The document summarizes key details about the New Acropolis Museum in Athens, Greece. It notes that the museum tells the story of life on the Athenian acropolis by uniting formerly dispersed collections, and that site excavation left ruins from the 4th-7th centuries intact and protected beneath the building.
The document summarizes key details about the New Acropolis Museum in Athens, Greece. It notes that the museum tells the story of life on the Athenian acropolis by uniting formerly dispersed collections, and that site excavation left ruins from the 4th-7th centuries intact and protected beneath the building.
The document summarizes key details about the New Acropolis Museum in Athens, Greece. It notes that the museum tells the story of life on the Athenian acropolis by uniting formerly dispersed collections, and that site excavation left ruins from the 4th-7th centuries intact and protected beneath the building.
the 4th throught 7th centuries A.D. left intact and protected beneath the building and made visible through the first floor level
Acropolis museum tells the story of life on
the Athenian acropolis and its surroundings by uniting collections formerly dispersed in multiple institutions, including the small acropolis museum built in the 19th century. Jewish Museum, Berlin
EXPERIENCE EXPERIENCE Schulitz House, LA
On cantilever, cross bracing is used Explosed services highlighted in primary
to take horizontal forces. colours. STRUCTURE CASESTUDY
Due to earthquake zone, The house is a steel frame with
the steel work joints are 150x150mm square tubular columns Roofing material and layers. simple and can allow are supported by three rows of circular generous erection concrete stub columns cast on top of tolerance. the piles and by the retaining wall at the street level. Ar. Tom Kundig (House by the mountain) Foundation Typology Sainsbury Centre, United Kingdom Upper buffer zone containing electrical services.
Joinery between column and truss
Glazed and solid aluminium panels
AREA PROGRAMME
Rules to be followed as Group D Assembly building
1) FAR: 1.50 (without fee) and 2.50 (with fee)
2) Coverage: 40% 3) Access Width: 3.5-7.0m (depending on number of stories. 4) Setback: front yard- min. 5m, avg. 10.5m, side yard-min 1.5m, avg 5m rear side-min 1.5-3.0 m 5) Parking: 1 parking for 1.5sq.mt. • Height: Room- min 4m A/c rooms- min 3m • Toilet Access: height min 2.4m Area: min 1.5 sq.mt. with sides min 1.1 sq.mt. Number of toilets, water closets: 1/200 males and 1/100 females, urinals 1/50 males, wash basin-1/200 males and 1/200 females. • Staircase: width-min 2m height of headrail- 90cm Width of tread – 30cm ENTRANCE • Ramps: ratio 1:10 3%3% • Corridor: width min 1m 15% ADMINISTRATION • Fire Escape staircase: 20% EXHIBITION GALLERY Width- min 75cm Handrail height-100cm WORKSHOP Tread width-min 15cm 4% LABORATORY Allowed straight flight 34% 3% Should have direct connection to the ground 2% 1% AUDITORIUM Separate entrance from internal staircase 5% LIBRARY Travel distance to emergency staircase- max. 30m 9% • Spiral staircase 1% AMENITIES diameter- min 150cm SERVICES Allowed upto 9m unless its connecting to balconies and galleries OPEN SPACES • Door: clear width- 75cm PARKING • Lifts: if exceeds 4 stories TRANSITION AREA BUBBLE DIAGRAM TIME TRAVEL
Stair-Building and the Steel Square: A Manual of Practical Instruction in the Art of Stair-Building and Hand-Railing, and the Manifold Uses of the Steel Square