Professional Documents
Culture Documents
A-R Activities in Namibia
A-R Activities in Namibia
A-R Activities in Namibia
AR-ASB0001
Standardized baseline
Afforestation and reforestation project
activities in Namibia
Version 01.0
AR-ASB0001
Standardized baseline: Afforestation and reforestation project activities in Namibia
Version 01.0
1. Introduction
1.1. Background
1. This standardized baseline provides the baseline land-use scenario and the positive list
for additionality of afforestation and reforestation (A/R) clean development mechanism
(CDM) project activities in the Republic of Namibia.
3. Normative references
5. This standardized baseline is based on the proposed top-down standardized baseline
TSB0001 “Afforestation and reforestation CDM project activities in Namibia”.
6. This standardized baseline is derived from the “Guideline: Establishment of standardized
baselines for afforestation and reforestation project activities under the CDM”.
7. For more information regarding proposed new standardized baselines as well as their
consideration by the CDM Executive Board please refer to:
<http://cdm.unfccc.int/methodologies/standard_base/index.html>.
2 of 3
AR-ASB0001
Standardized baseline: Afforestation and reforestation project activities in Namibia
Version 01.0
(d) A4: Area bounded by the latitudes 18.50 degree S and 19.00 degree S, and the
longitudes 20.50 degree E and 21.00 degree E;
(e) A5: Area bounded by the latitudes 20.00 degree S and 20.50 degree S, and the
longitudes 20.50 degree E and 21.00 degree E.
9. An A/R project activity proposed to be implemented in areas of land located entirely
within the specified geographical region for application of this standardized baseline, as
specified in paragraph 8 above, shall be deemed to be additional.
10. The baseline land-use scenario of an A/R project activity proposed to be implemented in
areas of land located entirely within the specified geographical region for application of
this standardized baseline, as specified in paragraph 8 above, shall be deemed to be the
same as the pre-project land-use scenario.
-----
Document information
3 of 3