Project Name.

Date:

Design of Strap Footing 3/21/2024


Sheet No. 1

EXT.FOOT INT.FOOT
b1 0.7 m b2 0.5 m
a1 0.3 m a2 0.5 m
NA 600 kn NB 1200 kn
Nau 900 kn Nbu 1800 kn
Rw =Pe-pPI= 2700 Ru =Rw*1.5 4050 kn
tpc = 0.3
qall 125 KN/m2 L= 5.7 m
fcu 25 N/mm2 fy= 360 N/mm2
e=0.1+0.2*L 1.24 m
R1=Pe *L/(L-e)= 766.8161 KN R2=Pi+Pe-R1= 1033.18 KN
L1pc =2*(e+ae/2) 3.1800 m
B1pc=R1/(qall*L1pc) 1.93 m L2pc 2.875 m
L1pc B1pc L2pc B2pc
3.1800 1.30 2.874973 2.874973
L1rc B1rc L2rc B2rc
3.1800 0.70 notLess 1 2.27 2.27

L1pc B1pc L2pc B2pc


Choose 2.3 unsafe Choose 3.3 3.3
L1rc B1rc L2rc B2rc
0.0000 1.70 notLess 1.7 2.70 2.70

R1u = 1150.22 Kn R2u = 1549.78 Kn


W1 =R1u/L1rc #DIV/0! KN/m2 W2 =Ru2/L2rc 573.99 KN/m2
X1 =(Brc1-bStr)/2 0.65 m X2 1.15 m
F1ac =R1U /(B1r * L1r)= #DIV/0! Kn F2rc 212.59 Kn
M1 = F1ac *( X1*X1)/2 * L1rc= #DIV/0! Kn.m M2 = 379.5516 Kn.m
d=c*(Mmax/b*Fcu)^0.5 #DIV/0! mm d= 374.9 mm
Take Trc = #DIV/0! mm take Tf2 = 400 mm
Choose Tc1 = 400 mm Choose Tf2 = 500 mm
Check shear d= 330 mm d= 430 mm
X = ( B1rc - bstr)/2 )-.5d 0.485 mm X= 0.94 mm
Qu = Fac * X *1.0 #DIV/0! Kn Qu = 198.771 Kn
qu =Qu/b*d #DIV/0! Kn/mm2 qu = 0.462258 Kn/mm2
qsu = 0.16 (Fcu/δc)^0.5 0.653 Kn/mm2 qsu = 0.653197 Kn/mm2
#DIV/0! Safe
Max = #DIV/0! Kn.m Max = 379.5516 Kn.m
As=Max/(J*Fy*d) #DIV/0! mm2 As=Max/(J*Fy*d) 2968.382 mm2
AS /m' #DIV/0! mm2/m AS /m' 1099.401 mm2/m
Asmin=µ1.5*d 495 mm2/m Asmin=µ1.5*d 645 mm2/m
Take As #DIV/0! Take As 1099.401
Page 1
Project Name.
Date:

Design of Strap Footing 3/21/2024


Sheet No. 1
#DIV/0! ɸ 12 10 ɸ 12

Strap Beam Design


b= 400 mm
zero shear X0 = W1/P1= #DIV/0! m
Max =P1*(Xo-C1/2)-W1*(Xo^2)/2 #DIV/0! KN.m
d=c*(Mmax/b*Fcu)^0.5 #DIV/0! mm
Trc = #DIV/0! mm
Take Trc = 1300 mm
Strap Beam Design d= 1230 mm
Qmax i 881.6143 Kn
Qmax e #DIV/0! Kn
Qr = Qmax - W*d/2 528.610 Kn
Qr = Qmax - W*d/2 #DIV/0! Kn
Actual shear
qac = Qr /b*d #DIV/0! Kn/mm2
qcu = 0.24 (Fcu/δc)^0.5 0.979796 Kn/mm2
qmax = 0.7 (Fcu/δc)^0.5 2.857738 Kn/mm2
#DIV/0!
RFT Beam
Sec I - 1 Max = #DIV/0! KN.m
As=Max/(J*Fy*d) #DIV/0! mm2
Asmin=µmin*b*d=(0.225*(Fcu)^.5/Fy) 1537.5 mm2
Take As #DIV/0! mm2
#DIV/0! ɸ 16
Sec 2 -2 M+ve 523.0493 KN.m
As=Max/(J*Fy*d) 1430.06 mm2
Asmin=µmin*b*d=(0.225*(Fcu)^.5/Fy) 1537.5 mm2
Take As 1537.5 mm2
8 ɸ 16

Pc RC RFT
B L d B L d No ɸ Dim
f1 0 2.3 0.3 0.0000 1.70 400 #DIV/0! ɸ 12
f2 3.3 3.3 0.3 2.70 2.70 500 10 ɸ 12
strap-beam 400 1300 sec1-1 #DIV/0! ɸ 16
sec 2-2 8 ɸ 16

Page 2
Project Name.
Date:

Design of Strap Footing 3/21/2024


Sheet No. 1

Page 3