15550

15050

525 525
4500 4500

10T @150mm C/C V 10T @150mm C/C D


10T @125mm C/C M 225 MM GAP WALL
8T @ 200mm C/C B 12T @ 200mm C/C M BETWEEN
PEDESTAL THIS
550 10T @ 200mm C/C D GAP FILLING WITH
ISA 35 X 35X 5 QTY; 4

550
PCC

75mm P.C.C OVER 75mm B.F.S 75mm P.C.C OVER 75mm B.F.S 75mm P.C.C OVER 75mm B.F.S

100

100

100
300

300
COMPACTED SOIL COMPACTED SOIL COMPACTED SOIL

100mm P.C.C OVER 75mm B.F.S/ BOULDER 100mm P.C.C OVER 75mm B.F.S/ BOULDER 100mm P.C.C OVER 75mm B.F.S/ BOULDER 100mm P.C.C OVER 75mm B.F.S/ BOULDER

15550

15050

525 4500 4500 525

600
600

600

600
600 600 600 600
3600

3600

3600

3600
1625
1625

NOTES:-
400
1. ALL DIMENSIONS ARE IN M.M. IF NOT OTHERWISE STATED.
2. ALL DIMENSIONS ARE STRUCTURAL AND DO NOT INCLUDE PLASTER OR OTHER FINISHES.
3. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED AND NO PART OF THE DRAWING SHOULD
BE SCALED.
400 200

SPECIFICATIONS:-
1. FOR SPECIFICATION OF MATERIALS AND WORKMANSHIP N.B.C.2016

400
210
170

HASTO BE FOLLOWED.
150

2. MIX. OF CONCRETE FOR ALL R.C.C. MEMBER SHALL BE M-30 GRADE


CONFORMING TO I.S. 456-2000.& ITS SUBSEQUENT AMENDMENTS
3. ALL REINFORCEMENTS SHALL BE OF TOR STEEL Fe-550 CONFORMING
TO I.S. 1786-2008 CLIENT:-
4.SOIL BEARING CAPACITY CONSIDERED 6.0T/m2.
5.CLEAR COVER OF THE MAIN REINFORCEMENT AS FOLLOWS:-
a) FOUNDATION- 50 M.M.
b) COLUMN & SHEAR WALL-50 M.M, DRAWN BY :- MUNNA AZIZ
c) TIE BEAM-30 M.M.
6. Ld = 50D (D= DIA OF THE REBAR)