Cu piping supporting work

The cu pipes should be laid in the horizontal position and should be


supported well in such a manner that they run in straight line. Fully
threaded GI rods and clamps or adjustable support can be used for
supporting the refrigerant pipes. The pitch of the support should be as
under to avoid sagging in piping.
Nominal 20 or less 22~40 50
Diameter
(mm)
Max. Pitch 1.0 1.0-1.2 1.2-1.5
(m)

In addition to these supports, all Y joints


and elbows should be given an extra
supports.
A cut section of min 5”~6” PVC sheet or
pipe should be placed between the
insulation and support to avoid any
damage to insulation.

30
31
Top View

32
33
34
300mm

35
300mm

1000mm 300mm

36
PVC Sleeves 1000mm
(100~150mm)

1000mm

Liquid Line

1000mm
Gas Line

37
Drain Header Pipe

Cu Pipe Communication cabling

Supporting at bends

38
Additional support at bend with
PVC sleeves and clamping

Use of PVC Sleeves in


civil openings, to
avoid damages to
insulation material
due to cement

39
Additional supports at bends & intermediate location

40
Shaft area cu piping

For vertical cu piping in shaft area


provide supports at 1.5 to 2 Rmt
intervals.

Ensure the pvc sleeves and clamps


or GI wire for clamping of cu piping
at support locations.