PLUMBING WORKS

MECHANICAL WORKS

Item Description Unit Qty Unit Amount


Rate EGP.
PLUMBING INSTALLATION
1 PLUMBING FIXTURES
Supply and installing of sanitary fixtures including
all necessary components, parts, traps, flexible
connections, control valves, waste connections,
assemblies connecting to supply and waste systems,
setting, bedding, sealing, and making good all as per the
specifications and drawings.
water closet (flush tank) No LS
lavatory No LS
shower No LS
kitchen sink No LS

2 PP-R PIPES AND FITTINGS


Supply, install and test of the PP-R pipes for cold & hot water
pipes PN10,pressure 6 bar for Exposed piping and 10 bar for
Empeded piping network c/w fittings, joints, adapters,
brackets, supports, hangers, excavation, backfilling, testing,
and all other necessary accessories as per specifications and
drawings.

50 mm m 18
40 mm m 25
32 mm m 70
25 mm m 90
20 mm m 100

3 VALVE CHAMBER
Diameter of valves are according to pipe diameters
which will be connected with it.
100 mm No 1
75 mm No 1

To Collection EGP

1/110
PLUMBING WORKS
MECHANICAL WORKS

Item Description Unit Qty Unit Amount


Rate EGP.

4 Electrical Water Heater


Supply, install, connect, test and commissioning of
individual horizontal storage electric water heater
, including glass lined tank, heating coil ,controller,
thermostatic controller , sacrificial rod, isolating valves , relief
valves , check valves, Expansion tank ,pipes, fittings,
flanges,and all other accessories as specified and as shown on
drawings.
EWH-1 (100 LITERS) No 3
EWH-2 (50 LITERS) No 4
EWH-2 (30 LITERS) No 8

5 DOMESTIC WATER PUMPS


Supply and install Domestic end suction pump complete
with control panels, valves, and all fittings as
specified and as shown on drawings
Q = 65 GPM & H = 45 M (two on duty + one stand by) Set 1

6 HDPE PIPES AND FITTINGS

Supply, Install, testing and commisioning of HDPE pipe system


for cold water filling line pipes complete with all needed fittings,
valaves, supports, expansion joints, insulations for exposed
pipies … etc all as per specification, regulation and shown on
the drawing & finish the works as conformity with regulations.
And complete with all pressure reducing valaves as per the
project drawing, specification and drawings as following:

100 mm m 180
75 mm m 30

7 GATE VALVE LS

To Collection EGP

2/110
PLUMBING WORKS
MECHANICAL WORKS

Item Description Unit Qty Unit Amount


Rate EGP.

UPVC Pipes and Fittings

Supply, install and testing and commissioning of UPVC


Drainage ,Soil ,Waste , Vent , and Rain Water pipes , Class 3 ,
for ( Above False Ceiling , Under Slab , Under tiles and inside
walls, inside buildings ) Installations as per the project drawing,
specification and QCS as following:
160 mm m 50
110 mm m 370
75 mm m 165
50 mm m 120

Ditto but underground pipes


200 mm m 300
160 mm m 160

Floor Drain

Supply, install, test, and hand-over of floor drains (FD), with


PVC body and 50 mm minimum provided water seal heaight,
The floor drain shall be c/w 150 x 150 mm chrome plated
cover. The cover shall be equipped with threaded round
access opening fitted with removable threaded plate. The floor
drain body shall be equipped with built-in pipe connections
suitable for PVC pipe connections of the same diameter. the
work includes all necessary accessories as per specifications
and drawings.

75 mm No 23

Ceiling Clean Out

Supplying, fixing, testing and commissioning of PVC Floor


/ Ceiling clean out with suitable inlet keys for opening, male
threaded joint / reducer with PVC socket complete, as per the
project drawing, specification and drawings.
110 mm No 10
75 mm No 7

Floor Clean Out

Supply, install, test, and hand-over of floor clean outs


(FCO) of PVC body. The FCO shall be equiped with 150 mm x
150 mm chrome plated cover. The cover shall be equipped
with threaded round access opening fitted with removable
threaded plate. The FCO body shall be equipped with built-in
pipe connections suitable for PVC pipe connections of the
same diameter. work shall be complet with all necessary
accessories as per specifications and drawings:

110 mm No 6
75 mm No 6

To Collection SR

3/110
PLUMBING WORKS
MECHANICAL WORKS

Item Description Unit Qty Unit Amount


Rate EGP.

CONDENSATE DRAINS.

CPVC pipe and fittings including all necessary accessories,


cleanout, p-traps, funnels, supports, blanking plates; jointing in
accordance with manufacturer's instructions complete as
specified ( Above fasle ceiling , at high level ) as per the project
drawing, specification and drawings
50 mm m LS
25 mm m LS

ROOF DRAIN
upplying, installing, connecting, and testing all Roof drains
complete including, gratings, covers and traps and painted by
epoxy , as specified and as shown on drawings
110 mm No 12

4/110
PLUMBING WORKS
MECHANICAL WORKS

Item Description Unit Qty Unit Amount


Rate EGP.

GULLY TRAP:

Supply, install, test, commission and hand over, connecting,


testing and commissioning of gully trap, with all accessories as No 13
per specification

MANHOLE
Supply , installation , connecting ,testing and commissioning of
manhole, included double seal cover with heavy duty , painting
in .
Ø1000 No 24

CATCH BASIN No 18

To Collection EGP
PLUMBING WORKS - MECHANICAL WORKS
Carried to Summary EGP