PORT CITY BUSINESS CENTER

IT PARK & COMMERCIAL CENTRE


31st & 32nd Floors,
East Tower, World Trade Centre, Echelon Square,
Colombo 01
Document .No CHEC/BC/DPR/ICC/015
Revision No. 00
Date of issue
Page Number 1 OF 2
PROJECT: IT PARK
Title: DAILY MANPOWER / EQUIPMENT UTILIZATION RECORD
Date : 13/03/2024
PLANT & MACHINERY
WORK FORCE
Sunny (Temperature 0-26 0C)
Nos AT SITE
Item
Sunny (Temperature > 26 0C)
STAFF Skid Loader 1
Project Manager 1 Bench Saw
Deputy Project Manager 1 Medium Rain (Rain Fall 0-15mm)
Construction Manager 1 JCB
Planning Engineer 1 Lorry
Heavy Rain (Rain Fall > 15mm)
QA / QC Manager 1 Cab/Van
Engineers 6 Power Saw
Ass. Engineers 1 Backhow
Quantity Surveyor 5 Porker
Store Keeper 1 Leveling Instrument 1
Technical Officer 3 Air compressure MATERIAL AT SITE
Mechanical Forman 1 Welding plant 1 (ON THE DAY)
Draughtsman 1 Grinding machine 1 Item Unit Qty Cum
Admin. Officer 1 Crane (Mobile) R/Mix Concrete Grade 15 m3 14
Survey Engineer 1 Pump Car
Safety Manager 1 Gascutter set 1
Safety Officer 1 Theodolite
Trainee 4 Roller 5T 1
Material Tecnician 1 Cut of Machine
Sub .Con : Asst. Engineer Rammer 1
Sub .Con : Draughtsman Bar Bender 1
Sub .Con : Trainee Drill 1
Ass. Store Keeper Bar Cutter 1
Total 32 G.I. Cutter
WORKERS R.B.C. Cutter
Helpers 13 Plate Compactor 1
Mason 8 Tractor
Tiller High Speed Cutter
Carpenter - Form work 20 Total Station 1
Carpenter - Finishing Chipper Machine
Bar bender 36 1+C39:C61
Waterproofing worker Hammer Drill
Electrician 2 Hand Drill
Painter Gipe Saw WORK CARRIED OUT
Plumber Alimac Work Workers
Description Staff
Aluminium Fabricator Hooist Quantity Skill Unskill
Fire - Worker Poker Cable Screed Laying Concrete has Completed in Building
item 1 2 10
Ceiling workers Blco Poker A. (Grid Q-M / 3-5)
Supervisors Concrete Mixcher 1 Screed Laying Concrete has Completed in Building
item 1 2 10
Mechanics/ Welders 9 Water Jet (High pressure Gun) A. (Grid Q-L / 5-8)
Operator 6 Hand Blower Strip Foundation Base Formwork has Completed in
item 1 1 8
Driver 2 Concrete Distributor Building B. (Grid F-H / 1-4)
Survey Group 2 Stationed pump Strip Foundation Beam R/F has Completed in
item 1 1 6
Rigger 6 Generator (80KV) 2 Building B. (Grid 7a-4a / a-d)
Store / Office Helper 4 Bob Cat Machine 1 Strip Foundation Beam R/F has Completed in
item 1 2 10
Cook/ Sanitary workers Photocopy Machine 1 Building B. (Grid 3a / a-c)
Semi Skills workers Boring Machine
Building C Excavation Work in Progress. item 1 1 8
Security 2 Excavator 210 2
Techncian Bus 54 Seat 1 R/F Bening Works in Bar Bending Area in
item 1 2 10
Supervisors Boom Truck Progress.
Total 110 Light Plant 2
Tipper 2
Whee Lodder 1
Crawler Crane 1
TOTAL 142 TOTAL 26

Note :

Prepared By Checked By
CPCC
Engineer QA/QC Mannager
Location:- Building A Location:- Building A

Location:- Building B Location:- Building B

Location:- Building C