SYNOPSIS
Young, energetic and performance-driven Civil Engineer with excellent academic credentials
Gained vast knowledge during academics and while executing projects
Well-versed in civil engineering concepts, techniques, and safety standards
In-depth knowledge of handling civil construction projects
Ability to interpret and analyze highly technical drawings and specifications
Proficient in communicating effectively with sound knowledge of computer applications
Quick Learner, with an ability to easily grasp things and put into application new ideas, concepts, methods
and technologies
Ability to build new territories and expand opportunities towards the achievement of stated targets
Highly ambitious to achieve organizational and as well as personal goals
CORE STRENGTHS
Civil Engineering Problem Solving Skills
Site Management Commitment towards work
Project Management Sincerity and Self-Confidence
Environmental Health & Safety Good team player
EDUCATIONAL CREDENTIALS
B.Tech. (Civil Engineering) from Al-Falah University, Faridabad in 2018with 72.1%
Diploma in Information Technologyfrom Ambedkar Polytechnic, Delhi in 2015with 67.39%
COMPUTER PROFICIENCY
AutoCAD Java
C MS Office (Word,Power Point)
C++ Ms Excel- Preparing BBS, BOQ and Billing
CERTIFICATIONS
C & C++ Training Certificate offered by The Spoken Tutorial Projects, IIT Bombay funded by National
Mission on Education through ICT, MHRD, Govt of India
JAVA Certification by CDAS Sec 2 Rohini, Delhi
EXTRA ACTIVITY
Certificate of Appreciation from SAUDI ARAMCO for Safe Working Standards at Haradh & Hawiyah Field
Gas Compression Project KSA
Certificate of Appreciation from DOOSAN Enerbility Co. Ltd. for execution of job with efforts and
dedication to complete assign task with precision and sincerity at Shuaibah 3 Independent Water Project
KSA.
Certificate of Excellence from SFEC for Safe Working Standards at Shuaibah 3 Independent Water
Project KSA.
Attend Blood Donation Camp in Rohini Delhi.
Achieve 3rd position in drawing competition during academic period.
Certificate of Appreciation from Future Maker Institute, Delhi.
Get 95% Attendance award each semester during graduation.
INDUSTRIAL TRAININGS
Attended 4 Months industrial training at on going project site ITPO Pragati Maidan Delhi, From 2nd Jan,
2018 to 30th April, 2018 from RPE Consulting Pvt. Ltd.
Worked as a Trainee Engineer for Environmental Health & Safety from 21st Century Engicon Pvt. Ltd. In
2016
13 Weeks Project Based Industrial training on PHP from 5th Jan, 2015 at CDAS Consultancy Pvt. Ltd.
Attended 40 Days training at DMRC as Trainee Engineer to Check Safety Related Issues
Attended L&T internship during vacation
Haradh Hawiyah Gas Compression Project involved improving and sustaining gas production from Haradh and
Hawiyah field by reducing choke pressure at the wellhead. Hawiyah Gas plant Expension Project will provide
additional gas processing facilities to process 1070 Million Standard Cubic Feet per Day (MMSCFD) of raw sweet
gas, installing a pipeline network to allow free flowing 290 MMSCFD from Haradh field to Hawiyah Gas Plant.
My major role is to execute different construction activity at site (Manhole, Catchbasin, Valve Box, Cleanout,
Precast Slab, Beam, Column, Guard Post etc Installation) and Cast in Situ of different structures like:-
Construction of Gas Compresseur Foundation, Falre Foundation, Pipe Supports, STS Supoorts, Cable Tray
Supports, Culverts etc .
Also responsible for the construction of OWS Pond , Water Injection Well, Water Well etc.
Supervision of work with SAUDI ARAMCO quality process and Processes for documentation.
Plan for next events and execute on site at time.
Attend client meeting for the progress of work & to fulfill there needs.
Coordinate closely with client representative for the technical matters related to the Planning Execution of
works on time.
Coordinate construction activities by organizing all the necessary resources, materials & manpower required for
the execution of work based on the construction schedule.
Control Day-to-Day activities at site.
Quantity take off from GFC Drawings for planning Purpose.
Raised RFI (Request For Inspection) to the client for every process of work as per SATIP
BBS preparation for structural members like, Shear Wall, Column, Beam, Slab etc. for sub-structure.
BBS checking and certification to client.
Prepare MPR (Monthly Progress report) etc.
Review the Punches and process for related activity.
Take care of punch activity and offer for closer.
Handover the area to Final PMCC after complition of work.
Shuaibah 3 IWP is to construct seawater desalination plant based on Reverse Osmosis technology with a a portable
water production is 600,000 m3 /day through Dual Media Filters & Cartridge Filters. Power requirements for the plant
will be fed from the Grid-SEC and Captive Solar PV (65 MWp).
My major role is complete CCB Building, Sedimentation Basin Tank, Limestone Recharging System Foundation,
Waste Water Treatment Tank, Back Wash Tank, Trasformer Foundation, Pipe Supports Foundations & All
Electrical Manholes, Strom Water Manholes, Duct-Bank etc .
Plan work execution as per weekly schedule.
Folow-up contractors and fulfil their needs with work plan schedules on time.
Attending weekly meetings with client and contractor & discussed on technical problems come during
excecuation of work and provide technical suggesations.
Monitoring of work deeply and fulfil workers needs.
Assign manpower as per required basis on different location of work.
Smooth follow-up daily progress for more better productivity.
Plan for next events and execute on site at time.
Coordinate closely with client for the technical matters related to the Planning Execution of works on time.
Coordinate construction activities by organizing all the necessary resources, materials & manpower required for
the execution of work based on the construction schedule.
Supervision of work with Doosan quality process and Processes for documentation.
Control Day-to-Day activities at site.
Quantity take off from GFC Drawings for planning Purpose.
Raised RFI (Request For Inspection) to the client for every process of work as per Doosan Standard.
BBS checking and certification to client.
Prepare MPR (Monthly Progress report) of different activities.