CCU Rack Earthing Cable., 1C X 10 Sqmm Cu flex Non FIM m 2
Supply & Installation of CCU to battery bank Cables 2C X30 Sqmm Cu flex (Red &
2.4 Non FIM m 1.5
BK)
Supply & Installation of ACDB to CCU Cable 2CX 10sqmm Cu Ar Cable (Red &
2.5 Non FIM m 3
Black)
2.6 Supply & Installation of LSPU Box grounding cable 1C X 10 Sqmm Cu flex Non FIM m 2
2.7 Out put MCB Installation of 63A FIM No 3
2.8 Installation of 16A FIM No 2
2.9 Installation of 6A FIM No 1
3 Battery Bank 800AH FIM
3.1 Installation of Battery Rack ETSI FIM No 1
3.2 Battery Rack Earthing Non FIM No 1
3.3 Supply & Installation of Battery Rack Earthing Cables 1C X 10 Sqmm Cu flex Non FIM m 1
4 DG 12.5KVA Installation of DG Earthing FIM No 1
4.1 Supply & Installation of DG Earthing Cable 1C X 10 Sqmm Cu flex Non FIM m 3
Supply & Installation of DG to ACDB cable 2CX 10sqmm Cu Ar Cable (Red &
4.2 Non FIM m 3
Black)
5 SMPS SMPS FIM No 1
Installation of SMPS Rack ETSI FIM No 1
Supply & Installation of SMPS Rack Ground cable 1C X 10 Sqmm Cu flex Non FIM m 2
Supply & Installation of SMPS to Battery Cable 2C X30 Sqmm Cu flex (Red &
Non FIM m 1.5
BK)
6 Electric Meter
Supply & Installation of Electric meter to ACDB 1C X 16 Sqmm Alu flex Non FIM m 1
Supply & Installation of Meter Earthing 1C X 10 Sqmm Cu flex Non FIM m 2
7 ACDB Supply & Installation of ACDB (3x32A) 3x32A MCB Non FIM No 1
8 Aviation Light Supply & Installation of Aviation lamp (48 V DC) Non FIM
Supply & Installation of Aviation Light Wire 2cx 1sqmm Cu Non FIM m 60
9 Lightning Arrestor Non FIM No 1
Supply & Installation of LA Earthing GI wire 8 mm Non FIM m 50
10 Camera PTZ
Installation of 48 to 12 V Convertor FIM No 1
Supply & Installation of Convetor to CCU rack Cable 2cx 1sqmm Cu Non FIM m 60
11 Fire Alarm FIM
Supply & Installation of Fire Panel in CCU Rack Cable 2cx 1sqmm Cu Non FIM m 30
Installation of Hooter FIM m 1
12 EMF Board (Signage Board) Supply & Installation of EMF Signage Board Non FIM No 3
13 TGB (Tower Ground Bar) Supply & Installation of TGB with 6 Holes Cu with Mounting arrangement Non FIM No 1
14 OGB (Out door Ground Bar) Supply & Installation of OGB with 8 Hole CU with Mounting arrangement Non FIM No 1