PROJECT : INVESTIGATION for LANDSLIDE AREA ENDE, NTT

DAILY REPORT OF DRILLING


(LAPORAN HARIAN PEMBORAN)
DAY (H a r i) : Kamis HOLE NO : LOK 12 BH-1 OPERATOR : Sukani Geologist : Bara
DATE (Tanggal) : 02-09-2021 LOCATION : Ende, NTT GWL :- m (in the morning) Machine : UD-5
Time (Waktu) Depth (Kedalaman) Core Bit Core Drilling Casing Pipe Kind REMARKS
From To From To Cored Recovered Recovery Type Dia. Barrel Method Depth Dia. Of Rock (Keterangan)
(m) (m) (S / D / (D / W / SPT /
(hh:mm) (hh:mm) (m) (m) (%) (M / D)*1 (mm) (m) ( mm )
T)*2 UDS)*3
7:15 7:45 18.40 18.90 0.50 0.50 100 M 76 S D 16.5 89
7:55 8:25 18.90 19.25 0.35 0.35 100 M 76 S D 16.5 89
8:40 9:05 19.25 19.55 0.30 0.30 100 M 76 S D 16.5 89
19.55 19.65 Standard Penetration Test 16.5 89 N1 = 51/10 (blows/cm) N = >50
10:30 11:00 19.65 20.00 0.35 0.35 100 M 76 S D 19.5 89 Tuffaceous Install Casing
Sandstone
11:15 11:45 20.00 20.35 0.35 0.35 100 D 76 T W 19.5 89
13:00 13:45 20.35 21.00 0.65 0.65 100 M 76 S D 19.5 89
14:00 14:50 21.00 21.70 0.70 0.70 100 M 76 S D 19.5 89
15:00 16:00 21.70 22.55 0.85 0.85 100 M 76 S D 19.5 89
16:15 17:00 22.55 23.30 0.75 0.75 100 M 76 S D 19.5 89

*1 M:Metal, D:Diamond *2 S:Single, D:Double, T:Triple *3 D:Dry, W:Wet, SPT:Standart Penetration Test, UDS: Undisturbed Sample
(water loss, spring, cavity, artesian water, machine trouble, jamming, etc. should be recorded)

Submited By (dilaporkan oleh) Checked By (diketahui oleh)

…………………………… …………………………………