QUALITY CONTROL INSPECTION CHECKLIST

I MMC ENGINEERING SDN BHD


Project: CONSTRUCTION WORKS ON THE PROJECT FOR ASIA DIGITAL Doc. no.
ENGINEERING (‘ADE’) MRO HANGAR AND NEW TAXIWAY AT PT39, LAPANGAN Rev. 00
TERBANG ANTARABANGSA KUALA LUMPUR (KLIA) Date

Page 1 of 2
Construction Process Fire Rated Door Installation Works

Location: Standard I Specifications Reference (s) RFI No.

Drawing (IFC/Shop Drawing) Reference (s) MS/ITP

Item Description NSC SC PDP


Yes No Yes No Yes No
1 Survey and Setting Out
a) Location □ □ □ □ □ □
b) Level □ □ □ □ □ □
2 Prior Work Start
a) Shop drawing have been approved □ □ □ □ □ □
b) All material has been aooroved and inspected accordinq to MSA □ □ □ □ □ □
c) Method statement have been approved □ □ □ □ □ □
3 Installation
a) Position and level of door frame to be mark on site □ □ □ □ □ □
b) Check opening, squareness and any defect door before
installation □ □ □ □ □ □
c) Alignment/level with walls □ □ □ □ □ □
d) Fame anchored to the wall □ □ □ □ □ □
e) Door Leaf installation □ □ □ □ □ □
f) Sealant aoolied to the frame parameter (if required) □ □ □ □ □ □
4 Completion
a) Neat joint and consistent gap between frame and leaf □ □ □ □ □ □
b) Frame to be plumb, square and no hollowness □ □ □ □ □ □
c) Leaf and frame corners maintained at right angles □ □ □ □ □ □
d) No stain marks and any visible damage □ □ □ □ □ □
5 Testing
a) Verticality test passed □ □ □ □ □ □
6 Finishing
a) Workmanship to specification □ □ □ □ □ □
7 Housekeeping □ □ □ □ □ □
Reason for Failure/Re-inspection

----·--·-- ··-· · ··-·-·· · ·-·-·-··-·'"···--·- ····--·- . _. _____ - - - -----------------· • ·--·- . -·-- -· . -- - . - ----···· · ---·-·- ·····--

-- - -----

- ..... . . ·-·- .. ·- -·-· • ---•--• --··- ·--· ·· --·-·-·-···· - -···· · · ··-·-·-··· ···-·-··• -•.s••···- ····· · · ······- ····-·-- --·· -·-·· ·· . ·---- ·- - - - - -··

· · · ··- ·-·····-··-., -- - ---·· - · ·- ---···- ·-·-·- ·· ·-·-·-·· · ·· ·-·-·· ··· ··-· ... -- -·-·-··-· ··--·-- ··· ····-·-· --·- ........ ...... .. . . ····-·- .. .. ...,.. _ ·· · · ·-····-······

D ALLOWED to proceed with the next stage of work D NOT ALLOWED to proceed with the next stage of work
QUALITY CONTROL INSPECTION CHECKLIST

I MMC ENGINEERING SDN BHD


Project: Doc. no.
Project: CONSTRUCTION WORKS ON THE PROJECT FOR ASIA DIGITAL Rev. 00
ENGINEERING (‘ADE’) MRO HANGAR AND NEW TAXIWAY AT PT39, LAPANGAN Date
TERBANG ANTARABANGSA KUALA LUMPUR (KLIA)
Construction Process : Fire Rated Door Installation Works Page 2 of 2

YES NO
Non-Conformance Report Raised □ □ NCR no.:

Name/Signature of
Designation: Date:
Subcontractor
Subcontractor Representative

Name/Signature of
Designation: Date:
Main Contractor
MMCERepresentative

Name/Signature of
Designation: Date:
Project Delivery Partner
Consultant Representative
Please ( ✓ ) off where appropnate